2024/07/12 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Jul 15th - 21 st
Street/Intersection Department Contact Closure Type
1 Dominion St Realm St Province St 07/29/24 08/16/24 Concrete Panel Repair Roy San Miguel Lane Closure
Exported on July 12,2024 11:12:21 AM CDT
2 Street Closure Report: Current Closures smartsheet
ll=� ML jXgW&&&jV.=T11osure End Description FD.partment Department Contact Closure Type
1 2nd st Elm St N Locust St N 07/08/24 07/26/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
3 Ave D Chestnut St Mulberry St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Bell Ave Sycamore St Prairie St 08/21/23 07/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
5 Bernard St Acme St Roselawn Dr 05/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/31/24 Floyd Smith going to install 5ft Other Muhamad Madhat Lane Closure
6 intersection wide temp sidewalk at
southeast corner of the
intersection
7 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
8 Broken Bow St Windsor or Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
9 Central Ave Maple St Highland St 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Chestnut St Ave C Ave D 06/03/24 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Churchill or Churchill Cir Windsor or 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt
pavement replacement
12 Collins St Johnson St Dead End West 08/22/23 07/19/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Crescent St Ector St Hillcrest St 12/27/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
Edwards Rd @ Colorado Blvd @ Edwards/DCTA Rail Rd 06/07/24 08/30/24 Various Lanes will be closed to Other Tracy L.Beck,PE,PMP Lane Closure
facilitate the construction of
Mayhill Road Bridge and the
reconstruction of
15 Mayhill/Colorado Intersection
and the Edwards/Mayhill
Intersection. Access will be
maintained. No detours will be
used. Signs and Message
Boards will provide details
Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 08/30/24 This closure is required to Engineering Other Tracy L.Beck,PE,PIMP Full Closure
16 construct the connection of"Old
to new'Mayhill Road north of
the Mobilie Home Park
17 Heritage Trl Linden Dr Panhandle St 07/15/24 07/29/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure
18 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure
19 Highland St Locust St Wainwright St 01/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Hillcrest St Panhandle St Crescent St 12/27/23 07/19/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
22 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/09/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure
23 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
24 Maple St Elm St Carroll Blvd 09/15/23 07/19/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
25 Maple St Locust St Elm St 04/19/24 07/19/24 Pavement replacement. Engineering Scott Fettig Full Closure
26 Maple St Carroll Blvd Elm St 07/05/23 07/19/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure
28 Masch Branch Rd University or(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure
adding turn lane. Works Inspections
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 08/30/24 This closure will encompass the Engineering John Rhoda Lane Closure
29 reconstruction of the Mayhill Rd
/Colorado Blvd Intersection.
Exported on July 12,2024 11:12:32 AM CDT
Streett Intersection From To Closure Start Closure End Description Department Department Contact Closure Type
Date Date
30 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 07/19/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure
approaches Works Inspections
31 Montecito Or Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
32 Montecito Or Hickory Creek Rd Palo Verde Dr 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure
33 Mulberry St Locust St Elm St 02/19/24 07/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
34 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
35 Old Orchard Ln Windsor Dr Dead End 03/13/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
36 Panhandle St Heritage Tri Panhandle Dr 07/15/24 07/29/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure
37 Panhandle St Heritage Tri Stanley St 07/15/24 07/29/24 Drive Approach Public Works Inspections Collin Cole Lane Closure
38 Pierce St Maple St Highland St 07/05/23 07/31/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
39 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure
pavement replacement.
40 Spencer Rd Loop 288 Mayhill Rd 05/06/24 07/26/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure
41 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 07/26/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
42 Welch St S Eagle Or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
43 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt
pavement replacement
Exported on July 12,2024 11:12:32 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection qF From Description Department Department Contact
1 Amistad Ln John Payne Rd Eagle Mountain Dr 06/17/24 07/12/24 ADA and Sidewalk Repair Streets Roy San Miguel Full Closure
2 Ave A Eagle Dr Collins St W 06/06/24 06/27/24 Gas relocations for NB6 Public Works Inspections Alexander Cervantes Lane Closure
3 Azalea St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Brinker Rd Loop 288 Quail Creek Or 05/28/24 07/05/24 Basefailure Repairs and Crack Streets Roy San Miguel Lane Closure
Seal
7 Broken Arrow Rd Dunes St Old Orchard Ln 05/18/24 06/30/24 Pavement Reconstruction Engineering Taylor Holt Full Closure
8 Camellia St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 College Park Dr Peach St Dead End 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure
10 Crawford St Mulberry St Sycamore St 10/09/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Fowler Dr College Park Dr Peach St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure
12 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
15 Myrtle St Eagle Dr Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Peach St Bell St Locust St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure
17 Pembrooke PI(2129) Chasewood Ln Longridge Dr 05/27/24 07/05/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure
18 Poinsettia Blvd Sherman Dr Picadilly Ln 05/18/24 06/21/24 infrastructure installation on Public Works Inspections Lee Thurmond Full Closure
Poinsetta
19 Sycamore St Exposition St Crawford St 03/13/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Sycamore St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Texas St Bell Ave N Vine St 06/14/24 06/25/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure
21 Texas St,south,west,and
north
Walt Parker Bonnie Brae Bonnie Brae 06/10/24 06/14/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Walt Parker Drive,
22 NO ACCESS TO WALT
PARKER FROM BONNIE
BRAE,Access Walt Parker from
North Texas Blvd
23 Waterside PI(7700) Hickory Creek Rd Dawn Light Dr 05/20/24 06/14/24 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure
Exported on July 12,2024 11:12:47 AM CDT