Loading...
2024/08/30 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sep 2nd - 8th Exported on August 30,2024 11:20:18 AM CDT 2 Street Closure Report: Current Closures smartsheet -'osure End Description Department Department Contact Date 1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II Audra Ln Stockton St Mockingbird Ln 07/29/24 10/04/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure 2 to existing City of Denton drainage. 3 Ave.C Eagle Dr. Highland St. 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure 4 Bernard St Acme St Roselawn Dr 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Bernard St. Lindsey St. Fannin St. 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 6 Brandywine St Copper Ridge St Briarwood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure 7 Central Ave Maple St Highland St 06/03/24 09/06/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 8 Collins St. Ave.A Bernard St. 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Countess Ln Thoroughbred Trl Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 10 Crescent St Ector St Hillcrest St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PIMP Lane Closure Mayhill Road from Edwards/DCTA Railroad Crossing to Colorado Blvd will 11 be permanently closed Tuesday 9/3/24.Access to/from Edwards Road will take the new Mayhill/Edwards Intersection north of Colorado Blvd. Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PIMP Lane Closure Edwards(formerly Mayhill)will open to traffic from Leafy (Pecan Creek Manufactured Home Community)north to the 12 new Mayhill Road.Traffic Signal will be fully operational Thursday 9/5/24 pending no issues. Various traffic lanes in each direction will remain closed for final construction activities. 13 Elm st Hickory st McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 14 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 15 Hillcrest St Panhandle St Crescent St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 16 Locust St Hickory St McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure Mayhill Rd @ Colorado Blvd Intersection 01/31/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy Beck Lane Closure Mayhill/Colorado eastern leg will be closed Tuesday 9/3/24 to permanently close the at-grade Mayhill DCTA Railroad 17 Crossing.Traffic Signal will be fully operational Thursday 9/5/24 pending no issues. Various traffic lanes will remain closed for final construction activities. 18 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mots Lane Closure approaches Works Inspections 19 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure 20 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/06/24 DIME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure Trench Repair 21 Ocean Dr Atlantic Dr Nautical Lane 08/26/24 09/10/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 22 Panhandle St Heritage Tri Stanley St 07/15/24 09/06/24 Drive Approach Public Works Inspections Collin Cole Full Closure 23 Potomac Pkwy Shenandoah Trail Stone Mountain or 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure 24 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 09/13/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 25 Welch St S Eagle Or Highland St 06/03/24 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on August 30,2024 11:20:38 AM CDT Streett Intersection From To Closure Start Closure End Description Department Date Date Department Contact Closure Type 26 Welch St. Highland Hickory 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Exported on August 30,2024 11:20:38 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection • • . •- . •-1 • Description Department Depa - • • - •- 1 Ave D Chestnut St Mulberry St 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Bell Ave Sycamore St Prairie St 08/21/23 07/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 3 Bonnie Brae 2850 N.Bonnie Brae 3392 N.Bonnie Brae 07/29/24 08/02/24 Reeves Elementary School Private Development Gavin Petner Lane Closure Drive approach pour Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/31/24 Floyd Smith going to install 5ft Other Muhamad Madinat Lane Closure 4 intersection wide temp sidewalk at southeast corner of the intersection 5 Bonnie Brae St S Airport Road/FM 1515 Walt Parker Dr 07/29/24 08/16/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line. 6 Bonnie Brae St S N 1-35 E Service rd Hickory St 08/21/24 08/30/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure Water 7 Charlotte St Ave H Bonnie Brae St S 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Full Closure Water 8 Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Dominion St Realm St Province St 07/29/24 08/01/24 Concrete Panel Repair Roy San Miguel Lane Closure 10 Heritage Tit Linden Dr Panhandle St 07/15/24 08/09/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure 11 Highland St Locust St Wainwright St 01/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 12 Hill Alley St Jackson St Martin St 08/26/24 08/30/24 Asphalt milling&resurfacing Engineering Seth Garcia Rolling Closure 13 Industrial St Mill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure 14 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 15 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/16/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure 16 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 17 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure 18 Masch Branch Rd University Dr(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure adding turn lane. Works Inspections 19 Mesa or Bandera St University Dr/US 380 07/29/24 08/02/24 Atmos gas relocation street Atmos Gavin Petner Lane Closure repairs 20 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 21 Montecito Dr Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 22 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 23 Panhandle St Heritage Trl Panhandle Dr 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure 24 Pierce St Maple St Highland St 07/05/23 07/31/24 Utility installations and Scott Fettig Full Closure pavement replacement. 25 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 utility installations and Scott Fettig Rolling Closure pavement replacement. 261 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure Stadium Dr Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line crossing Stadium Drive,NO ACCESS TO LINT STADIUM 27 FROM BONNIE BRAE. Use parking lot entrance off 35E Service Rd or North Texas Blvd to access Stadium Exported on August 30,2024 11:20:51 AM CDT