Loading...
2024/05/31 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jun 3rd — 9th Street/Intersection From To 1 Annistad Ln John Payne Rd Eagle Mountain Dr 06/17/24 07/12/24 ADA and Sidewalk Repair Streets Roy San Miguel Full Closure Exported on May 31,2024 11:37:28 AM CDT 2 Street Closure Report: Current Closures smartsheet 1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II 2 Ave D Chestnut St Mulberry St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 3 Azalea St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 4 Beall St(1400) Nicosia St Hermalinda Dr 05/06/24 06/07/24 Curb and Gutter Repair I Streets Roy San Miguel Lane Closure 5 Bell Ave Sycamore St Prairie St 08/21/23 06/30/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 6 Bernard St Acme St Roselawn Dr 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 7 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 8 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Brinker Rd Loop 288 Quail Creek or 05/28/24 06/28/24 Basefailure Repairs and Crack Streets Roy San Miguel Lane Closure Seal 10 Broken Arrow Rd Dunes St Old Orchard Ln 05/18/24 06/30/24 Pavement Reconstruction Engineering Taylor Holt Full Closure 11 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 12 Broken Bow St Windsor or Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 13 Camellia St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 14 Central Ave Maple St Highland St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 15 Chestnut St Ave C Ave D 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 16 Churchill Dr Churchill Cir Windsor or 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement 17 College Park or Peach St Dead End 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure 18 Collins St Johnson St Dead End West 08/22/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 19 Crawford St Mulberry St Sycamore St 10/09/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 20 Crescent St Ector St Hillcrest St 12/27/23 07/12/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 22 Fowler or College Park or Peach St 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure 23 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 1 Bridge Installation Engineering Dustin Draper Full Closure 24 Highland St Locust St Wainwright St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 25 Hillcrest St Panhandle St Crescent St 12/27/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 27 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 28 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 29 Maple St Locust St Elm St 04/19/24 06/30/24 Pavement replacement. Engineering Scott Fettig Full Closure 30 Maple St Carroll Blvd Elm St 07/05/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 31 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure 32 Masch Branch Rd University or(US 380) Hampton Rd 02/26/24 06/27/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure adding turn lane. Works Inspections Mayhill Rd @ Colorado Blvd Intersection 01/31/24 06/30/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP Lane Closure 33 reconstruction of the Colorado and Mayhill Intersection. Exported on May 31,2024 11:37:40 AM CDT Streett Intersection From To Closure Start Closure End Date Date Description Department Department Contact Closure Type Mayhill Rd @ Colorado Blvd Intersection 05/28/24 08/15/24 This closure will encompass the Engineering John Rhoda Lane Closure 34 reconstruction of the Mayhill Rd /Colorado Blvd Intersection. 35 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 O6/14/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure approaches Works Inspections 36 Montecito Or Hickory Creek Rd Clear River Ln 06/03/24 07/19/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 37 Montecito Or Hickory Creek Rd Palo Verde Dr 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure 38 Mulberry St Locust St Elm St 02/19/24 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 39 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 40 Mulberry St Bell Ave Industrial St 08/21/23 07/12/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 41 Myrtle St Fort Worth or(HW377) Eagle or 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 42 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 43 Myrtle St Eagle Or Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 44 Old Orchard Ln Windsor Dr Dead End 03/13/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 45 Peach St Bell St Locust St 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure 46 Pembrooke PI(2129) Chasewood Ln Longridge Dr 05/27/24 06/28/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure 47 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 48 Poinsettia Blvd Sherman Dr Picadilly Ln 05/18/24 06/07/24 infrastructure installation on Public Works Inspections Lee Thurmond Full Closure Poinsetta 49 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure pavement replacement. 50 Spencer Rd Loop 288 Mayhill Rd 05/06/24 06/12/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure 51 Sycamore St Exposition St Crawford St 03/13/23 06/14/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 52 Sycamore St Wood St Crawford St 10/09/23 06/14/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 53 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 06/28/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad Walt Parker Bonnie Brae Bonnie Brae 05/20/24 06/07/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line crossing Walt Parker Drive, 54 NO ACCESS TO WALT PARKER FROM BONNIE BRAE,Access Walt Parker from North Texas Blvd 55 Waterside PI(7700) Hickory Creek Rd Dawn Light Dr 05/20/24 06/14/24 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure 56 Welch St S Eagle Or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 57 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement 58 Wind River Ln @ Shoreline Como Lake Dr Enchanted Lake Dr 05/06/24 06/07/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure Exported on May 31,2024 11:37:40 AM CDT 3 Street Closure Report: Completed Closures smartsheet Description Department Contact "M 17Austin Oak St Mulberry St 04/29/24 0S/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure 2St 1-35 Service Rd Bandera St(WB-150') 02/08/24 05/02/24 Utility Relocation Engineering Shawn Messick Full Closure 3a St 1-35 Service Rd Mesa Dr 04/25/24 05/01/24 Atmos gas relocation Atmos Gavin Petner Full Closure 4 Bellaire Dr Montclair PI McKinney St(East) 04/22/24 05/29/24 Valley Gutter Repair Streets Roy San Miguel Full Closure 5 Carmel Hills or(3405) Las Lomas Ln Portola Ln 04/03/24 05/01/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure 6 Edwards Rd Forrest Willow Rd Desert Willow Dr 03/18/24 05/24/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 7 Elm St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure Elm St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure 8 Engineering is coring for upcoming project 9 Fairfax Rd Savannah Trail Longridge Dr 05/20/24 05/24/24 Sewer line trench repair Wastewater Gavin Petner Full Closure Locust St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure 10 Engineering is coring for upcoming project 11 Locust St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure Mayhill Rd(NB) University Dr(US 380) Prominence Pkwy 04/22/24 05/24/24 Tying new water line into Private Development Zabdiel Mote Lane Closure 12 existing water line on N.Mayhill Road for 380/Mayhill Industrial. 13 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 05/15/24 Utility Installations&Pavement Engineering Taylor Holt Full Closure Reconstruction 14 Mira Vista Dr Buena Vista Dr Palo Verde Dr 04/08/24 05/03/24 Reconstruction Streets Rogelio San Miguel Rolling Closure 15 Nora Ln Central Village Dr Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 16 North Texas Blvd Eagle Dr Highland St 04/29/24 05/03/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 17 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 18 Pecan St Elm St Locust St 05/13/24 05/13/24 Crane set up to replace air Private Development Pete Leptuch Full Closure conditioner on top of building 19 Pecan Tree Dr Nora Ln Dead End North 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 20 Pembrooke PI Chasewood Ln Longridge Dr 04/17/24 05/31/24 stormwater replacement Drainage Stephen Bonner Lane Closure 21 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 22 Poinsettia Blvd Sherman Dr Picadilly Ln 04/08/24 05/17/24 Infrastructure installation on Public Works Inspections Lee Thurmond Full Closure Poinsettia 23 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure Roselawn Dr Roselawn Cir Railroad crossing 02/05/24 06/01/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave Full Closure 24 new box culvert.8x8,new road for Roselawn.Eagle Creek PH 3A-4 25 Thomas St Emery St Panhandle St 04/19/24 05/10/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 26 Thunderbird Dr Crestmeadow St Westview Tit 04/29/24 05/03/24 Curb and Gutter and Sidewalk Streets Roy San Miguel Lane Closure Repair 27 University Dr 1-35 Frontage Rd University Dr(EB-550') 02/19/24 05/01/24 Utility Relocation Engineering Shawn Messick Lane Closure 28 Walnut St Elm St Locust St 05/24/24 05/24/24 Installing new air conditioning Private Development Jayson Raymer Full Closure unit by crane 29 Westward Dr Northway Southway 04/22/24 05/17/24 Concrete street paving. Private Development Zabdiel Mota Full Closure 30 Willowwood St Bernard St Jacqueline Dr 12/27/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 31 Wisteria St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on May 31,2024 11:37:51 AM CDT