Loading...
2024/09/13 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sep 16th - 22nd Street/Intersection EM111IM!Description Department 1 Loop 288 University-US 380 McKinney Street 09/23/24 10/21/24 Sidewalk Installation Engineering Robin Davis Rolling Closure Exported on September 13,2024 2:46:38 PM CDT 2 Street Closure Report: Current Closures smartsheet -'osure End Description Department Department Contact Date 1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II Audra Ln Stockton St Mockingbird Ln 07/29/24 10/04/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure 2 to existing City of Denton drainage. 3 Ave.C Eagle Dr. Highland St. 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure 4 Bernard St Acme St Roselawn or 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 6 Brandywine St Copper Ridge St Briarwood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure 7 Central Ave Maple St Highland St 06/03/24 09/20/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 8 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Countess Ln Thoroughbred Trl Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 10 Crescent St Ector St Hillcrest St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 12 Hillcrest St Panhandle St Crescent St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Mayhill Rd Colorado Blvd Edwards Rd 01/31/24 09/27/24 Various traffic lanes will remain Engineering Tracy Beck Lane Closure 13 closed for final construction activities. 14 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure 15 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/20/24 DME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure Trench Repair 16 Panhandle St Heritage Tri Stanley St 07/15/24 09/20/24 Drive Approach Public Works Inspections Collin Cole Full Closure 17 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 09/20/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 18 Welch St S Eagle or Highland St 06/03/24 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 19 Welch St. Highland Hickory 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Exported on September 13,2024 2:46:52 PM CDT 3 Street Closure Report: Completed Closures smartsheet __ Intersection • • . •- . •-1 • Description Department Depa - • • - •- 1 Ave D Chestnut St Mulberry St 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Bonnie Brae St S Airport Road/FM 1515 Walt Parker Dr 07/29/24 08/16/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line. 3 Bonnie Brae St S N 1-35 E Service rd Hickory St 08/21/24 08/30/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure Water 4 Charlotte St Ave H Bonnie Brae St S 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Full Closure Water 5 Chestnut St Ave C Ave D 06/03/24 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PMP Lane Closure Mayhill Road from Edwards/DCTA Railroad Crossing to Colorado Blvd will 6 be permanently closed Tuesday 9/3/24.Access to/from Edwards Road will take the new Mayhill/Edwards Intersection north of Colorado Blvd. Edwards Rd(FKA Mayhill Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PMP Lane Closure Rd) Edwards(formerly Mayhill)will open to traffic from Leafy (Pecan Creek Manufactured Home Community)north to the 7 new Mayhill Road.Traffic Signal will be fully operational Thursday 9/5/24 pending no issues. Various traffic lanes in each direction will remain closed for final construction activities. 8 Elm St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 9 Farris Rd Kingsrow Oak Bend Cir 08/22/24 09/09/24 Street repairs Streets Jesse Rodriguez Full Closure 10 Hill Alley St Jackson St Martin St 08/26/24 08/30/24 Asphalt milling&resurfacing Engineering Seth Garcia Rolling Closure 11 Industrial St Mill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure 12 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 13 Kilkenny Ct County Club Rd Cut V Sac 07/15/24 08/16/24 Curb and Valley Gutter Repair Streets Roy San Miguel Lane Closure 14 Locust St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 15 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 16 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure approaches Works Inspections 17 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 18 Mulberry St Bell Ave Industrial St 08/21/23 08/16/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 19 Ocean Dr Atlantic Dr Nautical Lane 08/26/24 09/05/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 20 Panhandle St Heritage Tit Panhandle Dr 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure 21 Potomac Pkwy Shenandoah Trail Stone Mountain Dr 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure 22 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure Stadium Dr Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line crossing Stadium Drive,NO ACCESS TO UNIT STADIUM 23 FROM BONNIE BRAE. Use parking lot entrance off 35E Service Rd or North Texas Blvd to access Stadium Exported on September 13,2024 2:47:05 PM CDT