2024/06/07 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Jun 10th — 16th
Street/Intersection Description Department Department Contact Closure Type
1 Amistad Ln John Payne Rd Eagle Mountain Dr 06/17/24 07/12/24 ADA and Sidewalk Repair Streets Roy San Miguel Full Closure
Exported on June 7,2024 11:19:38 AM CDT
2 Street Closure Report: Current Closures smartsheet
ELJ� III End n Department Contact
Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Ave D Chestnut St Mulberry St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
3 Azalea St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Bell Ave Sycamore St Prairie St 08/21/23 06/30/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
5 Bernard St Acme St Roselawn Dr 05/30/23 O6/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 06/14/24 Floyd Smith going to install 5ft Other Muhamad Madhat Lane Closure
6 intersection wide temp sidewalk at
southeast corner of the
intersection
7 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Brinker Rd Loop 288 Quail Creek or 05/28/24 06/28/24 Basefailure Repairs and Crack Streets Roy San Miguel Lane Closure
Seal
10 Broken Arrow Rd Dunes St Old Orchard Ln 05/18/24 06/30/24 Pavement Reconstruction Engineering Taylor Holt Full Closure
11 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
12 Broken Bow St Windsor or Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
13 Camellia St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Central Ave Maple St Highland St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Chestnut St Ave C Ave D 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Churchill or Churchill Cir Windsor or 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt
pavement replacement
17 College Park Dr Peach St Dead End 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure
18 Collins St Johnson St Dead End West 08/22/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
19 Crawford St Mulberry St Sycamore St 10/09/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Crescent St Ector St Hillcrest St 12/27/23 07/12/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
22 Fowler or College Park or Peach St 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure
23 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure
24 Highland St Locust St Wainwright St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
25 Hillcrest St Panhandle St Crescent St 12/27/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
26 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
27 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
28 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
29 Maple St Locust St Elm St 04/19/24 06/30/24 Pavement replacement. Engineering Scott Fettig Full Closure
30 Maple St Carroll Blvd Elm St 07/05/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
31 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure
32 Masch Branch Rd University or(US 380) Hampton Rd 02/26/24 06/27/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure
adding turn lane. Works Inspections
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 06/30/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP Lane Closure
33 reconstruction of the Colorado
and Mayhill Intersection.
Exported on June 7,2024 11:19:49 AM CDT
Streett Intersection From To Closure Start Closure End
Date Date Description Department Department Contact Closure Type
Mayhill Rd @ Colorado Blvd Intersection 05/28/24 08/15/24 This closure will encompass the Engineering John Rhoda Lane Closure
34 reconstruction of the Mayhill Rd
/Colorado Blvd Intersection.
35 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 O6/14/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure
approaches Works Inspections
36 Montecito or Hickory Creek Rd Clear River Ln 06/03/24 07/19/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
37 Montecito or Hickory Creek Rd Palo Verde Dr 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure
38 Mulberry St Locust St Elm St 02/19/24 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
39 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
40 Mulberry St Bell Ave Industrial St 08/21/23 07/12/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
41 Myrtle St Fort Worth Dr(HW377) Eagle or 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
42 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
43 Myrtle St Eagle or Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
44 Old Orchard Ln Windsor Dr Dead End 03/13/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
45 Peach St Bell St Locust St 10/02/23 06/21/24 Street reconstruct Streets Roy San Miguel Full Closure
46 Pembrooke PI(2129) Chasewood Ln Longridge Dr 05/27/24 06/28/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure
47 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
48 Poinsettia Blvd Sherman Dr Picadilly Ln 05/18/24 06/21/24 infrastructure installation on Public Works Inspections Lee Thurmond Full Closure
Poinsetta
49 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure
pavement replacement.
50 Spencer Rd Loop 288 Mayhill Rd 05/06/24 06/12/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure
51 Sycamore St Exposition St Crawford St 03/13/23 06/14/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
52 Sycamore St Wood St Crawford St 10/09/23 06/14/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
53 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 06/28/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
Walt Parker Bonnie Brae Bonnie Brae 06/10/24 06/14/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Walt Parker Drive,
54 NO ACCESS TO WALT
PARKER FROM BONNIE
BRAE,Access Walt Parker from
North Texas Blvd
55 Waterside PI(7700) Hickory Creek Rd Dawn Light Dr 05/20/24 06/14/24 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure
56 Welch St S Eagle or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
57 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt
pavement replacement
Exported on June 7,2024 11:19:49 AM CDT
3 Street Closure Report: Completed Closures smartsheet
7Ave
�- • • -•. •1 H Ave H Stella St 02/26/24 04/16/24 DME Conduit Private Development Ethan Keith Lane Closure
2all St(1400) Nicosia St Hermalinda Dr 05/06/4 06/07/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure
3ellaire or Montclair PI McKinney St(East) 04/22/24 05/29/24 Valley Gutter Repair Streets Roy San Miguel Full Closure
4 Edwards Rd Forrest Willow Rd Desert Willow Dr 03/18/24 05/24/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
51 Fairfax Rd Savannah Trail Longridge Dr 05/20/24 05/24/24 Sewer line trench repair Wastewater Gavin Petner Full Closure
Mayhill Rd(NB) University Dr(US 380) Prominence Pkwy 04/22/24 05/24/24 Tying new water line into Private Development Zabdiel Mote Lane Closure
6 existing water line on N.Mayhill
Road for 380/Mayhill Industrial.
7 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 05/15/24 Utility Installations&Pavement Engineering Taylor Holt Full Closure
Reconstruction
8 Nora Ln Central Village Dr Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
9 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Pecan St Elm St Locust St 05/13/24 05/13/24 Crane set up to replace air Private Development Pete Leptuch Full Closure
conditioner on top of building
11 Pecan Tree or Nora Ln Dead End North 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
12 Pembrooke PI Chasewood Ln Longridge or 04/17/24 05/31/24 stormwater replacement Drainage Stephen Bonner Lane Closure
13 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
14 Poinsettia Blvd Sherman Dr Picadilly Ln 04/08/24 05/17/24 Infrastructure installation on Public Works Inspections Lee Thurmond Full Closure
Poinsettia
15 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
Roselawn Dr Roselawn Cir Railroad crossing 02/05/24 06/01/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave Full Closure
16 new box culvert.8x8,new road
for Roselawn.Eagle Creek PH
3A-4
17 Thomas St Emery St Panhandle St 04/19/24 05/10/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
18 Walnut St Elm St Locust St 05/24/24 05/24/24 Installing new air conditioning Private Development Jayson Raymer Full Closure
unit by crane
19 Westward or Northway Southway 04/22/24 05/17/24 Concrete street paving. Private Development Zabdiel Mote Full Closure
20 Willowwood St Bernard St Jacqueline or 12/27/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
21 Wind River Ln @ Shoreline Como Lake Dr Enchanted Lake Dr 05/06/24 06/07/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
22 Wisteria St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on June 7,2024 11:20:02 AM CDT