2025/01/03 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Jan 6th - 12th
Closure Start
Street/Intersection To Date IMI Description Department Department Contact Closure Type
1 Desert Willow Or Silktree Ct @ intersection 1 01/13/25 02/21/25 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure
2 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/14/25 Concrete Panels and SideWalk Repair Streets Roy San Miguel Lane Closure
3 Hidden Path Ln(7808) White Dove Ln Montecito Dr 01/27/25 03/07/25 Concrete Panel and Sidewalk Repair Streets Roy San Miguel Lane Closure
4 Precision Or Airport Rd UNT Library Annex 04/01/25 07/31/25 Reconshcution Engineering Other Gio Pineiro Full Closure
Exported on January 3,2025 11:28:13 AM CST
2 Street Closure Report: Current Closures smartsheet
'sure End Description Department Department
Date
1 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Audra Ln Stockton St Mockingbird Ln 07/29/24 02/06/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure
2 to existing City of Denton
drainage.
3 Ave A Collins St Eagle or 10/08/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Ave B Fannin St Margie St 11/22/24 01/31/25 Pavement replacement Engineering Scott Fettig Full Closure
5 Ave C Eagle or Highland St 08/26/24 01/31/25 Pavement replacement. Engineering Scott Fettig Full Closure
6 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
7 Bonnie Brae St FM1515 Walt Parker or 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 01/20/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
9 Club View Dr Creek View Ct Club View Ct 12/09/24 01/10/25 Street Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
10 Collins St Ave A Bernard St 08/26/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Eagle or Beatty St Central Ave 11/25/24 01/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
12 Fannin St Ave A Ave B 12/09/24 01/31/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure
13 Harvest Hill or Waldorf or Harvest Glen or 01/06/25 02/07/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
14 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
15 Hickory St W Fry St Welch St S 12/04/24 01/10/25 Metal flashing and masonry Other Alexander Cervantes Lane Closure
replacement
16 Hillcrest St Panhandle St Crescent St 12/27/23 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
17 Houston PI Thomas St Bradley St 09/27/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure
18 and gutter mill subgrade
stabilization
19 Margie St Ave A Ave B 11/01/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Marietta St Oak St W Scripture St 09/27/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Mockingbird Ln Howard Ct Lance Ln 01/06/25 02/07/25 Sidewalk and ADA repair Streets Roy San Miguel Lane Closure
22 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
23 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
24 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 02/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
25 Ocean or Atlantic or Nautical Ln 01/02/25 02/28/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
26 Panhandle St Ector St Aileen St 09/27/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Robinwood Ln Emerson Ln Live Oak St 11/12/24 01/20/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
28 Robinwood Ln Mistywood Ln Kayewood Dr 01/06/25 01/27/25 RCP Installation Work Engineering Sheldon Gatewood Full Closure
29 Smith St Hill St Duncan St 12/11/24 01/15/25 Manhole Installation in the Public Works Inspections Tasheba Jones Lane Closure
street
30 Thomas St Panhandle St Emery St 10/11/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
31 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 02/28/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure
ins
32 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
33 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
34 Willowwood St Westwood or Leslie St 01/16/25 02/28/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on January 3,2025 11:29:17 AM CST
3 Street Closure Report: Completed Closures smartsheet
Description Department Department Contact
1 Blagg Rd Mayhill Rd Geesling Rd 12/02/24 12/10/24 Replacement of storm drainage Drainage Tobias Nelson Full Closure
pipes
2 Bonnie Brae St Willowwood St Walt Parker Dr 12/17/24 12/20/24 Completing SS line connection Engineering Shawn Messick Full Closure
3 Central Ave Maple St Highland St 06/03/24 12/20/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Crescent St Ector St Hillcrest St 12/27/23 12/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Luck Hole Dr Pine Hills Ln Penina Trl 11/12/24 01/03/25 Concrete panel Repair Streets Roy San Miguel Lane Closure
6 Nautical Ln Hickory Creek Rd Ocean Dr 12/12/24 01/01/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
7 Winston or Woodlake Dr Cul-de-sac 11/13/24 12/06/24 SERVICE EXTENSION Atmos Eddie Adams Full Closure
(UNDERGROUND)
Exported on January 3,2025 11:29:37 AM CST