2024/07/26 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Jul 29th - Aug 4th
Exported on July 26,2024 11:41:00 AM CDT
2 Street Closure Report: Current Closures smartsheet
sure End Description Department Department Conta����
Date
1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Audra Ln Stockton St Mockingbird Ln 07/29/24 08/30/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure
2 to existing City of Denton
drainage.
3 Ave D Chestnut St Mulberry St 06/03/24 08/09/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Bell Ave Sycamore St Prairie St 08/21/23 07/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
5 Bernard St Acme St Roselawn Dr 05/30/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/31/24 Floyd Smith going to install 5ft Other Muhamad Madhat Lane Closure
6 intersection wide temp sidewalk at
southeast corner of the
intersection
7 Bonnie Brae St S Airport Road/FM 1515 Walt Parker Dr 07/29/24 08/09/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line.
8 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
9 Broken Bow St Windsor Dr Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
10 Central Ave Maple St Highland St 06/03/24 08/23/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
12 Crescent St Ector St Hillcrest St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Dominion St Realm St Province St 07/29/24 08/16/24 Concrete Panel Repair Roy San Miguel Lane Closure
14 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
15 Dunes St @ Broken Bow St Intersection 07/26/24 07/29/24 Concrete Intersection Pour for Engineering Sheldon Gatewood Full Closure
Neighborhood 4 Project
Edwards Rd @ Colorado Blvd @ Edwards/DCTA Rail Rd 06/07/24 08/30/24 Various Lanes will be closed to Other Tracy L.Beck,PE,PMP Lane Closure
facilitate the construction of
Mayhill Road Bridge and the
reconstruction of
16 Mayhill/Colorado Intersection
and the Edwards/Mayhill
Intersection. Access will be
maintained. No detours will be
used. Signs and Message
Boards will provide details
Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 08/30/24 This closure is required to Engineering Other Tracy L.Beck,PE,PMP Full Closure
17 construct the connection of"old
to new'Mayhill Road north of
the Mobilie Home Park
18 Heritage Trl Linden Dr Panhandle St 07/15/24 08/09/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure
19 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure
20 Highland St Locust St Wainwright St 01/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Hillcrest St Panhandle St Crescent St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
22 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/09/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure
23 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure
24 Masch Branch Rd University Dr(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure
adding turn lane. Works Inspections
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 08/30/24 This closure will encompass the Engineering John Rhoda Lane Closure
25 reconstruction of the Mayhill Rd
/Colorado Blvd Intersection.
26 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 08/09/24 Installation of new driveway Private Development Public Zabdiel Mots Lane Closure
approaches Works Inspections
27 Mesa Dr Bandera St University Dr/US 380 07/29/24 08/02/24 Atmos gas relocation street Atmos Gavin Petner Lane Closure
repairs
28 Montecito Dr Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
29 Montecito Dr Hickory Creek Rd Palo Verde Dr 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure
Exported on July 26,2024 11:41:15 AM CDT
Streett Intersection From To Closure Start Closure End Description Department Department Contact Closure Type
Date Date 1
30 Mulberry St Locust St Elm St 02/19/24 07/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
31 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
32 Panhandle St Heritage Tri Panhandle Dr 07/15/24 08/09/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure
33 Panhandle St Heritage Tri Stanley St 07/15/24 08/09/24 Drive Approach Public Works Inspections Collin Cole Lane Closure
34 Pierce St Maple St Highland St 07/05/23 07/31/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
35 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure
pavement replacement.
Stadium or Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Stadium Drive,NO
ACCESS TO UNIT STADIUM
36 FROM BONNIE BRAE. Use
parking lot entrance off 35E
Service Rd or North Texas Blvd
to access Stadium
37 Stallion St Oak Creek Ln Cul-de-sac 07/24/24 07/29/24 Driveway Repair Public Works Inspections Delilah Garcia Lane Closure
38 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 08/23/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
39 Welch St S Eagle or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on July 26,2024 11:41:15 AM CDT
3 Street Closure Report: Completed Closures smartsheet
1 Street/Intersection Fror. 0 Description Department Department Contact
1 2nd St Elm St N Locust St N 07/08/24 07/19/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
2 Amistad Ln John Payne Rd Eagle Mountain Dr 06/17/24 07/12/24 ADA and Sidewalk Repair Streets Roy San Miguel Full Closure
3 Ave A Eagle Dr Collins St W 06/06/24 06/27/24 Gas relocations for NB6 Public Works Inspections Alexander Cervantes Lane Closure
4 Azalea St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
51 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
7 Brinker Rd Loop 288 Quail Creek or 05/28/24 07/05/24 Basefailure Repairs and Crack Streets Roy San Miguel Lane Closure
Seal
8 Broken Arrow Rd Dunes St Old Orchard Ln 05/18/24 06/30/24 Pavement Reconstruction Engineering Taylor Holt Full Closure
9 Camellia St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Churchill Dr Churchill Cir Windsor Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt
pavement replacement
11 College Park or Peach St Dead End 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure
12 Collins St Johnson St Dead End West 08/22/23 07/26/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Crawford St Mulberry St Sycamore St 10/09/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Fowler Dr College Park Dr Peach St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure
15 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
16 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
17 Maple St Elm St Carroll Blvd 09/15/23 07/26/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
18 Maple St Locust St Elm St 04/19/24 07/26/24 Pavement replacement. Engineering Scott Fettig Full Closure
19 Maple St Carroll Blvd Elm St 07/05/23 07/26/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
22 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
23 Myrtle St Eagle Dr Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
24 Old Orchard Ln Windsor Dr Dead End 03/13/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
25 Peach St Bell St Locust St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure
26 Pembrooke PI(2129) Chasewood Ln Longridge Dr 05/27/24 07/05/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure
27 Spencer Rd Loop 288 Mayhill Rd 05/06/24 07/18/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure
28 Sycamore St Exposition St Crawford St 03/13/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
29 Sycamore St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure
30 Texas St,south,west,and
north
Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure
31 Texas St,south,west,and
north
32 Wellington or North of Heather Ln Churchill Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt
pavement replacement
Exported on July 26,2024 11:41:25 AM CDT