Loading...
2024/08/09 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR August 12th- August 18th Street/Intersection Description Department Contact Closure Type 1 Brandywine St Copper Ridge St Briarwood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure 2 Potomac Pkwy Shenandoah Trail Slone Mountain Dr OB/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure Exported on August 9,2024 12:16:07 PM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet sure End Description Department Department Contact Date 1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II Audra Ln Stockton St Mockingbird Ln 07/29/24 08/30/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure 2 to existing City of Denton drainage. 3 Ave D Chestnut St Mulberry St 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Bernard St Acme St Roselawn or 05/30/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Bonnie Brae St S Airport Road/FM 1515 Walt Parker or 07/29/24 08/16/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line. 6 Central Ave Maple St Highland St 06/03/24 08/23/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Crescent St Ector St Hillcrest St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Edwards Rd @ Colorado Blvd @ Edwards/DCTA Rail Rd 06/07/24 08/30/24 Various Lanes will be closed to Other Tracy L.Beck,PE,PIMP Lane Closure facilitate the construction of Mayhill Road Bridge and the reconstruction of Mayhill/Colorado Intersection and the Edwards/Mayhill Intersection.Access will be maintained. No detours will be used. Signs and Message Boards will provide details Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 08/30/24 This closure is required to Engineering Other Tracy L.Beck,PE,PIMP Full Closure 10 construct the connection of"old to new'Mayhill Road north of the Mobilie Home Park 11 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure 12 Hillcrest St Panhandle St Crescent St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 14 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/16/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure 15 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 Mayhill Rd @ Colorado Blvd Intersection 01/31/24 08/30/24 This closure will encompass the Engineering John Rhoda Lane Closure 16 reconstruction of the Mayhill Rd /Colorado Blvd Intersection. 17 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 08/23/24 Installation of new driveway Private Development Public Zabdiel Mota Lane Closure approaches Works Inspections 18 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 19 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure 20 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Panhandle St Heritage Tri Panhandle or 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure 22 FfPanhandle St Heritage Trl Stanley St 07/15/24 08/23/24 Drive Approach Public Works Inspections Collin Cole Lane Closure Stadium or Bonnie Brae St Stadium or 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line crossing Stadium Drive,NO ACCESS TO LINT STADIUM 23 FROM BONNIE BRAE. Use parking lot entrance off 35E Service Rd or North Texas Blvd to access Stadium 24 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 08/23/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 25 Welch St S Eagle or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on August 9,2024 12:16:28 PM CDT Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection Fror Description Department Department Contact 1 2nd St Elm St N Locust St N 07/08/24 17119/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 2 Amistad Ln John Payne Rd Eagle Mountain or 06/17/24 07/12/24 ADA and Sidewalk Repair Streets Roy San Miguel Full Closure 3 Bell Ave Sycamore St Prairie St 08/21/23 07/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 4 Bonnie Brae 2850 N.Bonnie Brae 3392 N.Bonnie Brae 07/29/24 08/02/24 Reeves Elementary School Private Development Gavin Petner Lane Closure Drive approach pour Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/31/24 Floyd Smith going to install 5ft Other Muhamad Madhat Lane Closure 5 intersection wide temp sidewalk at southeast corner of the intersection 6 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 7 Broken Bow St Windsor or Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 8 Churchill Dr Churchill Cir Windsor or 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement 9 College Park or Peach St Dead End 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 10 Collins St Johnson St Dead End West 08/22/23 07/26/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Dominion St Realm St Province St 07/29/24 08/01/24 Concrete Panel Repair Roy San Miguel Lane Closure 12 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 13 Dunes St @ Broken Bow St Intersection 07/26/24 07/29/24 Concrete Intersection Pour for Engineering Sheldon Gatewood Full Closure Neighborhood 4 Project 14 Fowler or College Park or Peach St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 15 Headlee Bolivar Denison 07/24/24 07/29/24 Street repairs Public Works Inspections Delilah Garcia Full Closure Streets 16 Heritage Trl Linden or Panhandle St 07/15/24 08/09/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure 17 Highland St Locust St Wainwright St 01/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 18 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 19 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 20 Maple St Elm St Carroll Blvd 09/15/23 07/26/24 Utility installations and Scott Fettig Full Closure pavement replacement. 21 Maple St Locust St Elm St 04/19/24 07/26/24 Pavement replacement. Engineering Scott Fettig Full Closure 22 Maple St Carroll Blvd Elm St 07/05/23 07/26/24 Utility installations and Engineering Scoff Fettig Full Closure pavement replacement. 23 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure 24 Masch Branch Rd University or(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure adding turn lane. Works Inspections 25 Mesa or Bandera St University Dr/US 380 07/29/24 08/02/24 Atmos gas relocation street Atmos Gavin Petner Lane Closure repairs 26 Montecito or Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 27 Mulberry St Locust St Elm St 02/19/24 07/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 28 Old Orchard Ln Windsor or Dead End 03/13/24 07/16/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 29 Peach St Bell St Locust St 10/02/23 07/12/24 Street reconstruct Streets Roy San Miguel Full Closure 30 Pierce St Maple St Highland St 07/05/23 07/31/24 Utility installations and Scott Fettig Full Closure pavement replacement. 31 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scoff Fettig Rolling Closure pavement replacement. 32 Spencer Rd Loop 288 Mayhill Rd 05/06/24 07/18/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure 33 Stallion St Oak Creek Ln Cul-de-sac 07/24/24 07/29/24 Driveway Repair Public Works Inspections Delilah Garcia Lane Closure Exported on August 9,2024 12:16:59 PM CDT Page 1 of 2 Street/Intersection From TO Closure Start Description Department Department Contact Closure Type Date Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure 34 Texas St,south,west,and north Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure 35 Texas St,south,west,and north 36 Wellington Or North of Heather Ln Churchill Or 12/11/23 07/16/24 Utility installations and Engineering Taylor Holt pavement replacement Exported on August 9,2024 12:16:59 PM CDT Page 2 of 2