Loading...
2025/02/14 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 17th - 23rd Streett Intersection From To Closure Start �Description Department Date Audra Ln Stockton St Mockingbird Ln 02/24/25 03/21/25 Paving new addition street lane on Audra Lane Private Development Public Zabdiel Mots Lane Closure 1 and replacing street panel on existing roadway Works Inspections where 8-inch water tap was performed. 2 Lake Side Ct Lake Country Dr Cul v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 3 Pinto Or(2820) Paint Dr at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Repair Streets Roy San Miguel Lane Closure 4 Precision Dr Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pinsiro Full Closure 5 Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 04/19/25 Contractor to install 12-inch waterline to provide Engineering Jesus Perez Full Closure water to the new DISD elementary school 6 Spur Ct Lake Country Dr Cul v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy an Miguel Lane Closure Exported on February 14,2025 11:32:45 AM CST 2 Street Closure Report: Current Closures smartsheet sure End Description Department Department Date 1 Aileen St Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure 2 to existing City of Denton drainage. 3 Ave A Collins St Eagle or 10/08/24 03/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 4 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 5 Ave B Fannin St Margie St 11/22/24 02/28/25 Pavement replacement Engineering Scott Fettig Full Closure 6 Ave C Eagle or Highland St 08/26/24 03/01/25 Pavement replacement. Engineering Scott Fettig Full Closure 7 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 8 Bonnie Brae St Birch Grove Bend Vintage Blvd 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Lane Closure infrastructure installation 9 Bonnie Brae St FM1515 Walt Parker or 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Bonnie Brae St N Oak St Hickory St 02/10/25 02/21/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure corner for DME 11 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 12 Collins St Ave A Bernard St 08/26/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Congress St. Ponder Ave. Coit St. 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 14 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 15 Duncan St Smith St Kerley St 02/21/25 03/07/25 Water Utility Line Repairs Public Works Inspections Kirk Winter Lane Closure 16 Eagle or Central Ave Ave A 02/17/25 02/21/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 17 Emerald Trace or Shagbank or Ridgehurst Ln 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 18 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 19 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/14/25 Concrete Panels and SideWalk Streets Roy San Miguel Lane Closure Repair 20 Fannin St Ave A Ave B 12/09/24 02/28/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure 21 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 22 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 23 Hidden Path Ln(7808) White Dove Ln Montecito or 01/27/25 03/07/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 24 Hill St Smith St Mill St 02/21/25 03/14/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure 25 Hillcrest St Panhandle St Crescent St 12/27/23 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Houston PI Thomas St Bradley St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure 27 and gutter mill subgrade stabilization 28 Margie St Ave A Ave B 11/01/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 29 Marietta St Oak St W Scripture St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 30 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 31 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 32 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 02/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 33 Ocean or Atlantic or Nautical Ln 01/02/25 02/28/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 34 Panhandle St Ector St Aileen St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on February 14,2025 11:32:55 AM CST Streett Intersection To Closure Start Closure End Department Date Date Description Department Contact Closure Type 35 Ridgehurst Ln Bonnie Brae St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 36 Robinwood Ln Live Oak Kayewood Or 01/27/25 02/28/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 37 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 38 Shagbank Or Homebeam St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 39 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 40 Texas st Bell Ave Oakland St 02/08/25 02/17/25 Driver pipeline replacing valley Public Works Inspections Alexander Cervantes Full Closure gutter 41 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 42 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 02/28/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure ins 43 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 44 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 45 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 46 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 47 Willowwood St Westwood or Leslie St 01/16/25 02/28/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on February 14,2025 11:32:55 AM CST 3 Street Closure Report: Completed Closures smartsheet wom-' • r- - - •-• • Description Depaent Department Contact • - •- 1 Desert Willow or Silktree Ct @ Intersection 01/13/25 02/06/25 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure Dunes St Dunes Ct @ Intersection 01/27/25 02/14/25 Removing asphalt and placing Engineering Taylor Holt Full Closure 2 valley gutter in the eastern portion of the intersection on Dunes St 3 Eagle Dr Beatty St Central Ave 11/25/24 02/14/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 4 Harvest Hill or Waldorf or Harvest Glen Dr 01/06/25 01/17/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 5 Mockingbird Ln Howard Ct Lance Ln 01/06/25 02/07/25 Sidewalk and ADA repair Streets Roy San Miguel Lane Closure Pickwick Ln Oxford Lane @ Intersection 01/27/25 01/31/25 Removing asphalt and placing Engineering Taylor Holt Full Closure 6 valley gutter in the eastern portion of the intersection on Pickwick Ln. 7 Ryan Rd Country Club Rd Montecito or 01/17/25 01/24/25 Hydroexcavation of existing Public Works Inspections Caitlin Brown Rolling Closure utilities 8 Smith St Hill St Duncan St 12/11/24 01/27/25 Manhole Installation in the Public Works Inspections Tasheba Jones Lane Closure street and water taps Exported on February 14,2025 11:33:12 AM CST