Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
020725 Friday Staff Report
City Manager’s Office 215 E. McKinney St., Denton, TX 76201 (940) 349-8307 OUR CORE VALUES Inclusion Collaboration Quality Service Strategic Focus Fiscal Responsibility MEMORANDUM DATE: Feb. 7, 2025 TO: The Honorable Mayor Hudspeth and Council Members FROM: Sara Hensley, City Manager SUBJECT: Friday Staff Report Upcoming Meetings A.Public Utilities Board on Monday, February 10, 2025, at 9:00 a.m. in the City Council Work Session Room. B.Development Code Review Committee on Monday, February 10, 2025, at 3:00 p.m. atthe Development Service Center. C.Board of Ethics on Monday, February 10, 2025, at 5:30 p.m. in the City Council Work Session Room. D.Historic Landmark Commission on Monday, February 10, 2025, at 5:30 p.m. at theDevelopment Service Center. E.Library Board on Monday, February 10, 2025, at 5:30 p.m. at the Emily Fowler CentralLibrary. F.Economic Development Partnership Board on Wednesday, February 12, 2025, at 11:00a.m. at the Development Service Center. G.Airport Advisory Board on Wednesday, February 12, 2025, at 3:00 p.m. in the AirportTerminal Meeting Room. H.Planning and Zoning Commission on Wednesday, February 12, 2025, at 4:00 p.m. in the City Council Work Session Room. I.Planning and Zoning Commission on Wednesday, February 12, 2025, at 5:00 p.m. in theCity Council Work Session Room & Council Chambers. J.Health and Building Standards Commission on Thursday, February 13, 2025, at 3:00p.m. at the Development Service Center. Please check the City of Denton website for final meeting days and times as information is subject to change after the Friday Report is published. Public Meetings & Agendas | Denton, TX (civicplus.com) 2 General Information & Status Updates A.City Council Priorities Update – The City Manager’s Office is pleased to provide an update on Council priorities. The attached report reflects progress through the fiscal year's first quarter. Initiatives aligned with Council priorities are also tracked and reported through theCity’s performance management software and included on the City’s public-facingdashboard, as well as the over 100 initiatives supporting the Council’s Key Focus Areas.This report includes a detailed list of specific actions associated with the Climate Action Plan (pg. 15) and an overall update and link to the Affordable Housing Strategic Toolkitdashboard (pg. 10). Staff contact: Aimée Kaslik, City Manager’s Office B.Year in Review – Staff shared the FY 23-24 ‘Year in Review’ video highlighting theprogress and achievements. This video showcases the hard work of city staff, the dedication of our community partners, and the impact of the policies and initiatives. View the DentonYear in Review Video here. Staff contact: Aimée Kaslik, City Manager’s Office C.Fine Arts Theatre – Construction is underway to revitalize the historic Fine Arts Theatreand is expected to take approximately 12-15 months. On April 2, 2024, the City Council approved an incentive agreement with Fine Arts Theatre LLC, agroup led by local developers Alex Payne and BradAndrus, to restore the theatre, which has been inactivesince 1982. This restoration aligns with Denton's economic development strategy, which focuses on enhancing the downtown area, fostering a vibrant townsquare atmosphere, and promoting arts and music. Formore information and updates on the project,visit www.texasfineartstheatre.com. Staff Contact: Christine Taylor, City Manager’s Office D.Mayor’s Pet Spotlight – Lucy is an energetic and lovable one-year-old American Pit BullTerrier. She has been in the shelter since Oct. 31, 2024, and staff is urgently seeking a foster or adoption to help improve her mental state. Lucy is highly food-motivated, which makes her easy to train and eager to learn. She already knows basic commands, showcasing her intelligence and willingness to please. She is housebroken, making her transition into a home environment smoother. Lucy loves toys and enjoys playtime, a great way to bond with her and provide mental stimulation. She would thrive as the only pet in the household. Please contact Denton Animal Services by phone at (940) 349-7594 or via email at Animal.Services@cityofdenton.com. Staff contact: Bailey Coleson, Animal Services 3 E.Housing Tax Credit Applications – Following the Council Work Session on Tuesday, Feb.4, regarding Housing Tax Credit Applications, developers who had not yet held neighborhood meetings were asked to do so before the public hearings on February 18 and to share the meeting details with the Council in advance. The following neighborhoodmeetings have been scheduled: •Roselawn Development: Wednesday, February 12, 2025, at Denia Recreation Center, 1001 Parvin St, Denton, TX 76205, Room A at 5:30 p.m. •McAdams Haven: Wednesday, February 12, 2025, at Serve Denton, 306 N Loop288, Denton, TX 76209, at 6:30 p.m. Public Hearings for each of the developments will be held on February 18 in the City Council Chambers at 6:30 p.m. Staff Contact: Christine Taylor, City Manager’s Office F.Monthly Mobility Report – Innovative Transportation Solutions (ITS) provides a monthlyreport that includes an overview of Texas Department of Transportation (TxDOT) regionalprojects. See the attached ITS Monthly Mobility Report for review. Staff contact: TrevorCrain, Capital Projects Responses to Council Member Requests for Information A.Parade Route Concessions – On Feb. 3, Council Member Holland shared an inquiry froma local organization interested in selling beverages along the 4th of July parade route. Staff shared requirements to sell water along the parade route; the organization must obtain aSolicitor and Itinerant Merchant Permit, which can be found on the City’s permittingwebsite. Staff contact: Autumn Natalie, Parks and Recreation B.Plugged Gas Well Setback – At the Feb. 4 Council Meeting, Council Member McGee inquired about the setback requirements for plugged gas wells. The minimum setback foractive gas wells in the extraterritorial jurisdiction (ETJ) is 100 feet, which is increased to200 feet for the Sanctuary development based on the development agreement. If a gas wellwere plugged, there would be no setback regulation. Staff contact: Charlie Rosendahl, Development Services C.Meter Reader – On Feb. 5, Council Member Beck shared an inquiry from a residentregarding attire for meter readers. Meter readers entering a property should wear reflectivevests indicating either the Denton Municipal Electric (DME) contractor or the contractor's company name. Please call customer service at 940-349-8700 if you are unsure whether a person accessing your property is a meter reader. Staff contact: Tony Puente, DentonMunicipal Electric Attachments A.FY 2024-25 Council Priorities Progress Report Q1 …………………………………….6 B.Monthly Mobility Report ………………………………………………………………23 4 Informal Staff Reports A.2025-027 Revising Building Codes for Solar and EV-Ready Homes………………......40 Upcoming Community Events and Public Meetings Please visit the City of Denton website for upcoming community events and details. Information A.Council Requests for Information ....................................................................................54 B.Public Meetings Calendar ................................................................................................56 C.Future Work Session Items ..............................................................................................60 D.Street Closure Report .......................................................................................................61 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 City of Denton Transportation Update Prepared by: January 2025 1 City of Denton Transportation/Mobility Project Status Report Prepared by ITS January 2025 PROJECTS • Project Summary ............................................ page 2 • I-35 North ....................................................... page 3 • I-35/35E/35W Merge...................................... page 5 • I-35E/Mayhill ................................................. page 7 • I-35W Frontage Roads Middle ....................... page 8 • Loop 288 West Frontage Roads ..................... page 9 • Loop 288 East-US 380 Connector ................ page 10 • Bonnie Brae Segment 7 ................................ page 11 • FM 1515 ....................................................... page 12 • FM 1173 ....................................................... page 13 • Outer Loop.................................................... page 14 • Glossary of Acronyms .................................. page 15 • TxDOT Funding Categories ......................... page 16 • Denton City Limits ....................................... page 17 23 City of Denton Transportation Update Prepared by: January 2025 2 PROJECT SUMMARY PROJECT LET DATE CONTRACTOR/ ENGINEER CONSTRUCTION COST I-35 North Various Stantec $897,796,423 I-35/35E/35W Merge 04-2024 Sema Construction $588,780,841 I-35E/Mayhill 06-2025 LTRA $139,130,349 I-35W Frontage Roads Middle 09-2028 WSP $446,891,327 Loop 288 West Frontage Roads 09-2028 CP&Y $227,423,354 Loop 288 East-US 380 Connector * Westwood $922,000,000 Bonnie Brae Segment 7 * Westwood * FM 1515 * LTRA $69,484,709 FM 1173 * Halff $125,852,145 Outer Loop * LJA $1,547,212,128 TOTAL $4,964,571,276 24 City of Denton Transportation Update Prepared by: January 2025 3 Current Activity: •PS&E: Work on the 100% PS&E plan set for the -074 CSJ is underway with updates to 2024TxDOT Specifications. Additionally, TxDOT plans to split -074 CSJ into three separate CSJs forletting. Anticipate meeting to be held in January 2025 to discuss same and to update project schedule. I-35 North CSJ: 0195-02-074; 0195-02-076; 0195-02-081; 0195- 01-116; 0195-02-084 Schematic Approval: January 31, 2019 Limits: From US 77 to FM 3002 (Cooke County line) Environmental Approval: October 7, 2019 Length: 12.4 miles Description: Reconstruct and widen 4- to 6-lane rural freeway with ramp modifications and reconstruct 4- to 4/6-lane frontage roads ROW Acquisition Complete: July 2023 Est. Construction Cost: $897,796,423 -074: $495,359,007 -081: $175,274,676-116: $110,895,970 -084: $116,266,771 Utility Relocations Complete: -074: January 2026 -081: April 2025 -116: October 2025 -084: October 2025 Funding: $801,507,230 CAT 4: $220,966,122 CAT 11: $2,574,631 CAT 12: $577,966,477 100% Plans: -074: * -081: January 2025 -116: February 2025 -084: February 2025 Firm: Stantec Ready to Let Date: -074: January 2026 -081: April 2025 -116: October 2025 -084: October 2025 TxDOT PM: Dawit Abraham Let Date: -074: July 2026 -081: April 2025 -116: December 2029 -084: December 2029 25 City of Denton Transportation Update Prepared by: January 2025 4 •Work on the 100% PS&E plan set for the -081 CSJ is underway with updates to 2024 TxDOT Specifications; TxDOT is revising scope to ensure that the project scope fits within the availablefunds. •Work on the 100% PS&E plan set for -084 CSJ is underway with updates to the 2024 TxDOT Specifications; some scope being shifted to -081 CSJ. •Utilities: Status of utilities in conflict is listed below by CSJ/Segment.IH-35 from US 77 to South of FM 455; CSJ: 0195-02-074Utilities that are clear of construction: AT&T, Atmos Distribution, City of Denton, Frontier, Nortex, OneOK, and Sanger Electric. o AT&T: ClearoBolivar Water: Anticipate clearance in early 2026.o Brazos Electric: Construction complete. Wreck-out and transfer pending. Anticipateclearance in April 2025. o CenturyLink/Brightspeed: Construction to begin in February 2025. Anticipate clearance inMay 2025.o CoServ Electric: Construction underway. Anticipate clearance in June 2025. o Frontier: Clear o Lumen/Level 3: Relocations underway. Anticipate clearance in June 2025.o MCI/Verizon: Design pending. Utility agreement pending. Anticipate start of construction inearly 2025. Anticipate clearance in March 2025.o Nortex: Clear o Sanger Water/Wastewater: Relocations underway. Anticipate clearance in March 2025. o Suddenlink/Altice: Design and utility agreement pending. Anticipate start of relocations inFebruary 2025. Dependent upon CoServ.o UTRWD: Design and utility agreement finalized. Pending UTRWD contractor. Anticipateclearance in August 2025. o Zayo: Pending mobilization. Anticipate clearance in April 2025.IH-35 from North of FM 455 to View Road; CSJ: 0195-02-081 Utilities that are clear of construction: AT&T, Nortex, Sanger Electric and Sanger Water/Wastewater. o AT&T: Clear o Bolivar Water: Construction underway. Anticipate clearance in March 2025. o Brightspeed/Centurylink: Construction complete. Awaiting wreck-out and transfer to newfacilities. Anticipate clearance in February 2025.o Lumen/Level 3: Construction underway. Anticipate clearance in March 2025. o MCI/Verizon: Anticipate start of construction in February 2025. Anticipate clearance in April 2025.o Nortex: ClearoZayo: Construction underway. Anticipate completion in February 2025.IH-35 from View Road to Cooke County Line (FM 3002); CSJ: 0195-02-084 Utilities that are clear of construction: AT&T, CoServ Electric, and Nortex o Bolivar WSC: Construction start pending. Anticipate clearance in August 2025.o CoServ Electric: ClearoLevel 3/Lumen: Relocations complete. Splicing ongoing. Anticipate clearance in April 2025. o MCI/Verizon: Design and utility agreement pending. Construction start pending. o Nortex: ClearoOncor: Design pending. Utility agreement pending. Anticipate start of construction inFebruary 2025. Anticipate clearance in May 2025.o Zayo: Design pending. Construction underway. Anticipate clearance in April 2025. 26 City of Denton Transportation Update Prepared by: January 2025 5 Current Activity: •Construction: The project let for construction on April 4, 2024. The project was awarded to Sema Construction with a low bid of $588,780,840.70, at 18% above engineer’s estimate. There are 1,356 working days and 56 months of barricades. Pre-construction meeting was heldon October 2, 2024. Construction began on January 13, 2025. •Utilities: Utilities that are clear of construction: AT&T, Atmos Distribution, Atmos Transmission, Brazos Valley Electric, City of Denton Water/Wastewater, CoServ Electric, DME Transmission, Fiberlight, and UPN. •Status of utilities in conflict is listed below. I-35/35E/35W Merge CSJ: 0195-03-099 (N Texas Blvd to I-35E/W) 0195-03-090 (I-35E/W to US 380) 0195-03-087 (US 380 to US 77) Schematic Approval: -090: August 2011 -087: January 31, 2019 Limits: From North Texas Blvd to US 77 north of Denton Environmental Approval: -090: June 2017 -087: October 7, 2019 Length: 5.073 miles ROW Acquisition Completed: May 2022 Description: Reconstruct interchange and existing frontage roads; reconstruct and widen to 6/8- lane rural freeway with ramp modifications Utility Relocations Complete: February 2025 Est. Construction Cost: $588,780,841 City of Denton Utility Relocations Completed: December 2024 Funding: $588,780,841 CAT 2: $65,978,054 CAT 3: $1,452,495 CAT 4: $75,042,004 CAT 11: $106,973,305 CAT 12 (Strategic Priority): $219,334,983 CAT 12 (Texas Clear Lanes): $120,000,000 100% Plans: January 2024 Firm & Key Contact: AECOM (-090); Stantec (-087) Let Date: April 4, 2024 TxDOT PM: John Rich Construction Start: January 2025 27 City of Denton Transportation Update Prepared by: January 2025 6 o Charter-Spectrum: Standalone construction complete. Joint duct construction ongoing.Anticipate clearance in January 2025.o City of Denton Water/Wastewater: ClearoDME Distribution: Relocations underway. Previously unidentified conflict being designed. Anticipate completion in February 2025. o Fiberlight (Joint Duct): Clear o Frontier: One unidentified conflict being resolved. Anticipate clearance end of January2025.o Level 3/Lumen (Joint Duct Bank): Construction underway from US 380 to US 77. Anticipate splicing in February 2025. Construction from Bonnie Brae to US 380 underway. Anticipate splicing in February 2025. o MCI/Verizon: Conduit install complete. Anticipate splicing in February 2025.o Zayo: Install complete. Repairs to new duct caused delay. Splicing remains.Anticipate clearance in January 2025. 28 City of Denton Transportation Update Prepared by: January 2025 7 Current Activity: •PS&E: LTRA updated the plan set to the 2024 TxDOT Specifications and included additional sheetsand quantities requested by TxDOT. LTRA submitted final plan set to TxDOT. •Utilities: Utilities currently clear of construction are: Atmos Gas (Distribution), AT&T, CenturyLink/Brightspeed, CoServ Gas, City of Denton, City of Denton Wastewater, NGG, Oncor, and United Private Networks. •Status of utilities in conflict is listed below.o Astound (formerly Grande): Construction underway. Anticipate splicing in January 2025.o CenturyLink/Brightspeed: Clear o Charter/Spectrum: Construction underway. Anticipate clearance in March 2025. o DME: Relocations underway. Anticipate clearance in May 2025.o DISD: Utility agreement pending. Anticipate start of construction in February 2025. Anticipateclearance in March 2025.o Frontier: Northbound frontage road clear. Pending Denton Electric pole relocation. Anticipatecompletion for southbound frontage road in March 2025. o Level 3/Lumen: Construction underway. Anticipate clearance in February 2025. o Zayo: Conduit install complete. Splicing ongoing. Anticipate completion in February 2025. I-35E/Mayhill CSJ: 0196-01-109 Schematic Approval: February 2011 Limits: I-35E intersection with Mayhill from Pockrus Page Rd to Loop 288 Environmental Clearance: January 31, 2012 Length: 1.912 miles ROW Acquisition Completed: November 2022 Description: Reconstruct interchange at Mayhill and I-35E and existing 4-lane frontage roads Utility Relocations Complete: May 2025 Est. Construction Cost: $139,130,349 City of Denton Utility Relocations Completed: February 2024 Funding: $139,130,349 CAT 2: $129,130,349 CAT 4: $10,000,000 100% Plans: November 2024 Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: May 2025 TxDOT Project Manager: Chaikou Bah Let Date: June 2025 29 City of Denton Transportation Update Prepared by: January 2025 8 Current Activity: • PS&E: WSP continues addressing TxDOT comments to 95% plan set and is working toward completion of final plan set. • ROW: There are 58 parcels to acquire. There are: 3 parcels in ED and 55 parcels acquired. ROW acquisition has been placed on hold due to District budgetary constraints. • Utilities: Status of utilities in conflict is listed below. o Astound (Grande): Design pending. Utility agreement pending. Construction schedule pending CoServ design. o Atmos: Design pending. Utility agreement pending. Anticipate clearance in December 2025. o Charter/Spectrum: Design pending. Utility agreement pending. Construction schedule pending CoServ design. o CoServ Electric: Design pending. Utility agreement pending. This utility is critical path. o DME Transmission: Joint use agreement pending. Facility to stay in place; not in conflict. o DME Distribution: Design pending. Utility agreement pending. o Fiberlight: Preliminary design approved. Agreement pending. Anticipate clearance in February 2025. o Lumen/Level 3: Preliminary design pending. Utility agreement pending. o Trinity River Authority: Anticipate TRA to be clear pending revisions to TxDOT plans. o Zayo: Design pending. Utility agreement pending. Anticipate start of construction in February 2025. I-35W Frontage Roads Middle CSJ: 0081-13-071 Schematic Approval: March 20, 2020 Limits: From 0.7 miles south of FM 407 to FM 2449 Environmental Clearance: June 30, 2020 Length: 6.76 miles Project Description: Construct frontage roads ROW Acquisition Complete: January 2026 Est. Construction Cost: $446,891,327 Utility Relocations Complete: March 2026 Funding: $213,024,000 CAT 2: $24,537,247 CAT 12: $188,486,753 100% Plans: December 2025 Firm: WSP Ready to Let Date: March 2026 TxDOT Contact: Gutema Gebriel Let Date: * 30 City of Denton Transportation Update Prepared by: January 2025 9 Current Status: •ROW: For RCSJ 2250-02-023, there are 19 parcels to acquire. There are: 2 parcels in ED and 17 parcels in possession. For RCSJ 2250-02-024,there are 20 parcels to acquire. Thereare: 5 parcels in negotiations and 15parcels in possession. •ROW acquisition efforts are on hold dueto District budgetary constraints. •PS&E: CP&Y updated PBLR for final submittal. •CP&Y updated Exhibit A and madefinal submittal on September 30, 2024. •The 95% PS&E plan set submittal was made on September 3, 2024. The 95% plan set is under review. The commentresolution meeting is expected to be heldin January 2025. •Bi-weekly coordination meetings underway. •Utilities: SUE Level submittal wasmade on October 11, 2024. Loop 288 West Frontage Roads CSJ: 2250-00-013 (from I-35 to US 380) 2250-00-032 (from US 380 to I-35W) Schematic Approval: March 20, 2020 Limits: From I-35 to I-35W Environmental Clearance: September 28, 2020 Length: 9.0 miles Description: Construct frontage roads ROW Acquisition Complete: September 2025 Estimated Construction Cost: $227,423,354 -013: $95,315,990 -032: $132,107,364 Utility Relocations Complete: April 2026 Funding: $3,000,000 CAT 3 $1,000,000 CAT 7 100% Plans: February 2025 Firm & Key Contact: CP&Y, Tom Cochill & Jacob Roberts Ready to Let Date: April 2026 TxDOT Project Manager: Gutema Gebriel Let Date: * 31 City of Denton Transportation Update Prepared by: January 2025 10 Current Activity: •PS&E: The revised 60% schematic was submitted to TxDOT for review on November 26, 2024.Schematic review comments provided to Westwood. Westwood responding to TxDOT schematic comments. •Westwood continues efforts on drainage report and bridge layouts. •Survey from US 380 to Kings Row has been staked to identify alignment for property owners. •SUE provider finalizing utility survey in the connector section. •Westwood is revising drainage report. •Westwood met with the City of Denton on January 2, 2025. •SUE provider notified that right-of-entry is clear in connector section for investigation. •Environmental: Tentative public hearing date is April 24, 2024. Loop 288 East-US 380 Connector CSJ: 2250-02-025; 0135-10-066 Schematic Approval: June 2025 Limits: from I-35 to US 380 east of Geesling Road Environmental Clearance: December 2025 Length: 8 miles Project Description: Construct Loop 288 frontage roads and grade separations and an improved connector to US 380 ROW Acquisition Completion: * Estimated Const. Cost: $922M Utility Relocations Completion: * Funding: * 100% Plans: * Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Ready to Let Date: * TxDOT PM: Nelson Underwood Let Date: * 32 City of Denton Transportation Update Prepared by: January 2025 11 Current Activity: •PS&E: The segment between US 77 and Loop 288 has been added to Loop 288 East contractwith Westwood. Bonnie Brae Segment 7 CSJ: * Schematic Approval: June 2025 Limits: From US 77 to Loop 288 Environmental Clearance: December 2025 Length: 0.2 miles ROW Acquisition Complete: * Description: Extension of Bonnie Brae north of US 77 Utility Relocations Complete: * Est. Construction Cost: * 100% Plans: * Funding: * Ready to Let Date: * Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Let Date: * TxDOT Project Manager: Nelson Underwood Construction Start: * 33 City of Denton Transportation Update Prepared by: January 2025 12 Current Activity: • PS&E: LTRA updated plans to the 2024 TxDOT Specifications and submitted the final plan set on June 28, 2024. Plans have been shelved until letting. • Exhibit A: LTRA submitted new Exhibit A for CPKC approval. • Utilities: Status of utilities in conflict: o Atmos: Final design approved. Permit pending. Construction schedule pending. o Brightspeed/CenturyLink: Design pending Oncor final design. o Charter/Spectrum: Design dependent on Oncor design. o City of Denton Water/Wastewater: Final design pending. Anticipate start of construction in March 2025. Anticipate clearance in December 2025. o Denton Municipal Electric: Preliminary design pending. Utility agreement pending. o Frontier: Design pending. o MCI/Verizon: Design pending. o Oncor: Design pending. Construction schedule pending. o Unite Private Networks: Design pending. FM 1515 CSJ: 1951-01-011 Schematic Re-approval: October 13, 2021 Limits: From Bonnie Brae to Masch Branch Road Environmental Approval: August 4, 2020 Length: 2.096 miles Environmental Re-eval: March 15, 2022 Description: Widen existing 2-lane rural section to a six- lane divided urban roadway ROW Acquisition Complete: July 2023 Est. Construction Cost: $69,484,709 Utility Relocations Complete: December 2025 Funding: $500,000 CAT 7 100% Plans: June 2024 Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: December 2025 TxDOT Project Manager: Bryan Esmaili-Doki Let Date: * 34 City of Denton Transportation Update Prepared by: January 2025 13 Current Activity: •PS&E: Halff continued addressing TxDOT 95% PS&E comments and is working toward completion of the 100% plan set. •Halff submitted BNSF Exhibit A on September 24, 2024. •Utilities: Status of utilities in conflict: o Altice-Suddenlink: Completing I-35 North relocations prior to FM 1173 relocations. o AT&T: Design revisions pending. Construction dependent upon Oncor and CoServ.o Atmos Gas: Design pending.o Brightspeed/CenturyLink: Design review completed; awaiting revisions. Awaiting Oncor designfor overhead portions.o City of Denton: Design under review with I-35 project.o CoServ: Initial design review completed; awaiting revisions.o Fiberlight: Design dependent upon Oncor and CoServ.o City of Krum: Design changes from Hopkins and NightHawk to be shown. Current long leadrelocate.o Oncor: Partial preliminary design complete; awaiting revisions for phase 2 design. o Zayo: Design revisions pending. Dependent on CoServ design. FM 1173 CSJ: 1059-01-047; 1059-02-002 Schematic Approval: March 20, 2020 Limits: From I-35E to FM 156 Environmental Clearance: August 26, 2021 Length: 3.613 miles Description: Widen and realign to 4/6-lane divided urban road ROW Acquisition Completed: September 2023 Est. Construction Cost: $125,852,145 -047: $62,892,803 -002: $62,959,342 Utility Relocations Complete: August 2026 Funding: * 100% Plans: January 2025 Firm & Key Contact: Halff Associates, Aimee Jones Ready to Let Date: August 2026 TxDOT PM: Kwan Lam Let Date: * 35 City of Denton Transportation Update Prepared by: January 2025 14 Current Activity: •Design: LJA continues preparing 30% schematic and evaluating alignments utilizing new field workdata. •LJA continues coordination with NCTCOG, TxDOT, USACE, and other agencies. •LJA continues identifying developments adjacent to proposed Outer Loop alignment. •Utilities: LJA continues evaluating transmission level utilities within study area and gathering information near refined alignments and coordinating with entities. LJA continues developing Level Dmap. •Environmental: Evaluating easements and TxDOT property near USACE property. Reviewingadditional constraints and areas of concern. Tracking right-of-entry responses. Ongoing field work inareas where right-of-entry has been obtained. •Other: Project website is available: www.DentonCountyOuterLoop.com. •Public Involvement: Public Scoping Meetings were held on October 29, 2024, at Midway Church in Pilot Point, and on October 30, 2024, at Denton Convention Center. Comment period closed onNovember 29, 2024. LJA is analyzing comments received. Outer Loop CSJ: 0918-46-341 Schematic Approval: December 2025 Limits: From I-35 to the DNT at the Denton County Line Environmental Clearance: Summer 2026 Length: 23 miles ROW Acquisition Complete: * Description: Construct a six-lane controlled access freeway with continuous frontage roads Utility Relocations Complete: * Est. Construction Cost: $1,547,212,128 100% Plans: * Funding: * Ready to Let Date: * Firm & Key Contact: LJA, Tony Kimmey Let Date: * TxDOT Project Manager: Liang Ding Construction Start: * 36 City of Denton Transportation Update Prepared by: January 2025 15 •AADT – Annual Average Daily Traffic •AFA – Advanced Funding Agreement •ARPA – Archeological Resources Protection Act •CE – Categorical Exclusion (environmental clearance process for projects that do not involve significantenvironmental impacts) •CLOMR – (FEMA’s) Conditional Letter of Map Revision •Conformity – Federal requirement in nonattainment areas to conduct air quality analysis on projects,programs, and policies identified in transportation plans, transportation improvement programs,federally funded projects, or projects requiring federal approval •CSJ – (TxDOT’s) Control Section Job Number •DCC – Design Concept Conference •EA – Environmental Assessment •ED – Eminent Domain •EIS – Environmental Impact Statement •EPIC – Environmental Permits, Issues, and Commitments •ESAL – Equivalent Single Axle Load (TxDOT design calculation) •FONSI – Finding of No Significant Impact •IAJR – Interstate Access Justification Request •ICA – Interlocal Cooperative Agreement •IFP – Initial Financial Plan •Let – Official date of receipt and opening of bids •MAPO – Meeting with Affected Property Owners •MPO – Metropolitan Planning Organization •MTP – Metropolitan Transportation Plan •NCTCOG – North Central Texas Council of Governments •NEPA – National Environmental Policy Act •NOPC – Notice of Proposed Construction •NTTA – North Texas Toll Authority •PBLR – Preliminary Bridge Layout Review •PS&E – Plans Specifications and Estimate •PUA – Possession and Use Agreement •ROW – Right-of-Way •RTC – Regional Transportation Council •RTL – Ready to Let (date project is clear for construction but lacks funding for actual let) •RTR – Regional Toll Revenue (funds resulting from certain toll/managed lane projects in DFW region) •RULIS – Right-of-Way, Utilities, Leasing, and Information System •STBG – Surface Transportation Block Grant •STIP – Statewide Transportation Improvement Program •SUE – Subsurface Utility Engineering •SW3P – Storm Water Pollution Prevention Plan •TCP – Traffic Control Plan •TIA – Time Impact Analysis •TPP – Transportation Planning and Programming •TPWD – Texas Parks & Wildlife Department •TTC – Texas Transportation Commission •TxDOT – Texas Department of Transportation •UTP – Unified Transportation Program •VE – Value Engineering Glossary of Acronyms 37 City of Denton Transportation Update Prepared by: January 2025 16 • CAT 1: Preventive Maintenance and Rehabilitation • CAT 2: Metro and Urban Area Corridor Projects / NCTCOG • CAT 3: Non-Traditionally Funded Transportation Projects • CAT 4: Statewide Connectivity Corridor Projects • CAT 5: Congestion Mitigation and Air Quality Improvement / NCTCOG • CAT 6: Structures Replacement and Rehabilitation (Bridge) • CAT 7: Metropolitan Mobility and Rehabilitation / NCTCOG • CAT 8: Safety Projects • CAT 9: Transportation Alternatives • CAT 10: Supplemental Transportation Projects • CAT 11: District Discretionary • CAT 12: Strategic Priority TxDOT Funding Categories 38 City of Denton Transportation Update Prepared by: January 2025 17 Denton City Limits 39 February 7, 2025 Report No. 2025-027 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: The two-minute pitch from Councilmember McGee on November 19, 2024: The City of Denton has already set aggressive goals to fight climate change locally such as considering the materials used in the construction of our roadways, to increasing our tree canopy goals, funding our Greensense program, moving toward capturing the excess gasses at the landfill and encouraging more infill development aimed at decreasing VMTs (vehicle miles traveled). This pitch is to allow staff the time to publish an ISR about changes that can be made in our code to increase the amount of renewable energy available and to make it easier for residents to own and charge EV’s at their chosen residence. Consideration of updates which could be made to the City’s adopted building codes requiring new single-family housing be built to be EV-Ready and Solar-Ready. EXECUTIVE SUMMARY: The code requirements for installation of solar-ready and Type 2 charger EV-ready construction are located in the appendix of the commercial and residential building codes. The current code requirements currently accommodate new residential construction as Type 1 EV-ready. Electric Vehicle (EV) Charging-Ready: Type 1 chargers are accommodated within the current residential building code. Each parking space in the garage is required to have an accessible GFCI protected 110v outlet. Most EV vehicles are sold with a Type 1 charging adapter. To prepare a home for Type 2 EV chargers (or an EV-ready system), the new construction to install EV ready would have an approximate cost impact of about $1500, paid for by the builder and passed along to the homeowner in the cost of the home. In the last 6 years, the city has issued 49 residential EV charger (Type 2) permits, 21 of those permits were issued this year. During this same period, the City has issued 6,425 permits for single-family detached homes. (of the permitted SFR 0.76 % of the permitted and 0.16% of the total 38,000 single-family housing stock) If adopted, the EV-ready homes would be required to be fitted with enough space in the electric panel to accommodate the extra voltage needed for Type 2 EV charger. As of October 2022, there were 600 registered electric cars in the city of Denton. As of December 3, 2024 the North Central Texas Council of Governments reported 1,195 registered EVs in the City of Denton out of 108,219 total registered vehicles (1.1% EV adoption rate). Solar-Ready To prepare a home for solar-ready in accordance with the code appendices, the home construction plans must show the solar-ready zone, indicate the roof loads and calculations, location of the solar-ready zone, the roof shall be oriented between 110 degrees and 270 degrees of true north or have low sloped roofs, shall reserve space in the electrical panel and provide a permanent certificate indicating the solar-ready zone and all other requirements of section Appendix NL (see attachments), posted near the panel, water heater or other. These specific requirements would not apply to all homes constructed in Denton due to the diverse designs of the homes being constructed and the various orientation of homes to the street. Today, the average cost for a solar install is around $18,000 according to the National Renewable Energy Laboratory (NREL). In 2024, the city issued 93 permits for new residential solar panels. Past years show 40 February 7, 2025 Report No. 2025-027 that solar installations peaked at 375 permits issued in 2022, and the city has issued between 80 and 250 permits per year since 2017. Solar panel installations currently account for less than 1% of the number of existing homes per year. BACKGROUND: October 18, 2022, ID 22-1282 City Council received a presentation by staff in response to CM Watts's request on June 7, 2022, to discuss incentives and or requirements for EV charging and infrastructure for single-family homes with garages and multifamily developments. Costs were discussed and it was indicated that it was minimal to make all new homes EV-Ready. Retrofit costs average of $1,500 per Type 2 EV charger for each home. In other communities such as in Colorado, the focus has been on EV-ready space for new single-family homes and requires some businesses to offer EV charging availability. After some discussion, the incentive approach was preferred to remove the cost burden. It was suggested that if a multifamily complex hits a certain size, EV could be required to be part of the required submittal. October 24, 2023, ID 23-937 City Council received a presentation by staff and the Sustainability Solutions Group discussing climate goals. That presentation showed that increasing Denton’s local renewable energy generation capacity to 192 MW by 2048 would result in 0.4% reduction in the community’s greenhouse gas (GHG) emissions. Additionally, electrifying personal and commercial vehicles by having 60% of new registrations by 2030 and 100% new registrations by 2050 would result in 56.7% reduction in the community’s GHG emissions. Council directed staff to revise the proposed Climate Action and Adaption Plan, to encourage decarbonization of the fleet and increase local, renewable energy generation capacity. August 6, 2024 City Council adopted the City of Denton’s Climate Action Plan (Resolution 24-1420) formalizing both actions. The Internal Revenue Service (IRS) has several tax credits and deductions available for individuals and businesses related to clean energy, EV, and EV charging infrastructure. On August 17, 2021, City Council via Ordinance 21-1689 established the Sustainability Framework Fund for sustainability initiatives. The Sustainability Framework Fund could incentivize both EV-Ready and Solar Roof-Ready. For FY 2024-25, purchasing Electric Vehicles is part of the Sustainability Framework Fund annual workplan. CONCLUSION: EV-Ready: The building code can be updated to require Type 2 EV charging and solar-ready. The appendices can be adopted and amendment of the requirements for permits to include the construction of EV-ready and solar-ready. One city that has done Type 2 EV-ready (minimally – add a 240v outlet in the garage) is San Antonio. They have not required the homes to be solar-ready. Based on the low number of registered EV vehicles and even lower number of Type 2 EV charging permits requested, it appears that the need for EV-ready (Type 2) installed in every new home is not substantiated at this time. The approximate cost increase to make EV-ready (Type 2) in a new home is $1,500.00 if a code mandate were enacted. Incentives are a better approach, since the city requires Type 1 EV charging abilities for new home construction and to keep housing affordable for our citizens. The incentive approach is preferred to remove the cost burden. It could be suggested that if a multifamily complex hits a certain size, a Type 2 or larger EV system could be required to be part of the construction submittal. Solar-Ready: 41 February 7, 2025 Report No. 2025-027 Based on the number of currently installed solar systems and that there have been no solar systems installed at the time of new construction, it appears that the need for solar-ready for every new home is not substantiated at this time. Additionally, it is important to note that not all homes are ideally oriented or ideally designed to install solar. The approximate cost increase to make solar-ready in a new home is $3,000.00, this includes the need for a specific design and the additional construction costs, if a mandate were to be enacted. There could be more costs incurred to the developer or builders that are unknown by staff. The incentive approach is preferred to remove the cost burden. It could be suggested that if a multifamily complex hits a certain size, solar-ready, or another renewable energy source could be required to be part of the construction submittal. Staff recommends utilizing the Health and Building Standards Commission to review a proposed code amendment before City Council consideration. . ATTACHMENTS: 1.Attachment 1 Appendix CG 2024 IECC 2.Attachment 2 Appendix RE 2024 IECC3.Attachment 3 Appendix CB 2024 IECC4.Attachment 4 Appendix RB 2024 IECC 5.Attachment 5 Resources STAFF CONTACT: Emily Loiselle Deputy Building Official Emily.Loiselle@cityofdenton.com (940)349-8536 REQUESTOR: Councilmember McGee STAFF TIME TO COMPLETE REPORT: 15 hours. PARTICIPATING DEPARTMENTS: Development Services, Environmental Services. 42 February 7, 2025 Report No. 2025-027 Attachment 1 Commercial Electric Vehicle Charging Infrastructure 2024 International Energy Conservation Code APPENDIX CG ELECTRIC VEHICLE CHARGING INFRASTRUCTURE The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. User notes: About this appendix: Appendix CG can be adopted by authorities having jurisdiction seeking electric vehicle charging infrastructure requirements. SECTION CG101 ELECTRIC VEHICLE POWER TRANSFER CG101.1 Definitions. AUTOMOBILE PARKING SPACE. A space within a building or private or public parking lot, exclusive of driveways, ramps, columns, office and work areas, for the parking of an automobile. ELECTRIC VEHICLE (EV). An automotive-type vehicle for on-road use, such as passenger automobiles, buses, trucks, vans, neighborhood electric vehicles and electric motorcycles, primarily powered by an electric motor that draws current from a building electrical service, electric vehicle supply equipment (EVSE), a rechargeable storage battery, a fuel cell, a photovoltaic array or another source of electric current. ELECTRIC VEHICLE CAPABLE SPACE (EV CAPABLE SPACE). A designated automobile parking space that is provided with electrical infrastructure such as, but not limited to, raceways, cables, electrical capacity, a panelboard or other electrical distribution equipment space necessary for the future installation of an EVSE ELECTRIC VEHICLE READY SPACE (EV READY SPACE). An automobile parking space that is provided with a branch circuit and an outlet, junction box or receptacle that will support an installed EVSE ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE). Equipment for plug-in power transfer, including ungrounded, grounded and equipment grounding conductors; electric vehicle connectors; attached plugs; any personal protection system; and all other fittings, devices, power outlets or apparatus installed specifically for the purpose of transferring energy between the premises wiring and the electric vehicle. ELECTRIC VEHICLE SUPPLY EQUIPMENT INSTALLED SPACE (EVSE SPACE). An automobile parking space that is provided with a dedicated EVSE connection. CG101.2 Electric vehicle power transfer infrastructure. Parking facilities shall be provided with electric vehicle power transfer infrastructure in accordance with Sections CG101.2.1 through CG101.2.6. CG101.2.1 Quantity. The number of required electric vehicle (EV) spaces, EV capable spaces and EV ready spaces shall be determined in accordance with this section and Table CG101.2.1 based on the total number of automobile parking spaces and shall be rounded up to the nearest whole number. For R-2 buildings, the Table CG101.2.1 requirements shall be based on the total number of dwelling units or the total number of automobile parking spaces, whichever is less. 1.Where more than one parking facility is provided on a building site, the number of required automobile parking spaces required to have EV power transfer infrastructure shall becalculated separately for each parking facility.2.Where one shared parking facility serves multiple building occupancies, the required number of spaces shall be determined proportionally based on the floor area of each building occupancy. 43 February 7, 2025 Report No. 2025-027 3.Installed electric vehicle supply equipment installed spaces (EVSE spaces) that exceed theminimum requirements of this section may be used to meet the minimum requirements for EV ready spaces and EV capable spaces.4.Installed EV ready spaces that exceed the minimum requirements of this section may be used tomeet the minimum requirements for EV capable spaces. 5.Where the number of EV ready spaces allocated for R-2 occupancies is equal to the numberof dwelling units or to the number of automobile parking spaces allocated to R-2 occupancies,whichever is less, requirements for EVSE spaces for R-2 occupancies shall not apply. 6.Requirements for a Group S-2 parking garage shall be determined by the occupancies served bythat parking garage. Where new automobile spaces do not serve specific occupancies, the valuesfor Group S-2 parking garage in Table CG101.2.1 shall be used.Exception: Parking facilities serving occupancies other than R2 with fewer than 10 automobile parking spaces. TABLE CG101.2.1 REQUIRED EV POWER TRANSFER INFRASTRUCTURE OCCUPANCY EVSE SPACES EV READY SPACES EV CAPABLE SPACES Group A 10% 0% 10% Group B 15% 0% 30% Group E 15% 0% 30% Group F 2% 0% 5% Group H 1% 0% 0% Group I 15% 0% 30% Group M 15% 0% 30% Group R-1 20% 5% 75% Group R-2 20% 5% 75% Groups R-3 and R-4 2% 0% 5% Group S exclusive of parking garages 1% 0% 0% Group S-2 parking garages 15% 0% 30% CG101.2.2 EV capable spaces. Each EV capable space used to meet the requirements of Section CG101.2.1 shall comply with the following: 1.A continuous raceway or cable assembly shall be installed between an enclosure or outlet locatedwithin 3 feet (914 mm) of the EV capable space and electrical distribution equipment.2.Installed raceway or cable assembly shall be sized and rated to supply a minimum circuit capacity in accordance with Section CG101.2.5.3.The electrical distribution equipment to which the raceway or cable assembly connects shall havededicated overcurrent protection device space and electrical capacity to supply a calculated load in accordance with Section CG101.2.5.4.The enclosure or outlet and the electrical distribution equipment directory shall be marked: “Forelectric vehicle supply equipment (EVSE).” CG101.2.3 EV ready spaces. 44 February 7, 2025 Report No. 2025-027 Each branch circuit serving EV ready spaces used to meet the requirements of Section CG101.2.1 shall comply with the following: 1.Terminate at an outlet or enclosure located within 3 feet (914 mm) of each EV ready space itserves.2.Have a minimum system and circuit capacity in accordance with Section CG101.2.5. 3.The electrical distribution equipment directory shall designate the branch circuit as “For electricvehicle supply equipment (EVSE)” and the outlet or enclosure shall be marked “For electricvehicle supply equipment (EVSE).” CG101.2.4 EVSE spaces. An installed EVSE with multiple output connections shall be permitted to serve multiple EVSE spaces. Each EVSE installed to meet the requirements of Section CG101.2.1, serving either a single EVSE space or multiple EVSE spaces, shall comply with the following: 1.Have a minimum system and circuit capacity in accordance with Section CG101.2.5.2.Have a nameplate rating not less than 6.2 kW.3.Be located within 3 feet (914 mm) of each EVSE space it serves. 4.Be installed in accordance with Section CG101.2.6. CG101.2.5 System and circuit capacity. The system and circuit capacity shall comply with Sections CG101.2.5.1 and CG101.2.5.2. CG101.2.5.1 System capacity. The electrical distribution equipment supplying the branch circuit(s) serving each EV capable space, EV ready space and EVSE space shall comply with one of the following: 1.Have a calculated load of 7.2 kVA or the nameplate rating of the equipment, whichever is larger,for each EV capable space, EV ready space and EVSE space. 2.Meets the requirements of Section CG101.2.5.3.1. CG101.2.5.2 Circuit capacity. The branch circuit serving each EV capable space, EV ready space and EVSE space shall comply with one of the following: 1.Have a rated capacity not less than 50 amperes or the nameplate rating of the equipment,whichever is larger.2.Meets the requirements of Section CG101.2.5.3.2. CG101.2.5.3 System and circuit capacity management. Where system and circuit capacity management is selected in Section CG101.2.5.1 or CG101.2.5.2, the installation shall comply with Sections CG101.2.5.3.1 and CG101.2.5.3.2. CG101.2.5.3.1 System capacity management. The maximum equipment load on the electrical distribution equipment supplying the branch circuits(s) serving EV capable spaces, EV ready spaces and EVSE spaces controlled by an energy management system shall be the maximum load permitted by the energy management system, but not less than 3.3 kVA per space. CG101.2.5.3.2 Circuit capacity management. Each branch circuit serving multiple EVSE spaces, EV ready spaces or EV capable spaces controlled by an energy management system shall comply with one of the following: 1.Have a minimum capacity of 25 amperes per space.2.Have a minimum capacity of 20 amperes per space for R-2 occupancies where all automobileparking spaces are EV ready spaces or EVSE spaces. 45 February 7, 2025 Report No. 2025-027 CG101.2.6 EVSE installation. EVSE shall be installed in accordance with NFPA 70 and shall be listed and labeled in accordance with UL 2202 or UL 2594. EVSE shall be accessible in accordance with Section 1107 of the International Building Code. SECTION CG102 REFERENCED STANDARDS CG102.1 General. See Table CG102.1 for standards that are referenced in various sections of this appendix. Standards are listed by the standard identification with the effective date, standard title, and the section or sections of this appendix that reference the standard. TABLE CG102.1 REFERENCED STANDARDS STANDARD ACRONYM STANDARD NAME SECTIONS HEREIN REFERENCED UL 2202—2009 Electric Vehicle (EV) Charging System—with revisions through February 2018 CG101.2.6 UL 2594—2016 Standard for Electric Vehicle Supply Equipment CG101.2.6 Attachment 2 Residential Electric Vehicle Charging Infrastructure 2024 International Energy Conservation Code APPENDIX RE ELECTRIC VEHICLE CHARGING INFRASTRUCTURE The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. About this appendix: This appendix provides requirements for electric vehicle charging infrastructure for adopting jurisdictions. SECTION RE101 ELECTRIC VEHICLE POWER TRANSFER RE101.1 Definitions. AUTOMOBILE PARKING SPACE. A space within a building or private or public parking lot, exclusive of driveways, ramps, columns, office and work areas, for the parking of an automobile. ELECTRIC VEHICLE (EV). An automotive-type vehicle for on-road use, such as passenger automobiles, buses, trucks, vans, neighborhood electric vehicles and electric motorcycles, primarily powered by an electric motor that draws current from a building electrical service, electric vehicle supply equipment (EVSE), a rechargeable storage battery, a fuel cell, a photovoltaic array or another source of electric current. ELECTRIC VEHICLE CAPABLE SPACE (EV CAPABLE SPACE).A designated automobile parking space that is provided with electrical infrastructure such as, but not limited to, raceways, cables, electrical capacity, a panelboard or other electrical distribution equipment space necessary for the future installation of an EVSE. ELECTRIC VEHICLE READY SPACE (EV READY SPACE).An automobile parking space that is provided with a branch circuit and an outlet, junction box or receptacle that will support an installed EVSE. ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE). Equipment for plug-in power transfer, including ungrounded, grounded and equipment grounding conductors; electric vehicle connectors; attached plugs; any personal protection system; and all other fittings, devices, power outlets or apparatus installed specifically for the purpose of transferring energy between the premises wiring and the electric vehicle. ELECTRIC VEHICLE SUPPLY EQUIPMENT INSTALLED SPACE (EVSE SPACE). An automobile parking space that is provided with a dedicated EVSE connection. 46 February 7, 2025 Report No. 2025-027 RE101.2 Electric vehicle power transfer infrastructure. New residential automobile parking spaces for residential buildings shall be provided with electric vehicle power transfer infrastructure in accordance with Sections RE101.2.1 through RE101.2.5. RE101.2.1 Quantity. New one- and two-family dwellings and townhouses with a designated attached or detached garage or other on-site private parking provided adjacent to the dwelling units shall be provided with one EV capable, EV ready or EVSE space per dwelling unit. R-2 occupancies or allocated parking for R-2 occupancies in mixed-use buildings shall be provided with an EV capable space, EV ready space or EVSE space for 40 percent of the dwelling units or automobile parking spaces, whichever is less. Exceptions: 1.Where the local electric distribution entity certifies in writing that it is not able to provide 100percent of the necessary distribution capacity within 2 years after the estimated certificate ofoccupancy date, the required EV charging infrastructure shall be reduced based on the available existing electric distribution capacity. 2.Where substantiation is approved meeting the requirements of Section RE101.2.5 will alter the local utility infrastructure design requirements on the utility side of the meter so as to increasethe utility side cost to the builder or developer by more than $450 per dwelling unit. RE101.2.2 EV capable spaces. Each EV capable space used to meet the requirements of Section RE101.2.1 shall comply with all of the following: 1.A continuous raceway or cable assembly shall be installed between a suitable panelboard or otheron-site electrical distribution equipment and an enclosure or outlet located within 6 feet (1828mm)of the EV capable space. 2.The installed raceway or cable assembly shall be sized and rated to supply a minimum circuitcapacity in accordance with Section RE101.2.5.3.The electrical distribution equipment to which the raceway or cable assembly connects shall have sufficient dedicated space and spare electrical capacity for a two-pole circuit breaker or set offuses. 4.The electrical enclosure or outlet and the electrical distribution equipment directory shall bemarked: “For future electric vehicle supply equipment (EVSE).” RE101.2.3 EV ready spaces. Each branch circuit serving EV ready spaces shall comply with all of the following: 1.Termination at an outlet or enclosure, located within 6 feet (1828 mm) of each EV ready space itserves and marked “For electric vehicle supply equipment (EVSE).”2.Service by an electrical distribution system and circuit capacity in accordance with Section RE101.2.5.3.Designation on the panelboard or other electrical distribution equipment directory as “For electricvehicle supply equipment (EVSE).” RE101.2.4 EVSE spaces. An installed EVSE with multiple output connections shall be permitted to serve multiple EVSE spaces. Each EVSE serving either a single EVSE space or multiple EVSE spaces shall comply with the following: 1.Be served by an electrical distribution system in accordance with Section RE101.2.5.2.Have a nameplate charging capacity of not less than 6.2 kVA (or 30A at 208/240V)per EVSE space served. Where an EVSE serves three or more EVSE spaces and is controlled byan energy management system in accordance with Section RE101.2.5, the nameplate charging capacity shall be not less than 2.1 kVA per EVSE space served. 47 February 7, 2025 Report No. 2025-027 3.Be located within 6 feet (1828 mm) of each EVSE space it serves.4.Be installed in accordance with NFPA 70 and be listed and labeled in accordance with UL 2202 or UL 2594. RE101.2.5 Electrical distribution system capacity. The branch circuits and electrical distribution system serving each EV capable space, EV ready space and EVSE space used to comply with Section RE101.2.1 shall comply with one of the following: 1.Sized for a calculated EV charging load of not less than 6.2 kVA per EVSE, EV ready or EV capable space. Where a circuit is shared or managed, it shall be in accordance with NFPA 70.2.The capacity of the electrical distribution system and each branch circuit serving multiple EVSEspaces, EV ready spaces or EV capable spaces designed to be controlled by an energymanagement system in accordance with NFPA 70 shall be sized for a calculated EV charging load of not less than 2.1 kVA per space. Where an energy management system is used to control EV charging loads for the purposes of this section, it shall not be configured to turn off electrical power to EVSE or EV ready spaces used to comply with Section RE101.2.1. SECTION RE102 REFERENCED STANDARDS RE102.1 General. See Table RE102.1 for standards that are referenced in various sections of this appendix. Standards are listed by the standard identification with the effective date, standard title, and the section or sections of this appendix that reference the standard. TABLE RE102.1 REFERENCED STANDARDS STANDARD ACRONYM STANDARD NAME SECTIONS HEREIN REFERENCED UL 2202—2009 Electric Vehicle (EV) Charging System Equipment—with revisions through February 2018 RE101.2.4 UL 2594—2016 Standard for Electric Vehicle Supply Equipment RE101.2.4 48 February 7, 2025 Report No. 2025-027 Attachment 3 Commercial Solar-ready Zone 2024 International Energy Conservation Code APPENDIX CB SOLAR-READY ZONE—COMMERCIAL The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. About this appendix: Appendix CB is intended to encourage the installation of renewable energy systems by preparing buildings for the future installation of solar energy equipment, piping and wiring. SECTION CB101 SCOPE CB101.1 General. These provisions shall be applicable for new construction where solar-ready provisions are required. SECTION CB102 GENERAL DEFINITION SOLAR-READY ZONE. A section or sections of the roof or building overhang designated and reserved for the future installation of a solar photovoltaic or solar thermal system. SECTION CB103 SOLAR-READY ZONE CB103.1 General. A solar-ready zone shall be located on the roof of buildings that are five stories or less in height above grade plane, and are oriented between 110 degrees and 270 degrees of true north or have low slope roofs. Solar-ready zones shall comply with Sections CB103.2 through CB103.8. Exceptions: 1.1.A building with a permanently installed, on-site renewable energy system.2.2.A building with a solar-ready zone that is shaded for more than 70 percent of daylight hours annually.3.3.A building where the licensed design professional certifies that the incident solar radiationavailable to the building is not suitable for a solar-ready zone. 4.4.A building where the licensed design professional certifies that the solar zone area requiredby Section CB103.3 cannot be met because of extensive rooftop equipment,skylights, vegetative roof areas or other obstructions. CB103.2 Construction document requirements for a solar-ready zone. Construction documents shall indicate the solar-ready zone. CB103.3 Solar-ready zone area. The total solar-ready zone area shall be not less than 40 percent of the roof area calculated as the horizontally projected gross roof area less the area covered by skylights, occupied roof decks, vegetative roof areas and mandatory access or set back areas as required by the International Fire Code. The solar- ready zone shall be a single area or smaller, separated sub-zone areas. Each sub-zone shall be not less than 5 feet (1524 mm) in width in the narrowest dimension. CB103.4 Obstructions. Solar-ready zones shall be free from obstructions, including pipes, vents, ducts, HVAC equipment, skylights and roof-mounted equipment. CB103.5 Roof loads and documentation. 49 February 7, 2025 Report No. 2025-027 A collateral dead load of not less than 5 pounds per square foot (5 psf) (24.41 kg/m2) shall be included in the gravity and lateral design calculations for the solar-ready zone. The structural design loads for roof dead load and roof live load shall be indicated on the construction documents. CB103.6 Interconnection pathway. Construction documents shall indicate pathways for routing of conduit or piping from the solar-ready zone to the electrical service panel or service hot water system. CB103.7 Electrical service reserved space. The main electrical service panel shall have a reserved space to allow installation of a dual-pole circuit breaker for future solar electric and shall be labeled “For Future Solar Electric.” The reserved spaces shall be positioned at the end of the panel that is opposite from the panel supply conductor connection. CB103.8 Construction documentation certificate. A permanent certificate, indicating the solar-ready zone and other requirements of this section, shall be posted near the electrical distribution panel, water heater or other conspicuous location by the builder or registered design professional. 50 February 7, 2025 Report No. 2025-027 Attachment 4 Residential Solar-Ready Provisions 2024 International Energy Conservation Code APPENDIX RB SOLAR-READY PROVISIONS—DETACHED ONE- AND TWO-FAMILY DWELLINGS AND TOWNHOUSES The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. About this appendix: Harnessing the heat or radiation from the sun’s rays is a method to reduce the energy consumption of a building. Although Appendix RB does not require solar systems to be installed for a building, it does require the space(s) for installing such systems, providing pathways for connections and requiring adequate structural capacity of roof systems to support the systems. SECTION RB101 SCOPE RB101.1 General. These provisions shall be applicable for new construction where solar-ready provisions are required. SECTION RB102 GENERAL DEFINITION SOLAR-READY ZONE. A section or sections of the roof or building overhang designated and reserved for the future installation of a solar photovoltaic or solar thermal system. SECTION RB103 SOLAR-READY ZONE RB103.1 General. New detached one- and two-family dwellings, and townhouses with not less than 600 square feet (55.74 m2) of roof area oriented between 110 degrees and 270 degrees of true north shall comply with Sections RB103.2 through RB103.8. Exceptions: 1.New residential buildings with a permanently installed on-site renewable energy system. 2.A building where all areas of the roof that would otherwise meet the requirements of SectionRB103 are in full or partial shade for more than 70 percent of daylight hours annually. RB103.2 Construction document requirements for solar-ready zone. Construction documents shall indicate the solar-ready zone. RB103.3 Solar-ready zone area. The total solar-ready zone area shall be not less than 300 square feet (27.87 m2) exclusive of mandatory access or setback areas as required by the International Fire Code. New townhouses three stories or less in height above grade plane and with a total floor area less than or equal to 2,000 square feet (185.8 m2) per dwelling shall have a solar-ready zone area of not less than 150 square feet (13.94 m2). The solar-ready zone shall be composed of areas not less than 5 feet (1524 mm) in width and not less than 80 square feet (7.44 m2) exclusive of access or setback areas as required by the International Fire Code. RB103.4 Obstructions. Solar-ready zones shall be free from obstructions, including but not limited to vents, chimneys, and roof-mounted equipment. RB103.5 Shading. The solar-ready zone shall be set back from any existing or new permanently affixed object on the building or site that is located south, east or west of the solar zone a distance not less than two times the object’s height above the nearest point on the roof surface. Such objects include, but are not limited 51 February 7, 2025 Report No. 2025-027 to, taller portions of the building itself, parapets, chimneys, antennas, signage, rooftop equipment, trees and roof plantings. RB103.6 Capped roof penetration sleeve. A capped roof penetration sleeve shall be provided adjacent to a solar-ready zone located on a roof slope of not greater than 1 unit vertical in 12 units horizontal (8-percent slope). The capped roof penetration sleeve shall be sized to accommodate the future photovoltaic system conduit, but shall have an inside diameter of not less than 11/4 inches (32 mm). RB103.7 Roof load documentation. The structural design loads for roof dead load and roof live load shall be clearly indicated on the construction documents. RB103.8 Interconnection pathway. Construction documents shall indicate pathways for routing of conduit or plumbing from the solar-ready zone to the electrical service panel or service hot water system. RB103.9 Electrical service reserved space. The main electrical service panel shall have a reserved space to allow installation of a dual pole circuit breaker for future solar electric installation and shall be labeled “For Future Solar Electric.” The reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location. RB103.10 Construction documentation certificate. A permanent certificate, indicating the solar-ready zone and other requirements of this section, shall be posted near the electrical distribution panel, water heater or other conspicuous location by the builder or registered design professional. COPYRIGHT © 2024 INTERNATIONAL CODE COUNCIL, INC 52 February 7, 2025 Report No. 2025-027 Attachment 5 Resources: U.S. Department of Energy (Efficiency and Renewable Energy - EERE) National Renewable Energy Laboratory (NREL) North Central Texas Council of Governments (NTCOG) Internal Revenue Service (IRS) International Code Council (ICC) City Council Archives Other staff utilized: Michael Gange, Director of Environmental Services and Sustainability Scott McDonald, Director of Development Services/Building Official Thomas Rotter, Journeyman Electrician, Building Inspector III 53 54 Friday Report - Council RequestsSummary of RequestCouncil Member Requestor Date Received Staff AssignedDepartmentCommentsStatus1Traffic Safety Audit at Circle at Kayewoodand GreenwoodCouncil Member Beck01/29/25Farhan ButtPublic Works-TrafficStaff anticipate study to becompleted by 2/20/25.2Wildlife nuisanceCouncil Member Beck01/26/25Gary PackanParksStaff is researching.3Mental Health / Law EnforcementResponse to HomelessnessCouncil Member Byrd01/22/25CMO Community ServicesStaff is gatheringinformation.4Damaged Irrigation PipeCouncil Member Holland01/13/25Sara BonehillRisk ManagementStaff reviewed videofootage. Awaitingadditional photos to reviewbefore final determination.5Request for Road Safety Audit forUniversity Drive and Malone StreetCouncil Member Beck CouncilMember Byrd Mayor HudspethCouncil Member McGee CouncilMember Holland Mayor Pro TemMeltzer Council Member Jester01/02/25Farhan ButtPublic Works-TrafficStaff anticipate the reportwill be complete by2/21/25.6FINDHELP websiteCouncil Member Beck02/06/25Jesse KentCommunity ServicesStaff updated CM.7Utility Meter ReadersCouncil Member Beck02/05/25Antonio PuenteDMEStaff updated CM andhave corrected the uniformissue with the meterreader.8Lawn Waste BinCouncil Member Beck02/03/25Brian BoernerSolid WasteStaff updated CM on binremovall.9Fire Engine CrashCouncil Member Holland02/03/25Kenneth HedgesFireStaff updated CM. Enginewill undergo repairs herelocally.10Sons of American Revolution Selling Water Council Member Holland02/03/25Gary PackanParksStaff updated CM.Theorganization needs toobtain a Solicitor andItinerant Merchant Permit.Page 1 of 1Exported on February 7, 2025 7:50:33 AM PST55 Meeting Calendar City of Denton City Hall 215 E. McKinney St. Denton, Texas 76201 www.cityofdenton.com Criteria : Begin Date: 2/10/2025, End Date: 5/16/2025 Date Time Meeting LocationMeeting Body February 2025 2/10/2025 9:00 AM Public Utilities Board Council Work Session Room 2/10/2025 3:00 PM Development Code Review Committee Development Services Center 2/10/2025 5:30 PM Board of Ethics Council Work Session Room 2/10/2025 5:30 PM Historic Landmark Commission Development Service Center 2/10/2025 5:30 PM Library Board Emily Fowler Central Library 2/12/2025 11:00 AM Economic Development Partnership Board Development Service Center 2/12/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 2/12/2025 4:00 PM Planning and Zoning Commission Council Work Session Room 2/12/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 2/13/2025 3:00 PM Health & Building Standards Commission Development Service Center 2/18/2025 3:00 PM City Council Council Work Session Room & Council Chambers 2/21/2025 9:00 AM Community Partnership Committee Council Work Session Room 2/21/2025 12:00 PM Community Services Advisory Committee Development Service Center 2/21/2025 1:00 PM Bond Oversight Committee Development Service Center 2/24/2025 9:00 AM Public Utilities Board Council Work Session Room 2/24/2025 3:00 PM Development Code Review Committee Development Services Center 2/24/2025 5:30 PM Zoning Board of Adjustment Development Service Center 2/26/2025 10:00 AM Mobility Committee Council Work Session Room 2/26/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 2/28/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room Page 1City of Denton Printed on 2/6/202556 Date Time Meeting LocationMeeting Body Meeting Calendar continued... March 2025 3/3/2025 5:30 PM Historic Landmark Commission Development Service Center 3/3/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 3/4/2025 2:00 PM City Council Council Work Session Room & Council Chambers 3/6/2025 8:00 AM Agenda Committee Council Work Session Room 3/10/2025 9:00 AM Public Utilities Board Council Work Session Room 3/10/2025 3:00 PM Development Code Review Committee Development Services Center 3/10/2025 5:30 PM Board of Ethics Council Work Session Room 3/10/2025 5:30 PM Library Board North Branch Library 3/12/2025 10:00 AM Animal Shelter Advisory Committee Animal Services Training Room 3/12/2025 11:00 AM Economic Development Partnership Board Development Service Center Training Rooms 3/12/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 3/13/2025 3:00 PM Health & Building Standards Commission Development Service Center 3/19/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 3/24/2025 9:00 AM Public Utilities Board Council Work Session Room 3/24/2025 3:00 PM Development Code Review Committee Development Services Center 3/24/2025 5:30 PM Zoning Board of Adjustment Development Service Center 3/25/2025 2:00 PM City Council Council Work Session Room & Council Chambers 3/26/2025 10:00 AM Mobility Committee Council Work Session Room 3/26/2025 12:00 PM Tax Increment Reinvestment Zone Number One Board Development Service Center 3/28/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room April 2025 4/1/2025 11:00 AM City Council Council Work Session Room & Council Chambers 4/1/2025 2:00 PM City Council Council Work Session Room & Council Chambers Page 2City of Denton Printed on 2/6/2025 57 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 4/3/2025 8:00 AM Agenda Committee Council Work Session Room 4/3/2025 8:30 AM Downtown Economic Development Committee Development Service Center 4/3/2025 4:00 PM Public Art Committee Civic Center Community Room 4/7/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 4/9/2025 11:00 AM Economic Development Partnership Board Development Service Center 4/9/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 4/9/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 4/10/2025 3:00 PM Health & Building Standards Commission Development Service Center 4/14/2025 9:00 AM Public Utilities Board Council Work Session Room 4/14/2025 3:00 PM Development Code Review Committee Development Services Center 4/14/2025 5:30 PM Board of Ethics Council Work Session Room 4/14/2025 5:30 PM Historic Landmark Commission Development Service Center 4/14/2025 5:30 PM Library Board South Branch Library 4/15/2025 2:00 PM City Council Council Work Session Room & Council Chambers 4/23/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 4/25/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room 4/28/2025 9:00 AM Public Utilities Board Council Work Session Room 4/28/2025 3:00 PM Development Code Review Committee Development Services Center 4/28/2025 5:30 PM Zoning Board of Adjustment Development Service Center 4/30/2025 10:00 AM Mobility Committee Council Work Session Room May 2025 5/1/2025 8:00 AM Agenda Committee Council Work Session Room 5/1/2025 4:00 PM Public Art Committee Council Work Session Room 5/5/2025 9:00 AM Public Utilities Board Council Work Session Room 5/5/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room Page 3City of Denton Printed on 2/6/2025 58 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 5/6/2025 2:00 PM City Council Council Work Session Room & Council Chambers 5/8/2025 3:00 PM Health & Building Standards Commission Development Service Center 5/12/2025 3:00 PM Development Code Review Committee Development Services Center 5/12/2025 5:30 PM Board of Ethics Council Work Session Room 5/12/2025 5:30 PM Historic Landmark Commission Development Service Center 5/12/2025 5:30 PM Library Board Emily Fowler Central Library 5/13/2025 12:00 PM City Council Council Work Session Room & Council Chambers 5/14/2025 10:00 AM Animal Shelter Advisory Committee Animal Services Training Room 5/14/2025 11:00 AM Economic Development Partnership Board Development Service Center Training Rooms 5/14/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 5/14/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 5/16/2025 1:00 PM Bond Oversight Committee Development Service Center Page 4City of Denton Printed on 2/6/202559 Meeting Date Item Legistar ID Departments Involved Type Estimated Time A. Halloween Update 25-083 Parks and Rec City Business 0:30 B. Ambassador Program Update 24-2478 Community Services City Business 0:30 C. Two Minute Pitch:25-020 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Council Appointed Mid-Year Perfomance Reviews: City Manager and Municipal Judge Legal (if any)City Business 2:00 Total Est. Time: 3:30 Other Major Items for Meeting: A. Ethics Proposed Amendments 25-300 Internal Audit City Business 1:00 B. State Legislative Session Update 25-299 City Manager's Office City Business 0:30 C. Use of Evers Property TBD Parks and Recreation City Business 0:30 D. Two Minute Pitch:25-021 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Council Appointed Position Mid-Year Performance Reviews: City Auditor and City Attorney; Legal (if any)City Business 1:30 Total Est. Time: 4:00 Other Major Items for Meeting: A. Community Shelter Update TBD City Manager's Office City Business TBD B. Water & Wastewater Resource Planning TBD Water/City Manager's Office City Business 1:00 C. Overview and Updates - Solid Waste and Recycling Department 24-2603 Solid Waste City Business 0:45 D. Annual Comprehensive Financial Report 24-258 City Manager's Office City Business 0:30 E. Two Minute Pitch:25-022 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:15 Other Major Items for Meeting: Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 0:30 Other Major Items for Meeting: A. Denton Police Department Annual Update and 2024 Annual Report 25-151 Police Department City Business 0:45 B. Homelessness Initiative Update Part 2 24-2043 City Manager's Office City Business 1:00 C. Financial Policy Discussion 25-241 Finance City Business 1:00 D. Two Minute Pitch:25-023 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:45 Other Major Items for Meeting: A. Food Trucks TBD City Manager's Office City Business 1:00 B. Denton Renewable Resource Plan 24-1910 Denton Municipal Electric City Business 0:30 C. Expiring Incentives TBD Economic Development Council Request 0:30 D. Remote Participation for P&Z TBD Marketing and Communications Council Request 0:30 E. Two Minute Pitch:25-024 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:30 Other Major Items for Meeting: A. Two Minute Pitch:25-025 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 1:00 Other Major Items for Meeting: Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 0:30 Other Major Items for Meeting: A. Animal Services Euthanasia Policy and Schedule of Fees TBD Animal Services City Business 1:00 B. Two Minute Pitch:25-026 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 2:00 Other Major Items for Meeting: A. Two Minute Pitch:25-027 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 1:00 Other Major Items for Meeting: Audit of Park Management & Planning (30 min.)24-255 Internal Audit City Business TBD Leak Adjustment Ordinance 24-1632 Water Utilities City Business TBD Item Dates Departments Type Estimated Work Item Date Approved Department Next Step Requestor Vote Centers 10/17/2023 City Secretary's Office Work Session after Conclusion of State Leg Session CM McGee Election Day Holiday 6/18/2024 Human Resources Budget Process CM McGee Board of Ethics develop guidance for interactions with external partners 6/18/2024 Internal Audit Work Session CM Beck Campaign Finance 9/17/2024 Internal Audit Budget Process CM McGee Amending master plans to renovate Civic Center Pool 10/15/2024 Parks & Recreation Informal Staff Report CM Beck Increasing tree canopy 10/15/2024 Parks & Recreation Committee on the Environment & Parks and Rec Board CM McGee Changes to the building code to make new homes EV and solar ready 11/19/2024 Development Services Informal Staff Report CM McGee Catalyst Fund 11/19/2024 Economic Development Economic Development Partnership Board CM Jester Rooftop and wall gardens and solar panels on City buildings 12/3/2024 Facilities Management Informal Staff Report CM Beck Remote attendance for Planning and Zoning Commissioners 1/7/2025 Marketing and Communications Work Session Meltzer June 3 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) April 15 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) April 1 Joint Meeting with Denton ISD (@11:00 a.m.) April 1 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) February 18 Work Session (@3:00 p.m.) Regular Called Meeting (@6:30 p.m.) March 4 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) Council Priorities and Significant Work Plan Items to be Scheduled Approved Council Pitches to be Scheduled Work Session To Be Determined May 6 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) May 13 Special Called Meeting - Canvassing (@12:00 p.m.) May 20 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) March 25 Work Session (@2:00 p.m.) Special Called Meeting (Upon conclusion of the Work Session) Tentative Work Session Topics and Meeting Information Updated: February 7, 2025 *This is for planning purposes only. Dates are subject to change.60 1 Street Closure Report: Upcoming ClosuresSCR Feb 10th - 16thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Lake Side CtLake Country DrCul v Sac03/03/25 04/11/25 Sidewalk RepairStreetsRoy San MiguelLane Closure2Precision DrAirport RdUNT Library Annex04/01/25 07/31/25 ReconstructionEngineering OtherGio PineiroFull Closure3Spur CtLake Country DrCul v Sac03/03/25 04/11/25 Sidewalk RepairStreetsRoy San MiguelLane ClosureExported on February 7, 2025 11:42:25 AM CST61 2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Aileen StPanhandle StBroadway St09/27/24 02/28/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure2Audra LnStockton StMockingbird Ln07/29/24 05/09/25 Connection new storm drainageto existing City of Dentondrainage.Private DevelopmentZabdiel MotaLane Closure3Ave ACollins StEagle Dr10/08/24 03/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure4Ave AEagle DrHighland St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure5Ave BFannin StMargie St11/22/24 02/28/25 Pavement replacement EngineeringScott FettigFull Closure6Ave CEagle DrHighland St08/26/24 03/01/25 Pavement replacement. EngineeringScott FettigFull Closure7Bernard StLindsey StFannin St08/26/24 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure8Bonnie Brae StBirch Grove BendVintage Blvd01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterLane Closure9Bonnie Brae StFM1515Walt Parker Dr01/06/25 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure10Bonnie Brae St NOak StHickory St02/10/25 02/17/25 Concrete poles install on thatcorner for DMEPublic Works Inspections John, CantuLane Closure11Clover LnRobinwood LnGlenwood Ln11/12/24 05/18/25 Full Road Reconstruction EngineeringSheldon GatewoodFull Closure12Collins StAve ABernard St08/26/24 02/28/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure13Congress St.Ponder Ave.Coit St.02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure14Crescent StCarroll BlvdBolivar St01/24/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure15Dunes StDunes Ct@ Intersection01/27/25 02/14/25 Removing asphalt and placingvalley gutter in the easternportion of the intersection onDunes StEngineeringTaylor HoltFull Closure16Eagle DrBeatty StCentral Ave11/25/24 02/14/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure17Emerald Trace DrShagbank DrRidgehurst Ln01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterFull Closure18Emery StAlice StDead End (West of Fulton)02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure19Evening Wind RdBishop Pine RdDessert Willow01/13/25 03/14/25 Concrete Panels and SideWalkRepairStreetsRoy San MiguelLane Closure20Fannin StAve AAve B12/09/24 02/14/25 Storm Drain being installed Public Works Inspections Collin ColeLane Closure21Fulton StCordell StEmery St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure22Hickory Creek RdRiverpass DrFM 183003/13/23 12/31/25 Bridge InstallationEngineeringTracy BeckFull Closure23Hidden Path Ln (7808)White Dove LnMontecito Dr01/27/25 03/07/25 Concrete Panel and SidewalkRepairStreetsRoy San MiguelLane Closure24Hillcrest StPanhandle StCrescent St12/27/23 02/28/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure25Houston PlThomas StBradley St09/27/24 02/28/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure26Kenwood StWilderness StFox Hollow11/18/24 03/28/25 Reconstruction of the road curband gutter mill subgradestabilizationStreetsJesus RodriguezFull Closure27Margie StAve AAve B11/01/24 02/28/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure28Marietta StOak St WScripture St09/27/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure29Morse StLoop 288Mayhill Rd12/02/24 06/27/25 Water Line Replacement andRoad ReconstructionPublic Works InspectionsStreets WaterKristine StewartLane Closure30Mulberry StWelch StBernard St11/29/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure31Nautical LnHickory Creek RdOcean Dr01/02/25 02/28/25 Water and Storm line tie ins Private DevelopmentGavin PetnerLane Closure32Ocean DrAtlantic DrNautical Ln01/02/25 02/28/25 Sanitary Sewer installPrivate DevelopmentGavin PetnerFull Closure33Panhandle StEctor StAileen St09/27/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure Exported on February 7, 2025 11:42:59 AM CST62 Street/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type34Ridgehurst LnBonnie Brae StEmerald Trace Dr01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterFull Closure35Robinwood LnLive OakKayewood Dr01/27/25 02/28/25 Road reconstruction (Millingand C/G Removal, Stabilization)EngineeringSheldon GatewoodFull Closure36Robinwood LnEmerson LnLive Oak St11/12/24 05/16/25 Full Road Reconstruction EngineeringSheldon GatewoodFull Closure37Shagbank DrHomebeam StEmerald Trace Dr01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterFull Closure38Sunset StUniversity Dr WAnna St01/20/25 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure39Texas stBell AveOakland St02/08/25 02/12/25 Driver pipeline replacing valleygutterPublic Works Inspections Alexander CervantesFull Closure40Thomas StPanhandle StEmery St10/11/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure41Unicorn Lake BlvdState School RdWind River Ln12/17/24 02/28/25 Water and Sanitary Sewer tieinsPrivate DevelopmentGavin PetnerLane Closure42Welch StHighland StHickory St08/26/24 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure43Welch StChestnut StMulberry St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure44Welch St SEagle DrHickory St06/03/24 05/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure45Westway StAnna StBolivar St01/24/25 05/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure46Willowwood StWestwood DrLeslie St01/16/25 02/28/25 Sanitary sewer, water andstorm sewer installPrivate DevelopmentGavin PetnerLane Closure Exported on February 7, 2025 11:42:59 AM CST63 3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Club View DrCreek View CtClub View Ct12/09/24 01/10/25 Street Panel and SidewalkRepairStreetsRoy San MiguelLane Closure2Desert Willow DrSilktree Ct@ Intersection01/13/25 02/06/25 Sidewalk and ADA Repair StreetsRoy San MiguelLane Closure3Harvest Hill DrWaldorf DrHarvest Glen Dr01/06/25 01/17/25 Sidewalk RepairStreetsRoy San MiguelLane Closure4Hickory St WFry StWelch St S12/04/24 01/14/25 Metal flashing and masonryreplacementOtherAlexander CervantesLane Closure5Mockingbird LnHoward CtLance Ln01/06/25 02/07/25 Sidewalk and ADA repair StreetsRoy San MiguelLane Closure6Pickwick LnOxford Lane@ Intersection01/27/25 01/31/25 Removing asphalt and placingvalley gutter in the easternportion of the intersection onPickwick Ln.EngineeringTaylor HoltFull Closure7Ryan RdCountry Club RdMontecito Dr01/17/25 01/24/25 Hydroexcavation of existingutilitiesPublic Works Inspections Caitlin BrownRolling Closure8Smith StHill StDuncan St12/11/24 01/27/25 Manhole Installation in thestreet and water tapsPublic Works Inspections Tasheba JonesLane Closure Exported on February 7, 2025 11:43:26 AM CST64