2024/08/23 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Aug 26th - Sep 1 st
Street/Intersection Description Department Department Contact Closure Type
1 Countess Ln Thoroughbred Trl Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
Exported on August 23,2024 11:48:57 AM CDT
2 Street Closure Report: Current Closures smartsheet
sure End Description Department Department Conta����
Date
Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Audra Ln Stockton St Mockingbird Ln 07/29/24 08/30/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure
2 to existing City of Denton
drainage.
3 Bernard St Acme St Roselawn Dr 05/30/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Bonnie Brae St S N 1-35 E Service rd Hickory St 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure
Water
5 Brandywine St Copper Ridge St Briarwood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure
6 Central Ave Maple St Highland St 06/03/24 09/06/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
7 Charlotte St Ave H Bonnie Brae St S 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Full Closure
Water
6 Crescent St Ector St Hillcrest St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Edwards Rd @ Colorado Blvd @ Edwards/DCTA Rail Rd 06/07/24 09/06/24 Permanent Road Closure is Other Tracy L.Beck,PE,PMP Lane Closure
cumin soon(anticipate within 2
weeks.Will occur when new
May
can be opened
and 2 new Mayhill Signals
(@Colorado and @Edwards)
are working. Signs and
Message Boards will provide
details
Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 09/06/24 Opening of New Road Engineering Other Tracy L.Beck,PE,PMP Full Closure
Connection(New Edwards to
Mayhill) is coming soon
(anticipate within 2 weeks). Will
1 G occur when 2 new Mayhill
Signals(@Colorado and
@Edwards)are working. Signs
and Message Boards will
provide details
11 Elm at Hickory st McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
12 Hickory Creek Rd Riverpass or FM 1830 03/13/23 1 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
13 Hill Alley St Jackson St Martin St 08/26/24 08/30/24 Asphalt milling&resurfacing Engineering Seth Garcia Rolling Closure
14 Hillcrest St Panhandle St Crescent St 12/27/23 08/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Industrial St Mill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure
16 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
17 Locust St Hickory St McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
18 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 09/06/24 This closure will encompass the Engineering Tracy Beck Lane Closure
19 reconstruction of the Mayhill Rd
/Colorado Blvd Intersection.
20 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mots Lane Closure
approaches Works Inspections
21 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
22 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 08/30/24 Street Reconstruction Streets Roy San Miguel Full Closure
23 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 08/29/24 DIME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure
Trench Repair
24 Ocean or Atlantic or Nautical Lane 08/26/24 09/10/24 Sanitary Sewer install Private Development Gavin Petner Full Closure
25 Panhandle St Heritage Tri Stanley St 07/15/24 09/06/24 Drive Approach Public Works Inspections Collin Cole Full Closure
26 Potomac Pkwy Shenandoah Trail Stone Mountain Dr 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure
27 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure
28 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 09/13/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
29 Welch St S Eagle or Highland St 06/03/24 08/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on August 23,2024 11:49:16 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection • • . •- . •-1 • Description Department Depa - • • - •-
1 Ave D Chestnut St Mulberry St 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2 Bell Ave Sycamore St Prairie St 08/21/23 07/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
3 Bonnie Brae 2850 N.Bonnie Brae 3392 N.Bonnie Brae 07/29/24 08/02/24 Reeves Elementary School Private Development Gavin Petner Lane Closure
Drive approach pour
Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/31/24 Floyd Smith going to install 5ft Other Muhamad Madinat Lane Closure
4 intersection wide temp sidewalk at
southeast corner of the
intersection
5 Bonnie Brae St S Airport Road/FM 1515 Walt Parker Dr 07/29/24 08/16/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line.
6 Broken Arrow Rd Dunes St Old Orchard Ln 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
7 Broken Bow St Windsor Dr Dunes St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
8 Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Collins St Johnson St Dead End West 08/22/23 07/26/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Dominion St Realm St Province St 07/29/24 08/01/24 Concrete Panel Repair Roy San Miguel Lane Closure
11 Dunes St Broken Arrow Rd Broken Bow St 04/22/24 07/29/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
12 Dunes St @ Broken Bow St Intersection 07/26/24 07/29/24 Concrete Intersection Pour for Engineering Sheldon Gatewood Full Closure
Neighborhood 4 Project
13 Headlee Bolivar Denison 07/24/24 07/29/24 Street repairs Public Works Inspections Delilah Garcia Full Closure
Streets
14 Heritage Trl Linden Dr Panhandle St 07/15/24 08/09/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure
15 Highland St Locust St Wainwright St 01/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/16/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure
17 Maple St Elm St Carroll Blvd 09/15/23 07/26/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
18 Maple St Locust St Elm St 04/19/24 07/26/24 Pavement replacement. Engineering Scott Fettig Full Closure
19 Maple St Carroll Blvd Elm St 07/05/23 07/26/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure
21 Masch Branch Rd University Dr(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure
adding turn lane. Works Inspections
22 Mesa or Bandera St University Dr/US 380 07/29/24 08/02/24 Atmos gas relocation street Atmos Gavin Petner Lane Closure
repairs
23 Montecito Dr Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
24 Mulberry St Locust St Elm St 02/19/24 07/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
25 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
26 Panhandle St Heritage Trl Panhandle Dr 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure
27 Pierce St Maple St Highland St 07/05/23 07/31/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
28 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure
pavement replacement.
Stadium or Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Stadium Drive,NO
ACCESS TO UNT STADIUM
29 FROM BONNIE BRAE. Use
parking lot entrance off 35E
Service Rd or North Texas Blvd
to access Stadium
30 Stallion St Oak Creek Ln Cul-de-sac 07/24/24 07/29/24 Driveway Repair Public Works Inspections Delilah Garcia Lane Closure
Exported on August 23,2024 11:49:47 AM CDT
Closure Start
Street/Intersection From TO Date-�� Description Department Department Contact Closure Type
Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure
31 Texas St,south,west,and
north
Texas St Bell Ave N Vine St 06/14/24 07/26/24 Atmos is boring with rig in Atmos Omar Rojas Full Closure
32 Texas St,south,west,and
north
Exported on August 23,2024 11:49:47 AM CDT