Loading...
2024/10/04 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Oct 7th - 13th Street/Intersection I Fl. Description Department Department Contact Closure Type 1 Abby Way(5313) Glenngary Way Jeffrey Dr 10/14/24 11/08/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure 2 Stallion St(7809) Lakeview Blvd Colt Rd 10/14/24 11/01/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure Exported on October 4,2024 11:35:27 AM CDT 2 Street Closure Report: Current Closures smartsheet oak� MEML---AEW—�mmiM Description Department Department Contact 1 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II Audra Ln Stockton St Mockingbird Ln 07/29/24 11/08/24 Connection new storm drainage Private Development Zabdiel Mote Lane Closure 3 to existing City of Denton drainage. 4 Ave A Collins St Eagle Dr 10/08/24 10/11/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Ave C Eagle or Highland St 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure 6 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Bonnie Brae St Willowwood St Railroad tracks 10/07/24 10/11/24 Sanitary Sewer service line Engineering Robin Davis Full Closure 7 installations crossing under Bonnie Brae Bonnie Brae St S Willowwood St Walt Parker or 10/14/24 10/18/24 Sanitary Sewer service line Engineering Robin Davis Full Closure 8 installations crossing under Bonnie Brae 9 Central Ave Maple St Highland St 06/03/24 10/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Crescent St Ector St Hillcrest St 12/27/23 10/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 12 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 13 Hillcrest St Panhandle St Crescent St 12/27/23 10/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 14 Houston PI Thomas St Bradley St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 15 Locust St N Coronado or Orr St 10/07/24 10/25/24 Sidewalk/Curb/Road Repair Streets Roy San Miguel Lane Closure 16 Loop 288 University-US 380 McKinney St 09/23/24 10/21/24 Sidewalk Installation Engineering Robin Davis Rolling Closure 17 Marietta St Oak St W Scripture St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Mayhill Rd Colorado Blvd Edwards Rd 01/31/24 10/15/24 Various traffic lanes will remain Engineering Tracy Beck Lane Closure 18 closed for final construction activities. 19 Montecito Dr Hickory Creek Rd Palo Verde Dr 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure 20 Ocean or Atlantic or Nautical Ln 10/02/24 10/23/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 21 Panhandle St Ector St Aileen St 09/27/24 10/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Ryan Rd W Lauren's PI Rd Leisure Ln 09/20/24 10/28/24 Work zone closure and Other Delilah Garcia Rolling Closure 22 flaggers,both lanes are open durin 9AM-3PM(utility lines& poles 23 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 10/25/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad Vine St Texas St Schmitz Ave 10/07/24 10/11/24 Water service being installed for Water Jason Shipley Full Closure 24 521 Texas, Road will be closed to Thru Traffic. 25 Welch St Highland St Hickory St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 26 Welch St S Eagle or Highland St 06/03/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 27 Willowood St Leslie St Westwood or 09/30/24 10/30/24 Sanitary Sewer,water taps and Private Development Gavin Petner Lane Closure storm sewer Exported on October 4,2024 11:32:52 AM CDT 3 Street Closure Report: Completed Closures smartsheet __ _ _ • . •- 0 •-• • Description Department -•. -nt Contact • - •- 1 Bernard St Acme St Roselawn Dr 05/30/23 09/15/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Brandywine St Copper Ridge St Briarwood St 08/26/24 09/20/24 Curb and Asphalt Repair Streets Roy San Miguel Lane Closure 3 Countess Ln Thoroughbred TO Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure Edwards Rd @ Colorado Blvd @ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Tracy L.Beck,PE,PMP Lane Closure Mayhill Road from Edwards/DCTA Railroad Crossing to Colorado Blvd will 4 be permanently closed Tuesday 9/3/24.Access to/from Edwards Road will take the new Mayhill/Edwards Intersection north of Colorado Blvd. Edwards Rd(FKA Mayhill Leafy Ln Mayhill Rd(New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERN Engineering Other Tracy L.Beck,PE,PMP Lane Closure Rd) Edwards(formerly Mayhill)will open to traffic from Leafy (Pecan Creek Manufactured Home Community)north to the new Mayhill Road.Traffic Signal will be fully operational Thursday 9/5/24 pending no issues. Various traffic lanes in each direction will remain closed for final construction activities. 6 Elm St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 7 Farris Rd Kingsrow Oak Bend Cir 08/22/24 09/09/24 Street repairs Streets Jesse Rodriguez Full Closure 8 Hickory St E Bell Ave Locust St 09/25/24 09/25/24 5:30AM-8:30AM Other Colt Morris Full Closure 9 Locust St Hickory St McKinney St 08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoT Seth Garcia Full Closure 10 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 09/06/24 Installation of new driveway Private Development Public Zabdiel Mote Lane Closure approaches Works Inspections 11 Oak/Hickory St Bonnie Brae St N Texas Blvd 08/15/24 09/20/24 DME Conduit and Caved in Public Works Inspections Ethan Keith Full Closure Trench Repair 12 Ocean Dr Atlantic Dr Nautical Lane 08/26/24 09/05/24 Sanitary Sewer install Private Development Gavin Petner Full Closure 13 Panhandle St Heritage TO Stanley St 07/15/24 09/20/24 Drive Approach Public Works Inspections Collin Cole Full Closure 14 Potomac Pkwy Shenandoah Trail Stone Mountain Dr 08/19/24 09/13/24 Concrete Panel repair Streets Roy San Miguel Lane Closure Exported on October 4,2024 11:32:58 AM CDT