Loading...
2024/07/26 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jul 29th - Aug 4th Exported on July 26,2024 11:41:00 AM CDT 2 Street Closure Report: Current Closures smartsheet sure End Description Department Department Conta���� Date 1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II Audra Ln Stockton St Mockingbird Ln 07/29/24 08/30/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure 2 to existing City of Denton drainage. 3 Ave D Chestnut St Mulberry St 06/03/24 08/09/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 4 Bell Ave Sycamore St Prairie St 08/21/23 07/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 5 Bernard St Acme St Roselawn Dr 05/30/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/31/24 Floyd Smith going to install 5ft Other Muhamad Madhat Lane Closure 6 intersection wide temp sidewalk at southeast corner of the intersection 7 Bonnie Brae St S Airport Road/FM 1515 Walt Parker Dr 07/29/24 08/09/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line. 8 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 9 Broken Bow St Windsor Dr Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 10 Central Ave Maple St Highland St 06/03/24 08/23/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 12 Crescent St Ector St Hillcrest St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Dominion St Realm St Province St 07/29/24 08/16/24 Concrete Panel Repair Roy San Miguel Lane Closure 14 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 15 Dunes St @ Broken Bow St Intersection 07/26/24 07/29/24 Concrete Intersection Pour for Engineering Sheldon Gatewood Full Closure Neighborhood 4 Project Edwards Rd @ Colorado Blvd @ Edwards/DCTA Rail Rd 06/07/24 08/30/24 Various Lanes will be closed to Other Tracy L.Beck,PE,PMP Lane Closure facilitate the construction of Mayhill Road Bridge and the reconstruction of 16 Mayhill/Colorado Intersection and the Edwards/Mayhill Intersection. Access will be maintained. No detours will be used. Signs and Message Boards will provide details Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 08/30/24 This closure is required to Engineering Other Tracy L.Beck,PE,PMP Full Closure 17 construct the connection of"old to new'Mayhill Road north of the Mobilie Home Park 18 Heritage Trl Linden Dr Panhandle St 07/15/24 08/09/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure 19 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure 20 Highland St Locust St Wainwright St 01/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Hillcrest St Panhandle St Crescent St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 22 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/09/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure 23 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure 24 Masch Branch Rd University Dr(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure adding turn lane. Works Inspections Mayhill Rd @ Colorado Blvd Intersection 01/31/24 08/30/24 This closure will encompass the Engineering John Rhoda Lane Closure 25 reconstruction of the Mayhill Rd /Colorado Blvd Intersection. 26 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 08/09/24 Installation of new driveway Private Development Public Zabdiel Mots Lane Closure approaches Works Inspections 27 Mesa Dr Bandera St University Dr/US 380 07/29/24 08/02/24 Atmos gas relocation street Atmos Gavin Petner Lane Closure repairs 28 Montecito Dr Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 29 Montecito Dr Hickory Creek Rd Palo Verde Dr 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure Exported on July 26,2024 11:41:15 AM CDT Streett Intersection From To Closure Start Closure End Description Department Department Contact Closure Type Date Date 1 30 Mulberry St Locust St Elm St 02/19/24 07/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 31 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 32 Panhandle St Heritage Tri Panhandle Dr 07/15/24 08/09/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure 33 Panhandle St Heritage Tri Stanley St 07/15/24 08/09/24 Drive Approach Public Works Inspections Collin Cole Lane Closure 34 Pierce St Maple St Highland St 07/05/23 07/31/24 Utility installations and Scott Fettig Full Closure pavement replacement. 35 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure pavement replacement. Stadium or Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line crossing Stadium Drive,NO ACCESS TO UNIT STADIUM 36 FROM BONNIE BRAE. Use parking lot entrance off 35E Service Rd or North Texas Blvd to access Stadium 37 Stallion St Oak Creek Ln Cul-de-sac 07/24/24 07/29/24 Driveway Repair Public Works Inspections Delilah Garcia Lane Closure 38 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 08/23/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 39 Welch St S Eagle or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on July 26,2024 11:41:15 AM CDT 3 Street Closure Report: Completed Closures smartsheet 1 Street/Intersection Fror. 0 Description Department Department Contact 1 2nd St Elm St N Locust St N 07/08/24 07/19/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 2 Amistad Ln John Payne Rd Eagle Mountain Dr 06/17/24 07/12/24 ADA and Sidewalk Repair Streets Roy San Miguel Full Closure 3 Ave A Eagle Dr Collins St W 06/06/24 06/27/24 Gas relocations for NB6 Public Works Inspections Alexander Cervantes Lane Closure 4 Azalea St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 51 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 7 Brinker Rd Loop 288 Quail Creek or 05/28/24 07/05/24 Basefailure Repairs and Crack Streets Roy San Miguel Lane Closure Seal 8 Broken Arrow Rd Dunes St Old Orchard Ln 05/18/24 06/30/24 Pavement Reconstruction Engineering Taylor Holt Full Closure 9 Camellia St Parvin St Laurel St 05/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Churchill Dr Churchill Cir Windsor Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement 11 College Park or Peach St Dead End 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 12 Collins St Johnson St Dead End West 08/22/23 07/26/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Crawford St Mulberry St Sycamore St 10/09/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 14 Fowler Dr College Park Dr Peach St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 15 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 16 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 17 Maple St Elm St Carroll Blvd 09/15/23 07/26/24 Utility installations and Scott Fettig Full Closure pavement replacement. 18 Maple St Locust St Elm St 04/19/24 07/26/24 Pavement replacement. Engineering Scott Fettig Full Closure 19 Maple St Carroll Blvd Elm St 07/05/23 07/26/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 20 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 22 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 23 Myrtle St Eagle Dr Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 24 Old Orchard Ln Windsor Dr Dead End 03/13/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 25 Peach St Bell St Locust St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 26 Pembrooke PI(2129) Chasewood Ln Longridge Dr 05/27/24 07/05/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure 27 Spencer Rd Loop 288 Mayhill Rd 05/06/24 07/18/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure 28 Sycamore St Exposition St Crawford St 03/13/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 29 Sycamore St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure 30 Texas St,south,west,and north Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure 31 Texas St,south,west,and north 32 Wellington or North of Heather Ln Churchill Dr 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement Exported on July 26,2024 11:41:25 AM CDT