Loading...
2024/09/20 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sep 23rd - 29th Street/Intersection From Description Department Department Contact Closure Type 1 Bonnie Brae St Willowwood St Railroad tracks 09/30/24 10/04/24 Sanitary Sewer service line installations Engineering Robin Davis Full Closure crossing under Bonnie Brae 2 Ocean Dr Atlantic Dr Nautical Ln 10/02/24 10/23/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 3 South Bonnie Brae Street Willowwood Walt Parker Drive 10/07/24 10/11/24 Sanitary Sewer service line installations Engineering Robin Davis Full Closure crossing under Bonnie Brae 4 Willowood St Leslie St Westwood Dr 09/30/24 10/30/24 Sanitary Sewer,water taps and storm sewer Private Development Gavin Petner Lane Closure Exported on September 20,2024 11:57:10 AM CDT 2 Street Closure Report: Current Closures smartsheet sure End Description Department Department Contact Date Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II Audra Ln Stockton St Mockingbird Ln 07/29/24 10/04/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure 2 to existing City of Denton drainage. 3 Ave C Eagle or Highland St 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure 4 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 5 Central Ave Maple St Highland St 06/03/24 10/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 7 Countess Ln Thoroughbred Tit Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 8 Crescent St Ector St Hillcrest St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 10 Hickory St E Bell Ave Locust St 09/25/24 09/25/24 5:30AM-8:30AM Other Colt Morris Full Closure 11 Hillcrest St Panhandle St Crescent St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 12 Loop 288 University-US 380 McKinney St 09/23/24 10/21/24 Sidewalk Installation Engineering Robin Davis Rolling Closure Mayhill Rd Colorado Blvd Edwards Rd 01/31/24 09/27/24 Various traffic lanes will remain Engineering Tracy Beck Lane Closure 13 closed for final construction activities. 14 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure 15 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 09/27/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 16 Welch St Highland St Hickory St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 17 Welch St S Eagle or Highland St 06/03/24 09/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on September 20,2024 11:57:37 AM CDT 3 Street Closure Report: Completed Closures smartsheet or- 1 Bernard St Acme St Roselawn Dr 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Bonnie Brae St S N 1-35 E Service rd Hickory St 0S/21/24 08/30/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure Water Brandywine St copper Ridge St Bdanvood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure Charlotte St Ave H Bonnie Brae St S 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Full Closure Water Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PMP Lane Closure Mayhill Road from Edwards/DCTA Railroad Crossing to Colorado Blvd will be permanently closed Tuesday 9/3/24.Access to/from Edwards Road will take the new Mayhill/Edwards Intersection north of Colorado Blvd. Edwards Rd(FKA Mayhill Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PMP Lane Closure Rd) Edwards(formerly Mayhill)will open to traffic from Leafy (Pecan Creek Manufactured Home Community)north to the 6 new Mayhill Road.Traffic Signal will be fully operational Thursday 9/5/24 pending no issues. Various traffic lanes in each direction will remain closed for final construction activities. 7 Elm St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 8 Farris Rd Kingsrow Oak Bend Cir 08/22/24 09/09/24 Street repairs Streets Jesse Rodriguez Full Closure 9 Hill Alley St Jackson St Martin St 08/26/24 08/30/24 Asphalt milling R resurfacing Engineering Seth Garcia Rolling Closure 10 Industrial St Mill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure 11 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 12 Locust St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 13 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 14 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mota Lane Closure approaches Works Inspections 15 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 16 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/20/24 DME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure Trench Repair 17 Ocean or Atlantic Dr Nautical Lane 08/26/24 09/05/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 18 Panhandle St Heritage Tr1 Panhandle or 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure 19 Panhandle St Heritage Tr1 Stanley St 07/15/24 09/20/24 Drive Approach Public Works Inspections Collin Cole Full Closure 20 Potomac Pkwy Shenandoah Trail Stone Mountain or 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure 21 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure Stadium Dr Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line crossing Stadium Drive,NO ACCESS TO LINT STADIUM 22 FROM BONNIE BRAE. Use parking lot entrance off 35E Service Rd or North Texas Blvd to access Stadium Exported on September 20,2024 11:57:53 AM CDT