Loading...
2025/01/10 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jan 13th - 19th Street/Intersection From To Closure Start Description Department Department Contact Closure Type 1 Hidden Path Ln(7808) White Dove Ln Montecito Dr 01/27/25 03/07/25 Concrete Panel and Sidewalk Repair Streets Roy San Miguel Lane Closure 2 Precision Dr Airport Rd UNT Library Annex 04/01/25 07/31/25 Reconstrcution Engineering Other Gio Pineiro Full Closure Exported on January 10,2025 12:20:21 PM CST 2 Street Closure Report: Current Closures smartsheet 'sure End Description Department Department Date 1 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Audra Ln Stockton St Mockingbird Ln 07/29/24 02/06/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure 2 to existing City of Denton drainage. 3 Ave A Collins St Eagle or 10/08/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 4 Ave B Fannin St Margie St 11/22/24 01/31/25 Pavement replacement Engineering Scott Fettig Full Closure 5 Ave C Eagle or Highland St 08/26/24 01/31/25 Pavement replacement. Engineering Scott Fettig Full Closure 6 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 7 Bonnie Brae St FM1515 Walt Parker or 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 8 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 01/20/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 9 Collins St Ave A Bernard St 08/26/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Desert Willow or Silktree Ct @ intersection 01/13/25 02/21/25 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure 11 Eagle Dr Beatty St Central Ave 11/25/24 01/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 12 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/14/25 Concrete Panels and Sidewalk Streets Roy San Miguel Lane Closure Repair 13 Fannin St Ave A Ave B 12/09/24 01/31/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure 14 Harvest Hill or Waldorf Dr Harvest Glen or 01/06/25 02/07/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 15 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 16 Hickory St W Fry St Welch St S 12/04/24 01/14/25 Metal flashing and masonry Other Alexander Cervantes Lane Closure replacement 17 Hillcrest St Panhandle St Crescent St 12/27/23 01/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 18 Houston PI Thomas St Bradley St 09/27/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure 19 and gutter mill subgrade stabilization 20 Margie St Ave A Ave B 11/01/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Marietta St Oak St W Scripture St 09/27/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 22 Mockingbird Ln Howard Ct Lance Ln 01/06/25 02/07/25 Sidewalk and ADA repair Streets Roy San Miguel Lane Closure 23 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 24 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 25 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 02/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 26 Ocean or Atlantic or Nautical Ln 01/02/25 02/28/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 27 Panhandle St Ector St Aileen St 09/27/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 28 Robinwood Ln Emerson Ln Live Oak St 11/12/24 01/20/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 29 Robinwood Ln Mistywood Ln Kayewood or 01/06/25 01/27/25 RCP Installation Work Engineering Sheldon Gatewood Full Closure 30 Smith St Hill St Duncan St 12/11/24 01/24/25 Manhole Installation in the Public Works Inspections Tasheba Jones Lane Closure street and water taps 31 Thomas St Panhandle St Emery St 10/11/24 01/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 32 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 02/28/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure ins 33 welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 34 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 35 Willowwood St Westwood or Leslie St 01/16/25 02/28/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on January 10,2025 12:20:34 PM CST 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From 0 Description Department Contact 1 Bonnie Brae St Willowwood St Walt Parker Dr 12/17/24 12/20/24 Completing SS line connection Engineering Shawn Messick Full Closure 2 Central Ave Maple St Highland St 06/03/24 12/20/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 3 Club View or Creek View Ct Club View Ct 12/09/24 01/10/25 Street Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 4 Crescent St Ector St Hillcrest St 12/27/23 12/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Luck Hole Dr Pine Hills Ln Penina Trl 11/12/24 01/03/25 Concrete panel Repair Streets Roy San Miguel Lane Closure 6 Nautical Ln Hickory Creek Rd Ocean Dr 12/12/24 01/01/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure Exported on January 10,2025 12:20:58 PM CST