2024/10/25 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Oct 28th - Nov 3rd
Street/Intersection Description Department Department Contact Closure Type
1 Fairfax Rd(2200) @ Longridge Dr Intersection 11/04/24 11/22/24 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
2 Wind River Ln(3100) Unicorn Lake Blvd 135 Service Rd 11/12/24 11/29/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
Exported on October 25,2024 2:37:17 PM CDT
2 Street Closure Report: Current Closures smartsheet
ulas losure Find Department Contact Closure Type
1 !bbyW.y(5313) Glenngary Way Jeffrey Dr 10/14/24 11/08/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure
2 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
3 Allred Rd handle
Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Audra Ln Stockton St Mockingbird Ln 07/29/24 11/08/24 Connection new storm drainage Private Development Zabdiel Mota Lane Closure
4 to existing City of Denton
drainage.
5 Ave A Collins St Eagle or 10/08/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Ave C Eagle or Highland St 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure
7 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
8 Bonnie Brae St S Walt Parker Dr Willowwood St 10/28/24 11/01/24 installation of SS services Engineering Robin Davis Full Closure
crossing under Bonnie Brae.
9 Central Ave Maple St Highland St 06/03/24 11/15/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Crescent St Ector St Hillcrest St 12/27/23 11/15/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
12 Duncan St Kerley St 600 ft west 10/21/24 11/01/24 Manhole Installation in the Private Development Tasheba Jones Lane Closure
street
13 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
14 Hillcrest St Panhandle St Crescent St 12/27/23 11/29/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Houston PI Thomas St Bradley St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Linden or W Eastpark Blvd N Bonnie Brae St 10/28/24 11/22/24 Underground utility installation Water Jason Shipley Full Closure
17 Locust St N Coronado Dr Orr St 10/07/24 11/08/24 Sidewalk/Curb/Road Repair Streets Roy San Miguel Lane Closure
18 Loop 288 S S 1-35 E @ intersection 10/21/24 11/01/24 Span replacement/Boring& Other Delilah Garcia Lane Closure
placing conduit
19 Marietta St Oak St W Scripture St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Panhandle St Ector St Aileen St 09/27/24 11/29/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Rose St Carnal Blvd Sherman Dr 10/21/24 10/31/24 Locating Atmos Utilities Atmos Public Works Toni Jett Full Closure
Inspections
Ryan Rd W Lauren's PI Rd Leisure Ln 09/20/24 10/28/24 Work zone closure and Other Delilah Garcia Rolling Closure
22 flaggers,both lanes are open
during 9AM-3PM(utility lines&
poles)
23 Spencer Rd Spencer Rd Brinker Rd 10/28/24 11/01/24 Atmos Gas Atmos Luis Martinez Lane Closure
24 Stallion St(7809) Lakeview Blvd Colt Rd 10/14/24 11/01/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
25 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 11/08/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
26 Thomas St Panhandle St Emery St 10/11/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Welch St Highland St Hickory St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
28 Welch St S Eagle or Highland St 06/03/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
29 Willowood St Leslie St Westwood or 09/30/24 10/30/24 Sanitary Sewer,water taps and Private Development Gavin Petner Lane Closure
storm sewer
Exported on October 25,2024 2:38:22 PM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/ • . •- . •-1 • Desc iptionDepartment Department • • •-
Bonnie Brae St Willowwood St Railroad tracks 10/07/24 10/11/24 Sanitary Sewer service line Engineering Robin Davis Full Closure
1 installations crossing under
Bonnie Brae
Bonnie Brae St S Willowwood St Walt Parker Dr 10/14/24 10/18/24 Sanitary Sewer service line Engineering Robin Davis Full Closure
2 installations crossing under
Bonnie Brae
Bonnie Brae St S FM 1515/Airport Road Main Stadium Drive 10/21/24 10/23/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
3 line crossing under Bonnie Brae
-Please use North Texas Blvd
to access the stadium area
4 Boyd St Wayne st Lattimore st 10/10/24 10/18/24 Base failure repairs Public Works Inspections Alexander Cervantes Full Closure
Streets
5 Countess Ln Thoroughbred Tri Cul-de-Sac 09/02/24 09/27/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
6 Hickory St E Bell Ave Locust St 09/25/24 09/25/24 5:30AM-8:30AM Other Colt Morris Full Closure
7 Londonderry Ln Londonderry Ln E Hollyhill Ln 10/24/24 10/25/24 Spectrum Span Replacement Other Delilah Garcia Lane Closure
8 Loop 288 University-US 380 McKinney St 09/23/24 10/21/24 Sidewalk Installation Engineering Robin Davis Rolling Closure
Mayhill Rd Colorado Blvd Edwards Rd 01/31/24 10/15/24 Various traffic lanes will remain Engineering Tracy Beck Lane Closure
9 closed for final construction
activities.
10 Montecito Dr Hickory Creek Rd Palo Verde Dr 05/28/24 10/11/24 Street Reconstruction Streets Roy San Miguel Full Closure
11 Ocean Dr Atlantic Dr Nautical Ln 10/02/24 10/23/24 Sanitary Sewer install Private Development Gavin Petner Full Closure
Vine St Texas St Schmitz Ave 10/07/24 10/08/24 Water service being installed for Water Jason Shipley Full Closure
12 521 Texas, Road will be closed
to Thru Traffic.
Exported on October 25,2024 2:38:38 PM CDT