Loading...
2024/06/21 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jun 24th - 30th Street/Intersection Description Department Department Contact Closure Type 1 2nd St Elm St N Locust St N 07/08/24 07/26/24 Sidewalk Repair Streets Roy San Miguel Lane Closure Exported on June 21,2024 11:24:35 AM CDT 2 Street Closure Report: Current Closures smartsheet sure End Description Department Department Contact Date 1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II 2 Amistad Ln John Payne Rd Eagle Mountain or 06/17/24 07/12/24 ADA and Sidewalk Repair Streets Roy San Miguel Full Closure 3 Ave A Eagle or Collins St W 06/06/24 07/05/24 Gas relocations for NB6 Public Works Inspections Alexander Cervantes Lane Closure 4 Ave D Chestnut St Mulberry St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Azalea St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Bell Ave Sycamore St Prairie St 08/21/23 06/30/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 7 Bernard St Acme St Roselawn Dr 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/01/24 Floyd Smith going to install 5ft Other Muhamad Madhat Lane Closure 8 intersection wide temp sidewalk at southeast corner of the intersection 9 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Brinker Rd Loop 288 Quail Creek or 05/28/24 06/28/24 Basefailure Repairs and Crack Streets Roy San Miguel Lane Closure Seal 12 Broken Arrow Rd Dunes St Old Orchard Ln 05/18/24 06/30/24 Pavement Reconstruction Engineering Taylor Holt Full Closure 13 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 14 Broken Bow St Windsor Dr Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 15 Camellia St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 16 Central Ave Maple St Highland St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 17 Chestnut St Ave C Ave D 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 18 Churchill or Churchill Cir Windsor Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement 19 College Park or Peach St Dead End 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 20 Collins St Johnson St Dead End West 08/22/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Crawford St Mulberry St Sycamore St 10/09/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 22 Crescent St Ector St Hillcrest St 12/27/23 07/12/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 23 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction Edwards Rd @ Colorado Blvd @ Edwards/DCTA Rail Rd 06/07/24 08/30/24 Various Lanes will be closed to Other Tracy L.Beck,PE,PMP Lane Closure facilitate the construction of Mayhill Road Bridge and the reconstruction of 24 Mayhill/Colorado Intersection and the Edwards/Mayhill Intersection. Access will be maintained. No detours will be used. Signs and Message Boards will provide details Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 08/30/24 This closure is required to Engineering Other Tracy L.Beck,PE,PMP Full Closure 25 construct the connection of"old to new'Mayhill Road north of the Mobilie Home Park 26 Fowler or College Park or Peach St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 27 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure 28 Highland St Locust St Wainwright St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 29 Hillcrest St Panhandle St Crescent St 12/27/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on June 21,2024 11:24:46 AM CDT ClosureStreett Intersection From To Dat_ �'_ Description DepartmentDepartment 30 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 31 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 32 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 33 Maple St Locust St Elm St 04/19/24 06/30/24 Pavement replacement. Engineering Scott Fettig Full Closure 34 Maple St Carroll Blvd Elm St 07/05/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 35 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure 36 Masch Branch Rd University Dr(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure adding turn lane. Works Inspections Mayhill Rd @ Colorado Blvd Intersection 01/31/24 06/30/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP Lane Closure 37 reconstruction of the Colorado and Mayhill Intersection. Mayhill Rd @ Colorado Blvd Intersection 05/28/24 08/15/24 This closure will encompass the Engineering John Rhoda Lane Closure 38 reconstruction of the Mayhill Rd /Colorado Blvd Intersection. 39 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 07/05/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure approaches Works Inspections 40 Montecito or Hickory Creek Rd Clear River Ln 06/03/24 07/19/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 41 Montecito or Hickory Creek Rd Palo Verde Dr 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure 42 Mulberry St Locust St Elm St 02/19/24 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 43 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 44 Mulberry St Bell Ave Industrial St 08/21/23 07/12/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 45 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 46 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 47 Myrtle St Eagle Or Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 48 Old Orchard Ln Windsor Dr Dead End 03/13/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 49 Peach St Bell St Locust St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 50 Pembrooke PI(2129) Chasewood Ln Longridge Dr 05/27/24 06/28/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure 51 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 52 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure pavement replacement. 53 Spencer Rd Loop 288 Mayhill Rd 05/06/24 07/26/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure 54 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 06/28/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 55 Sycamore St Exposition St Crawford St 03/13/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 56 Sycamore St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Texas St Bell Ave N Vine St 06/14/24 06/25/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure 57 Texas St,south,west,and north 58 Welch St S Eagle Or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 59 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement Exported on June 21,2024 11:24:46 AM CDT 3 Street Closure Report: Completed Closures smartsheet Description Department Department Contact 1 Beall St(1400) Nicosia St Hermalinda or 05/06/24 06/07/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure 2 Bellaire or Montclair PI McKinney St(East) 04/22/24 05/29/24 Valley Gutter Repair Streets Roy San Miguel Full Closure 3 Edwards Rd Forrest Willow Rd Desert Willow Dr 03/18/24 05/24/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 4 Fairfax Rd Savannah Trail Longridge Dr 05/20/24 05/24/24 Sewer line trench repair Wastewater Gavin Father Full Closure Mayhill Rd(NB) University Dr(US 380) Prominence Pkwy 04/22/24 05/24/24 Tying new water line into Private Development Zabdiel Mote Lane Closure 5 existing water line on N.Mayhill Road for 380/Mayhill Industrial. 6 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 7 Pembrooke PI Chasewood Ln Longridge Dr 04/17/24 05/31/24 stormwater replacement Drainage Stephen Bonner Lane Closure 8 Poinsettia Blvd Sherman Dr Picadilly Ln 05/18/24 06/21/24 infrastructure installation on Public Works Inspections Lee Thurmond Full Closure Poinsetta Roselawn Dr Roselawn Cir Railroad crossing 02/05/24 06/01/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave Full Closure 9 new box culvert.8x8,new road for Roselawn.Eagle Creek PH 3A-4 10 Walnut St Elm St Locust St 05/24/24 05/24/24 Installing new air conditioning Private Development Jayson Raymer Full Closure unit by crane Walt Parker Bonnie Brae Bonnie Brae 06/10/24 06/14/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line crossing Walt Parker Drive, 11 NO ACCESS TO WALT PARKER FROM BONNIE BRAE,Access Walt Parker from North Texas Blvd 12 Waterside PI(7700) Hickory Creek Rd Dawn Light Dr 05/20/24 06/14/24 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure 13 Willowwood St Bernard St Jacqueline Dr 12/27/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 14 Wind River Ln @ Shoreline Como Lake or Enchanted Lake Dr 05/06/24 06/07/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure 15 Wisteria St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on June 21,2024 11:24:58 AM CDT