2024/08/30 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Sep 2nd - 8th
Exported on August 30,2024 11:20:18 AM CDT
2 Street Closure Report: Current Closures smartsheet
-'osure End Description Department Department Contact
Date
1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Audra Ln Stockton St Mockingbird Ln 07/29/24 10/04/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure
2 to existing City of Denton
drainage.
3 Ave.C Eagle Dr. Highland St. 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure
4 Bernard St Acme St Roselawn Dr 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Bernard St. Lindsey St. Fannin St. 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Brandywine St Copper Ridge St Briarwood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure
7 Central Ave Maple St Highland St 06/03/24 09/06/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Collins St. Ave.A Bernard St. 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Countess Ln Thoroughbred Trl Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
10 Crescent St Ector St Hillcrest St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PIMP Lane Closure
Mayhill Road from
Edwards/DCTA Railroad
Crossing to Colorado Blvd will
11 be permanently closed Tuesday
9/3/24.Access to/from Edwards
Road will take the new
Mayhill/Edwards Intersection
north of Colorado Blvd.
Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PIMP Lane Closure
Edwards(formerly Mayhill)will
open to traffic from Leafy
(Pecan Creek Manufactured
Home Community)north to the
12 new Mayhill Road.Traffic Signal
will be fully operational
Thursday 9/5/24 pending no
issues. Various traffic lanes in
each direction will remain
closed for final construction
activities.
13 Elm st Hickory st McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
14 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
15 Hillcrest St Panhandle St Crescent St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Locust St Hickory St McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy Beck Lane Closure
Mayhill/Colorado eastern leg
will be closed Tuesday 9/3/24 to
permanently close the at-grade
Mayhill DCTA Railroad
17 Crossing.Traffic Signal will be
fully operational Thursday
9/5/24 pending no issues.
Various traffic lanes will remain
closed for final construction
activities.
18 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mots Lane Closure
approaches Works Inspections
19 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure
20 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/06/24 DIME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure
Trench Repair
21 Ocean Dr Atlantic Dr Nautical Lane 08/26/24 09/10/24 Sanitary Sewer install Private Development Gavin Petner Full Closure
22 Panhandle St Heritage Tri Stanley St 07/15/24 09/06/24 Drive Approach Public Works Inspections Collin Cole Full Closure
23 Potomac Pkwy Shenandoah Trail Stone Mountain or 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure
24 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 09/13/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
25 Welch St S Eagle Or Highland St 06/03/24 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on August 30,2024 11:20:38 AM CDT
Streett Intersection From To Closure Start Closure End Description Department
Date Date Department Contact Closure Type
26 Welch St. Highland Hickory 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
Exported on August 30,2024 11:20:38 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection • • . •- . •-1 • Description Department Depa - • • - •-
1 Ave D Chestnut St Mulberry St 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2 Bell Ave Sycamore St Prairie St 08/21/23 07/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
3 Bonnie Brae 2850 N.Bonnie Brae 3392 N.Bonnie Brae 07/29/24 08/02/24 Reeves Elementary School Private Development Gavin Petner Lane Closure
Drive approach pour
Bonnie Brae St&Riney Rd Bonnie Brae St @ Riney Rd Riney Rd @ Bonnie Brae St 06/10/24 07/31/24 Floyd Smith going to install 5ft Other Muhamad Madinat Lane Closure
4 intersection wide temp sidewalk at
southeast corner of the
intersection
5 Bonnie Brae St S Airport Road/FM 1515 Walt Parker Dr 07/29/24 08/16/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line.
6 Bonnie Brae St S N 1-35 E Service rd Hickory St 08/21/24 08/30/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure
Water
7 Charlotte St Ave H Bonnie Brae St S 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Full Closure
Water
8 Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Dominion St Realm St Province St 07/29/24 08/01/24 Concrete Panel Repair Roy San Miguel Lane Closure
10 Heritage Tit Linden Dr Panhandle St 07/15/24 08/09/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure
11 Highland St Locust St Wainwright St 01/30/23 07/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
12 Hill Alley St Jackson St Martin St 08/26/24 08/30/24 Asphalt milling&resurfacing Engineering Seth Garcia Rolling Closure
13 Industrial St Mill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure
14 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
15 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/16/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure
16 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
17 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure
18 Masch Branch Rd University Dr(US 380) Hampton Rd 02/26/24 08/02/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure
adding turn lane. Works Inspections
19 Mesa or Bandera St University Dr/US 380 07/29/24 08/02/24 Atmos gas relocation street Atmos Gavin Petner Lane Closure
repairs
20 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
21 Montecito Dr Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
22 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
23 Panhandle St Heritage Trl Panhandle Dr 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure
24 Pierce St Maple St Highland St 07/05/23 07/31/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
25 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 utility installations and Scott Fettig Rolling Closure
pavement replacement.
261 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure
Stadium Dr Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Stadium Drive,NO
ACCESS TO LINT STADIUM
27 FROM BONNIE BRAE. Use
parking lot entrance off 35E
Service Rd or North Texas Blvd
to access Stadium
Exported on August 30,2024 11:20:51 AM CDT