2024/09/06 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Sep 9th - 15th
Exported on September 6,2024 11:34:31 AM CDT
2 Street Closure Report: Current Closures smartsheet
-'osure End Description Department Department Contact
Date
1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Audra Ln Stockton St Mockingbird Ln 07/29/24 10/04/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure
2 to existing City of Denton
drainage.
3 Ave.C Eagle Dr. Highland St. 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure
4 Bernard St Acme St Roselawn or 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Brandywine St Copper Ridge St Briarwood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure
7 Central Ave Maple St Highland St 06/03/24 09/20/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Countess Ln Thoroughbred Trl Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
10 Crescent St Ector St Hillcrest St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PIMP Lane Closure
Mayhill Road from
Edwards/DCTA Railroad
Crossing to Colorado Blvd will
11 be permanently closed Tuesday
9/3/24.Access to/from Edwards
Road will take the new
Mayhill/Edwards Intersection
north of Colorado Blvd.
Edwards Rd(FKA Mayhill Rd) Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PIMP Lane Closure
Edwards(formerly Mayhill)will
open to traffic from Leafy
(Pecan Creek Manufactured
Home Community)north to the
12 new Mayhill Road.Traffic Signal
will be fully operational
Thursday 9/5/24 pending no
issues. Various traffic lanes in
each direction will remain
closed for final construction
activities.
13 Elm St Hickory St McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
14 Farris Rd Kingsrow Oak Bend Cir 08/22/24 09/09/24 Street repairs Streets Jesse Rodriguez Full Closure
15 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
16 Hillcrest St Panhandle St Crescent St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
17 Locust St Hickory St McKinney St 08/26/24 09/30/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy Beck Lane Closure
Mayhill/Colorado eastern leg
will be closed Tuesday 9/3/24 to
permanently close the at-grade
Mayhill DCTA Railroad
18 Crossing.Traffic Signal will be
fully operational Thursday
9/5/24 pending no issues.
Various traffic lanes will remain
closed for final construction
activities.
19 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure
20 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/20/24 DIME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure
Trench Repair
21 Panhandle St Heritage Tri Stanley St 07/15/24 09/20/24 Drive Approach Public Works Inspections Collin Cole Full Closure
22 Potomac Pkwy Shenandoah Trail Stone Mountain Dr 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure
23 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 09/13/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
24 Welch St S Eagle or Highland St 06/03/24 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
25 Welch St. Highland Hickory 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
Exported on September 6,2024 11:34:51 AM CDT
3 Street Closure Report: Completed Closures smartsheet
__ Intersection • • . •- . •-1 • Description Department Depa - • • - •-
1 Ave D Chestnut St Mulberry St 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2 Bonnie Brae St S Airport Road/FM 1515 Walt Parker Dr 07/29/24 08/16/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line.
3 Bonnie Brae St S N 1-35 E Service rd Hickory St 08/21/24 08/30/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure
Water
4 Charlotte St Ave H Bonnie Brae St S 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Full Closure
Water
5 Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 a Trl Linden Dr Panhandle St 07/15/24 08/09/24 Working on drive approach Public Works Inspections Collin Cole Lane Closure
7FHentge
HillAlleyStJackson St Martin St 08/26/24 08/30/24 Asphalt milling&resurfacing Engineering Seth Garcia Rolling Closure
8IndustrialStMill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure
9Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
10 Kilkenny Ct County Club Rd Cul V Sac 07/15/24 08/16/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure
11 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
12 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure
approaches Works Inspections
13 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
14 Montecito Dr Hickory Creek Rd Clear River Ln 06/03/24 08/09/24 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
15 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Ocean Dr Atlantic Dr Nautical Lane 08/26/24 09/05/24 Sanitary Sewer install Private Development Gavin Feiner Full Closure
17 Panhandle St Heritage Trl Panhandle Dr 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure
18 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure
Stadium or Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Stadium Drive,NO
ACCESS TO UNIT STADIUM
19 FROM BONNIE BRAE. Use
parking lot entrance off 35E
Service Rd or North Texas Blvd
to access Stadium
Exported on September 6,2024 11:35:13 AM CDT