Loading...
2024/09/27 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sep 30th - Oct 6th Street/Intersection From To —MMllIMl-Description Department Department Contact Closure Type 1 Bonnie Brae St S Willowwood St Walt Parker Dr 10/07/24 10/11/24 Sanitary Sewer service line installations Engineering Robin Davis Full Closure crossing under Bonnie Brae Exported on September 27,2024 11:07:17 AM CDT 2 Street Closure Report: Current Closures smartsheet oak� MEML---AEW—�mmiM Description Department Department Contact 1 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II Audra Ln Stockton St Mockingbird Ln 07/29/24 10/04/24 Connection new storm drainage Private Development Zabdiel Mote Lane Closure 3 to existing City of Denton drainage. 4 Ave C Eagle or Highland St 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure 5 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Bonnie Brae St Willowwood St Railroad tracks 09/30/24 10/04/24 Sanitary Sewer service line Engineering Robin Davis Full Closure 6 installations crossing under Bonnie Brae 7 Central Ave Maple St Highland St 06/03/24 10/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 8 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Crescent St Ector St Hillcrest St 12/27/23 10/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 11 Hillcrest St Panhandle St Crescent St 12/27/23 10/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 12 Houston PI Thomas St Bradley St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Loop 288 University-US 380 McKinney St 09/23/24 10/21/24 Sidewalk Installation Engineering Robin Davis Rolling Closure 14 Marietta St Oak St W Scripture St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Mayhill Rd Colorado Blvd Edwards Rd 01/31/24 10/15/24 Various traffic lanes will remain Engineering Tracy Beck Lane Closure 15 closed for final construction activities. 16 Montecito or Hickory Creek Rd Palo Verde Dr 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure 17 Ocean or Atlantic or Nautical Ln 10/02/24 10/23/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 18 Panhandle St Ector St Aileen St 09/27/24 10/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Ryan Rd W Lauren's PI Rd Leisure Ln 09/20/24 10/28/24 Work zone closure and Other Delilah Garcia Rolling Closure 19 flaggers,both lanes are open during 9AM-3PM(utility lines& poles) 20 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 10/04/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 21 Welch St Highland St Hickory St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 22 Welch St S Eagle or Highland St 06/03/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 23 Willowood St Leslie St Westwood Or 09/30/24 10/30/24 Sanitary Sewer,water taps and Private Development Gavin Petner Lane Closure storm sewer Exported on September 27,2024 11:07:30 AM CDT 3 Street Closure Report: Completed Closures smartsheet or- 1 Bernard St Acme St Roselawn Dr 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Bonnie Brae St S N 1-35 E Service rd Hickory St 08/21/24 08/30/24 Water Dept.replacing valve Public Works Inspections Alexander Cervantes Lane Closure Water 31 Brandywine St Copper Ridge St Bdanvood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure 41 Countess Ln Thoroughbred Tri Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PMP Lane Closure Mayhill Road from Edwards/DCTA Railroad Crossing to Colorado Blvd will be permanently closed Tuesday 9/3/24.Access to/from Edwards Road will take the new Mayhill/Edwards Intersection north of Colorado Blvd. Edwards Rd(FKA Mayhill Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PMP Lane Closure Rd) Edwards(formerly Mayhill)will open to traffic from Leafy (Pecan Creek Manufactured Home Community)north to the new Mayhill Road.Traffic Signal will be fully operational Thursday 9/5/24 pending no issues. Various traffic lanes in each direction will remain closed for final construction activities. 7 Elm St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 8 Farris Rd Kingsrow Oak Bend Cir 08/22/24 09/09/24 Street repairs Streets Jesse Rodriguez Full Closure 9 Hickory St E Bell Ave Locust St 09/25/24 09/25/24 5:30AM-8:30AM Other Colt Morris Full Closure 10 Hill Alley St Jackson St Martin St 08/26/24 08/30/24 Asphalt milling&resurfacing Engineering Seth Garcia Rolling Closure 11 Industrial St Mill St Dead end 08/26/24 08/30/24 Asphalt milling and resurface Engineering Seth Garcia Lane Closure 12 Jamestown Ln Mistywood Ln Locksley Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 13 Locust St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 14 Maid Marion PI Locksley Ln Jamestown Ln 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 15 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mota Lane Closure approaches Works Inspections 16 Mill Pond Rd Emerson Ln Old North Rd 07/29/24 08/30/24 Trench Repair for Engineering Sheldon Gatewood Rolling Closure Neighborhood 4 17 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/20/24 DIME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure Trench Repair 18 Ocean or Atlantic Dr Nautical Lane 08/26/24 09/05/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 19 Panhandle St Heritage Trl Stanley St 07/15/24 09/20/24 Drive Approach Public Works Inspections Collin Cole Full Closure 20 Potomac Pkwy Shenandoah Trail Stone Mountain or 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure 21 Robertson St Cook St Skinner St 08/26/24 08/30/24 Asphalt milling and resurfacing Engineering Seth Garcia Rolling Closure Exported on September 27,2024 11:07:52 AM CDT