Loading...
2025/02/07 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 10th - 16th Street/Intersection From Closure Start Description Department Department Contact Closure Type 1 Lake Side Ct Lake Country Dr Cul v Sac 40303125 04/11/25 Sidewalk Repair Streets Roy SanMiguel Lane Closu2 Precision Dr Airport Rd UNT Library Annex 01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 3 Spur Ct Lake Country Dr Cul v Sac 03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure Exported on February 7,2025 11:42:25 AM CST 2 Street Closure Report: Current Closures smartsheet sure End Description Department Department Date 1 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure 2 to existing City of Denton drainage. 3 Ave A Collins St Eagle or 10/08/24 03/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 4 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 5 Ave B Fannin St Margie St 11/22/24 02/28/25 Pavement replacement Engineering Scott Fettig Full Closure 6 Ave C Eagle or Highland St 08/26/24 03/01/25 Pavement replacement. Engineering Scott Fettig Full Closure 7 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 8 Bonnie Brae St Birch Grove Bend Vintage Blvd 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Lane Closure infrastructure installation 9 Bonnie Brae St FM1515 Walt Parker or 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Bonnie Brae St N Oak St Hickory St 02/10/25 02/17/25 Concrete poles install on that Public Works Inspections John,Cantu Lane Closure corner for DME 11 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 12 Collins St Ave A Bernard St 08/26/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Congress St. Ponder Ave. Coit St. 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 14 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Dunes St Dunes Ct @ Intersection 01/27/25 02/14/25 Removing asphalt and placing Engineering Taylor Holt Full Closure 15 valley gutter in the eastern portion of the intersection on Dunes St 16 Eagle or Beatty St Central Ave 11/25/24 02/14/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 17 Emerald Trace or Shagbank or Ridgehurst Ln 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 18 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 19 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/14/25 Concrete Panels and SideWalk Streets Roy San Miguel Lane Closure Repair 20 Fannin St Ave A Ave B 12/09/24 02/14/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure 21 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 22 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 23 Hidden Path Ln(7808) White Dove Ln Montecito or 01/27/25 03/07/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 24 Hillcrest St Panhandle St Crescent St 12/27/23 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 25 Houston PI Thomas St Bradley St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure 26 and gutter mill subgrade stabilization 27 Margie St Ave A Ave B 11/01/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 28 Marietta St Oak St W Scripture St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 29 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 30 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 31 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 02/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 32 Ocean or Atlantic or Nautical Ln 01/02/25 02/28/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 33 Panhandle St Ector St Aileen St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on February 7,2025 11:42:59 AM CST Streett Intersection To Closure Start Closure End Department Date Date Description Department Contact Closure Type 34 Ridgehurst Ln Bonnie Brae St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 35 Robinwood Ln Live Oak Kayewood Or 01/27/25 02/28/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 36 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 37 Shagbank Or Homebeam St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 38 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 39 Texas st Bell Ave Oakland St 02/08/25 02/12/25 Driver pipeline replacing valley Public Works Inspections Alexander Cervantes Full Closure gutter 40 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 41 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 02/28/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure ins 42 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 43 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 44 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 45 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 46 Willowwood St Westwood or Leslie St 01/16/25 02/28/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on February 7,2025 11:42:59 AM CST 3 Street Closure Report: Completed Closures smartsheet __ ox • •- . •-1 ih • Description -•. -•. Contact • •- 1 Club View or Creek View Ct Club View Ct 12/09/24 01/10/25 Street Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 2 Desert Willow or Silktree Ct @ Intersection 01/13/25 02/06/25 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure 3 Harvest Hill Dr Waldorf Dr Harvest Glen or 01/06/25 01/17/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 4 Hickory St W Fry St Welch St S 12/04/24 01/14/25 Metal flashing and masonry Other Alexander Cervantes Lane Closure replacement 5 Mockingbird Ln Howard Ct Lance Ln 01/06/25 02/07/25 Sidewalk and ADA repair Streets Roy San Miguel Lane Closure Pickwick Ln Oxford Lane @ Intersection 01/27/25 01/31/25 Removing asphalt and placing Engineering Taylor Holt Full Closure 6 valley gutter in the eastern portion of the intersection on Pickwick Ln. 7 Ryan Rd Country Club Rd Montecito or 01/17/25 01/24/25 Hydroexcavation of existing Public Works Inspections Caitlin Brown Rolling Closure utilities 8 Smith St Hill St Duncan St 12/11/24 01/27/25 Manhole Installation in the Public Works Inspections Tasheba Jones Lane Closure street and water taps Exported on February 7,2025 11:43:26 AM CST