1 Blagg Rd Mayhill Rd Geesling Rd 1 12/02/24 12/10/24 Replacement of storm drainage pipes Drainage Tobias Nelson Full Closure
2 Club View Dr Creek View Ct Club View Ct 12/09/24 01/10/25 Street Panel and Sidewalk Repair Streets Roy San Miguel Lane Closure
3 Morse St Loop 288 Mayhill Rd 12/02/24 O6/27/25 Water Line Replacement and Road Public Works Inspections Kristine Stewart Lane Closure
Reconstruction Streets Water
Exported on November 22,2024 12:07:58 PM CST
2 Street Closure Report: Current Closures smartsheet
'sure End Description Department Department
Date
1 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Audra Ln Stockton St Mockingbird Ln 07/29/24 12/06/24 Connection new storm drainage Private Development Zabdiel Mota Lane Closure
2 to existing City of Denton
drainage.
3 Ave A Collins St Eagle Dr 10/08/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Ave B Fannin St Margie St 11/22/24 01/31/25 Pavement replacement Engineering Scott Fettig Full Closure
5 Ave C Eagle or Highland St 08/26/24 12/31/24 Pavement replacement. Engineering Scott Fettig Full Closure
6 Bernard St Lindsey St Fannin St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
7 Central Ave Maple St Highland St 06/03/24 11/29/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 01/20/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
9 Collins St Ave A Bernard St 08/26/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Crescent St Ector St Hillcrest St 12/27/23 11/29/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Deerwood Pkwy Kings Row Grant Pkwy 11/23/24 11/27/24 Asphalt Restoration Public Works Inspections Armando Beltran Lane Closure
12 Eagle or Beatty St Central Ave 11/25/24 12/13/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
13 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
14 Hillcrest St Panhandle St Crescent St 12/27/23 11/29/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Houston PI Thomas St Bradley St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Kenwood St Fox Hollow Wilderness St 11/19/24 01/10/25 Reconstruct of Kenwood St Streets Jesse Rodriguez Full Closure
Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure
17 and gutter mill subgrade
stabilization
18 Luck Hole or Pine Hills Penina 11/12/24 11/29/24 Concrete panel Repair Streets Roy San Miguel Lane Closure
19 Margie St Ave A Ave B 11/01/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Marietta St Oak St W Scripture St 09/27/24 12/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Ocean Dr Atlantic Dr Nautical Ln 11/18/24 11/30/24 Sanitary Sewer install Private Development Gavin Petner Full Closure
22 Panhandle St Bonnie Brea Heritage Trl 11/06/24 11/29/24 Panel Replacement Public Works Inspections Collin Cole Lane Closure
23 Panhandle St Ector St Aileen St 09/27/24 11/29/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
24 Robinwood Ln Emerson Ln Live Oak St 11/12/24 01/20/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
25 Thomas St Panhandle St Emery St 10/11/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
26 Welch St Highland St Hickory St 08/26/24 12/31/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
27 Welch St S Eagle or Highland St 06/03/24 11/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
28 Wind River Ln(3100) Unicorn Lake Blvd 135 Service Rd 11/12/24 11/29/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
29 Winston Dr Woodlake or Cul-de-sac 11/13/24 12/06/24 SERVICE EXTENSION Atmos Eddie Adams Full Closure
(UNDERGROUND)
Exported on November 22,2024 12:08:09 PM CST
3 Street Closure Report: Completed Closures smartsheet
Street/ • . •- . •-1 • Description Department Depa • • •-
1 Abby Way(5313) Glenngary Way Jeffrey Dr 10/14/24 11/15/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure
2 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 10/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
Bonnie Brae St S FM 1515/Airport Road Main Stadium Drive 10/21/24 10/23/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
3 line crossing under Bonnie Brae
-Please use North Texas Blvd
to access the stadium area
4 Bonnie Brae St S Walt Parker Dr Willowwood St 10/28/24 11/01/24 installation of SS services Engineering Robin Davis Full Closure
crossing under Bonnie Brae.
5 Doubleoak St Mack Dr Longmeadow St 11/11/24 11/13/24 HVAC EXISTING ATMOS LINE Atmos Alex Cervantez Full Closure
6 Duncan St Kerley St 600 fl west 10/21/24 11/01/24 Manhole Installation in the Private Development Tasheba Jones Lane Closure
street
7 Fairfax Rd(2200) Longridge Dr @ intersection 11/04/24 11/22/24 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
8 Linden Dr W Eastpark Blvd Bonnie Brae St N 10/28/24 11/22/24 Underground utility installation Water Jason Shipley Full Closure
9 Locust St N Coronado Dr Orr St 10/07/24 10/31/24 Sidewalk/Curb/Road Repair Streets Roy San Miguel Lane Closure
10 Londonderry Ln Londonderry Ln E Hollyhill Ln 10/24/24 10/25/24 Spectrum Span Replacement Other Delilah Garcia Lane Closure
11 Loop 288 S S 1-35 E @ intersection 10/21/24 11/01/24 Span replacement/Boring& Other Delilah Garcia Lane Closure
placing conduit
12 Medpark Dr Kings Row Thomas St 11/04/24 11/15/24 New Fiber Optics Installation via Public Works Inspections John Poore Lane Closure
Bore
13 Oak St W Kings Row Thomas St 11/04/24 11/15/24 Fiber Optic Installation Public Works Inspections John Poore Lane Closure
14 Ocean Dr Atlantic Dr Nautical Ln 10/02/24 10/23/24 Sanitary Sewer install Private Development Gavin Petner Full Closure
15 Rose St Carrel Blvd Sherman Dr 10/21/24 11/08/24 Locating Atmos Utilities Atmos Public Works Toni Jett Full Closure
Inspections
Ryan Rd W Lauren's PI Rd Leisure Ln 09/20/24 10/28/24 Work zone closure and Other Delilah Garcia Rolling Closure
16 flaggers,both lanes are open
during 9AM-3PM(utility lines&
poles)
17 Spencer Rd Spencer Rd Brinker Rd 10/28/24 11/01/24 Atmos Gas Atmos Luis Martinez Lane Closure
18 Stallion St(7809) Lakeview Blvd Colt Rd 10/14/24 11/01/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 11/07/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
19 Exposition to Railroad-Striping
to be done in the next week
weather permitting
20 Sycamore St W Elm St Cedar St 11/19/24 11/21/24 Water Service Tap Water Thomas Wittmis Full Closure
21 Valley Creek Cul-de-sac Canyon Ct 11/04/24 11/12/24 Base Failure repairs Streets Jesse Rodriguez Full Closure
22 Willowood St Leslie St Westwood Dr 09/30/24 10/30/24 Sanitary Sewer,water taps and Private Development Gavin Petner Lane Closure
storm sewer
23 Winston Dr Waterford Way Cul-de-sac 11/04/24 11/21/24 Gas Main Installation Public Works Inspections Christopher Yanez Full Closure
Exported on November 22,2024 12:08:40 PM CST