2024/09/20 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Sep 23rd - 29th
Street/Intersection From Description Department Department Contact Closure Type
1 Bonnie Brae St Willowwood St Railroad tracks 09/30/24 10/04/24 Sanitary Sewer service line installations Engineering Robin Davis Full Closure
crossing under Bonnie Brae
2 Ocean Dr Atlantic Dr Nautical Ln 10/02/24 10/23/24 Sanitary Sewer install Private Development Gavin Petner Full Closure
3 South Bonnie Brae Street Willowwood Walt Parker Drive 10/07/24 10/11/24 Sanitary Sewer service line installations Engineering Robin Davis Full Closure
crossing under Bonnie Brae
4 Willowood St Leslie St Westwood Dr 09/30/24 10/30/24 Sanitary Sewer,water taps and storm sewer Private Development Gavin Petner Lane Closure
Exported on September 20,2024 11:57:10 AM CDT
2 Street Closure Report: Current Closures smartsheet
sure End Description Department Department Contact
Date
Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Audra Ln Stockton St Mockingbird Ln 07/29/24 10/04/24 Connection new storm drainage Private Development Zabdiel Mots Lane Closure
2 to existing City of Denton
drainage.
3 Ave C Eagle or Highland St 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure
4 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
5 Central Ave Maple St Highland St 06/03/24 10/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
7 Countess Ln Thoroughbred Tit Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
8 Crescent St Ector St Hillcrest St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
10 Hickory St E Bell Ave Locust St 09/25/24 09/25/24 5:30AM-8:30AM Other Colt Morris Full Closure
11 Hillcrest St Panhandle St Crescent St 12/27/23 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
12 Loop 288 University-US 380 McKinney St 09/23/24 10/21/24 Sidewalk Installation Engineering Robin Davis Rolling Closure
Mayhill Rd Colorado Blvd Edwards Rd 01/31/24 09/27/24 Various traffic lanes will remain Engineering Tracy Beck Lane Closure
13 closed for final construction
activities.
14 Montecito or Hickory Creek Rd Palo Verde or 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure
15 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 09/27/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
16 Welch St Highland St Hickory St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
17 Welch St S Eagle or Highland St 06/03/24 09/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on September 20,2024 11:57:37 AM CDT
3 Street Closure Report: Completed Closures smartsheet
or-
1 Bernard St Acme St Roselawn Dr 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2 Bonnie Brae St S N 1-35 E Service rd Hickory St 0S/21/24 08/30/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure
Water
Brandywine St copper Ridge St Bdanvood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure
Charlotte St Ave H Bonnie Brae St S 08/21/24 08/27/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Full Closure
Water
Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PMP Lane Closure
Mayhill Road from
Edwards/DCTA Railroad
Crossing to Colorado Blvd will
be permanently closed Tuesday
9/3/24.Access to/from Edwards
Road will take the new
Mayhill/Edwards Intersection
north of Colorado Blvd.
Edwards Rd(FKA Mayhill Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PMP Lane Closure
Rd) Edwards(formerly Mayhill)will
open to traffic from Leafy
(Pecan Creek Manufactured
Home Community)north to the
6 new Mayhill Road.Traffic Signal
will be fully operational
Thursday 9/5/24 pending no
issues. Various traffic lanes in
each direction will remain
closed for final construction
activities.
7 Elm St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
8 Farris Rd Kingsrow Oak Bend Cir 08/22/24 09/09/24 Street repairs Streets Jesse Rodriguez Full Closure
9 Hill Alley St Jackson St Martin St 08/26/24 08/30/24 Asphalt milling R resurfacing Engineering Seth Garcia Rolling Closure
10 Industrial St Mill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure
11 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
12 Locust St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure
13 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
14 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mota Lane Closure
approaches Works Inspections
15 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure
Neighborhood 4
16 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/20/24 DME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure
Trench Repair
17 Ocean or Atlantic Dr Nautical Lane 08/26/24 09/05/24 Sanitary Sewer install Private Development Gavin Petner Full Closure
18 Panhandle St Heritage Tr1 Panhandle or 07/15/24 08/23/24 Connecting to existing MH Public Works Inspections Collin Cole Lane Closure
19 Panhandle St Heritage Tr1 Stanley St 07/15/24 09/20/24 Drive Approach Public Works Inspections Collin Cole Full Closure
20 Potomac Pkwy Shenandoah Trail Stone Mountain or 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure
21 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure
Stadium Dr Bonnie Brae St Stadium Dr 07/29/24 08/24/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line crossing Stadium Drive,NO
ACCESS TO LINT STADIUM
22 FROM BONNIE BRAE. Use
parking lot entrance off 35E
Service Rd or North Texas Blvd
to access Stadium
Exported on September 20,2024 11:57:53 AM CDT