2024/05/17 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 20th - 26th
Streett Intersection From To 11=11111MI Description Department Department Contact
1 Brinker Rd Loop 288 Quail Creek or 05/28/24 06/28/24 Basefailure Repairs and Crack Seal Streets Roy San Miguel Lane Closure
2 Montecito Dr Hickory Creek Rd Palo Verde Dr 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure
3 Montecito or Hickory Creek Rd Clear River Ln 06/03/24 07/19/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
4 Pembrooke PI(2129) Chasewood Ln Longridge Dr 05/27/24 O6/28/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure
Exported on May 17,2024 2:03:35 PM CDT
2 Street Closure Report: Current Closures smartsheet
Wosure End Description Department Department Contact
17AIIredRd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
2 Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
3 Beall St(1400) Nicosia St Hermalinda or 05/06/24 06/07/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure
4 Bell Ave Sycamore St Prairie St 08/21/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
5 Bellaire or Montclair PI McKinney St(East) 04/22/24 05/24/24 Valley Gutter Repair Streets Roy San Miguel Full Closure
6 Bernard St Acme St Roselawn or 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
7 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Broken Arrow Rd Dunes St Old Orchard Ln 05/18/24 06/30/24 Pavement Reconstruction Engineering Taylor Holt Full Closure
10 Camellia St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Churchill or Churchill Cir Windsor or 12/11/23 06/05/24 Utility installations and Engineering Taylor Holt
pavement replacement
12 College Park or Peach St Dead End 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure
13 Collins St Johnson St Dead End West 08/22/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Crawford St Mulberry St Sycamore St 10/09/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Crescent St Ector St Hillcrest St 12/27/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Edwards Rd Forrest Willow Rd Desert Willow or 03/18/24 05/24/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
17 Fairfax Savannah Trail Longridge or 05/20/24 05/24/24 Sewer line trench repair Wastewater Gavin Petner Full Closure
18 Fowler Dr College Park or Peach St 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure
19 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure
20 Highland St Locust St Wainwright St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Hillcrest St Panhandle St Crescent St 12/27/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
22 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 06/05/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
23 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 06/05/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
24 Maple St Locust St Elm St 04/19/24 06/30/24 Pavement replacement. Engineering Scott Fettig Full Closure
25 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
26 Maple St Carroll Blvd Elm St 07/05/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure
28 Masch Branch Rd University or(US 380) Hampton Rd 02/26/24 06/27/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure
adding turn lane. Works Inspections
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 05/31/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP Lane Closure
29 reconstruction of the Colorado
and Mayhill Intersection.
Mayhill Rd(NB) University or(US 380) Prominence Pkwy 04/22/24 05/24/24 Tying new water line into Private Development Zabdiel Mota Lane Closure
30 existing water line on N.Mayhill
Road for 380/Mayhill Industrial.
31 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 05/31/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure
approaches Works Inspections
32 Mulberry St Locust St Elm St 02/19/24 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
33 Mulberry St Bell Ave Industrial St 08/21/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
34 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on May 17,2024 2:03:46 PM CDT
Streett Intersection From To Closure Start Closure End Description Department
Date Date Department Contact Closure Type
35 Myrtle St Fort Worth or(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
36 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
37 Myrtle St Eagle or Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
38 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
39 Old Orchard Ln Windsor Dr Dead End 03/13/24 06/05/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
40 Peach St Bell St Locust St 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure
41 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
42 Poinsettia Blvd Sherman or Picadilly Ln 05/18/24 05/31/24 infrastructure installation on Public Works Inspections Lee Thurmond Full Closure
Poinsetta
43 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure
pavement replacement.
Roselawn Dr Roselawn Cir Railroad crossing 02/05/24 06/01/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave Full Closure
44 new box culvert.8x8,new road
for Roselawn.Eagle Creek PH
3A-4
45 Spencer Rd Loop 288 Mayhill Rd 05/06/24 06/12/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure
46 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 05/31/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
47 Sycamore St Exposition St Crawford St 03/13/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
48 Sycamore St Wood St Crawford St 10/09/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Walt Parker Bonnie Brae Bonnie Brae 05/20/24 05/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Walt Parker Drive,
49 NO ACCESS TO WALT
PARKER FROM BONNIE
BRAE,Access Walt Parker from
North Texas Blvd
50 Waterside PI(7700) Hickory Creek Rd Dawn Light Dr 05/20/24 06/14/24 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure
51 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 06/05/24 Utility installations and Engineering Taylor Holt
pavement replacement
52 Willowwood St Bernard St Jacqueline Dr 12/27/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
53 Wind River Ln @ Shoreline Como Lake or Enchanted Lake or 05/06/24 06/07/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
54 Wisteria St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on May 17,2024 2:03:46 PM CDT
3 Street Closure Report: Completed Closures smartsheet
Description Department Conta ct
17Austin Oak St Mulberry St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure
2t 1-35 Service Rd Bandera St(WB-150') 02/08/24 05/02/24 Utility Relocation Engineering Shawn Messick Full Closure
3arceonaSt 1-35 Service Rd Mesa Dr 04/25/24 05/01/24 Atmos gas relocation Atmos Gavin Feiner Full Closure
4 Bell Ave Sycamore St Eagle Dr 04/15/24 04/24/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Carmel Hills Dr(3405) Las Lomas Ln Portola Ln 04/03/24 05/01/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
6 Elm St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure
Elm St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure
7 Engineering is coring for
upcoming project
8 Leslie St Willowwood St Dudley St 08/31/23 04/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Locust St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure
9 Engineering is coring for
upcoming project
10 Locust St University or(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure
11 Los Colinas St Mesa Dr 1-35 Frontage Rd 03/01/24 04/30/24 Utility Water/Wastewater line Water Wastewater Other Shawn Messick Full Closure
relocation
12 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 02/26/24 04/26/24 Installation of new water main Private Development Zabdiel Mota Lane Closure
line pipe.
13 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 05/15/24 Utility Installations&Pavement Engineering Taylor Holt Full Closure
Reconstruction
14 Mira Vista Dr Buena Vista Dr Palo Verde Dr 04/08/24 05/03/24 Reconstruction Streets Rogelio San Miguel Rolling Closure
15 Nora Ln Central Village Dr Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
16 North Texas Blvd Eagle Dr Highland St 04/29/24 05/03/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
17 Nottingham Dr Kings Row Stratford Ln 04/15/24 04/26/24 Valley Gutter Repair Streets Roy San Miguel Full Closure
18 Oak St 1-35 Frontage Rd Oak St(EB-300') 02/08/24 04/17/24 Utility Relocation Engineering Shawn Messick Lane Closure
19 Osage Ln Huron Cir Cul V Sac 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
20 Pecan St Elm St Locust St 05/13/24 05/13/24 Crane set up to replace air Private Development Pete Leptuch Full Closure
conditioner on top of building
21 Pecan Tree Dr Nora Ln Dead End North 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
22 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
23 Poinsettia Blvd Sherman Dr Picadilly Ln 04/08/24 05/17/24 Infrastructure installation on Public Works Inspections Lee Thurmond Full Closure
Poinsettia
24 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
25 Thomas Emery St. Panhandle St. 04/19/24 05/10/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
26 Thunderbird Dr Crestmeadow St Westview Trl 04/29/24 05/03/24 Curb and Gutter and Sidewalk Streets Roy San Miguel Lane Closure
Repair
27 Underwood St North Texas Blvd Kendolph Dr 08/28/23 04/30/24 Pavement replacement. Engineering Scott Fettig Full Closure
28 University Dr I-35 Frontage Rd University Dr(EB-550') 02/19/24 05/01/24 Utility Relocation Engineering Shawn Messick Lane Closure
29 Westward Dr Northway Southway 04/22/24 05/17/24 Concrete street paving. Private Development Zabdiel Mote Full Closure
30 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/19/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line
31 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/26/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line
Exported on May 17,2024 2:03:58 PM CDT