Loading...
2025/02/21 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 24th - Mar 2nd Closure Start Street/Intersection From Date M�Description Department Department Contact Closure Type 1 Bell Ave N(3317) Locust St N Holly Creek 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure 2 Lake Side Ct Lake Country Dr Cut v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 3 Precision Dr Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 4 Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 04/19/25 Contractor to install 12-inch waterline to provide Engineering Jesus Perez Full Closure water to the new DISD elementary school 5 Spur Ct Lake Country Dr Cut v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure Exported on February 21,2025 12:01:00 PM CST 2 Street Closure Report: Current Closures smartsheet ll=� Department Department Contact , 1 Panhandle St Broadway St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure AileenSt pavement replacement. Audra Ln Stockton St Mockingbird Ln 02/24/25 03/21/25 Paving new addition street lane Private Development Public Zabdiel Mots Lane Closure on Audra Lane and replacing Works Inspections 2 street panel on existing roadway where 8-inch water tap was performed. Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure 3 to existing City of Denton drainage. 4 Ave A Collins St Eagle or 10/08/24 03/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 6 Ave B Fannin St Margie St 11/22/24 02/28/25 Pavement replacement Engineering Scott Fettig Full Closure 7 Ave C Eagle or Highland St 08/26/24 03/01/25 Pavement replacement. Engineering Scott Fettig Full Closure 8 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 9 Bonnie Brae St FM1515 Walt Parker or 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 11 Collins St Ave A Bernard St 08/26/24 02/28/25 Utility installations and Engineering Scott Felig Full Closure pavement replacement. 12 Congress St. Ponder Ave. Coit St. 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 14 Duncan St Smith St Kerley St 02/21/25 03/07/25 Water Utility Line Repairs Public Works Inspections Kirk Winter Lane Closure 15 Eagle or Central Ave Ave A 02/17/25 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 16 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 17 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/14/25 Concrete Panels and Sidewalk Streets Roy San Miguel Lane Closure Repair 18 Fannin St Ave A Ave B 12/09/24 02/28/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure 19 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 20 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 21 Hidden Path Ln(7808) White Dove Ln Montecito or 01/27/25 03/07/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 22 Hill St Smith St Mill St 02/21/25 03/14/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure 23 Hillcrest St Panhandle St Crescent St 12/27/23 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 24 Houston PI Thomas St Bradley St 09/27/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure 25 and gutter mill subgrade stabilization 26 Margie St Ave A Ave B 11/01/24 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 27 Marietta St Oak St W Scripture St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 28 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 29 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 30 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 02/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 31 Ocean or Atlantic or Nautical Ln 01/02/25 02/28/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 32 Panhandle St Ector St Aileen St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 33 Pinto or(2820) Paint or at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel Lane Closure Repair Exported on February 21,2025 12:01:38 PM CST Streett Intersection From To Closure Start Closure End Date Date Description Department Department Contact Closure Type 34 Robinwood Ln Live Oak Kayewood Dr 01/27/25 02/28/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 35 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 36 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 37 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 38 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 02/28/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure ins 39 Walnut St E Locust St S Austin St S 02/25/25 02/25/25 Crane replacing HVAC on Wells Other Patrick Nunley Full Closure Fargo building 40 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 41 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 42 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 43 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 44 Willowwood St Westwood or Leslie St 01/16/25 02/28/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on February 21,2025 12:01:38 PM CST 3 Street Closure Report: Completed Closures smartsheet Er— __FM510= ck • •- I •-• • Description -•. • • •- 1 Bonnie Brae St Birch Grove Bend Vintage Blvd 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Lane Closure infrastructure installation 2 Bonnie Brae St N Oak St Hickory St 02/10/25 02/21/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure comer for DIM Bonnie Brae St S National Wholesale(south of Parvin Rd 02/12/25 02/15/25 Installation of Sanitary Sewer Engineering Robin Davis Full Closure 3 RR Tracks) line crossing under Bonnie Brae -Access to Natl Wholesale from the north end only. 4 Desert Willow or Silktree Ct @ Intersection 01/13/25 02/06/25 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure Dunes St Dunes Ct @ Intersection 01/27/25 02/14/25 Removing asphalt and placing Engineering Taylor Holt Full Closure valley gutter in the eastern portion of the intersection on Dunes St U Eagle or Beatty St Central Ave 11/25/24 02/14/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 7 Emerald Trace or Shagbank or Ridgehurst Ln 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 8 Mockingbird Ln Howard Ct Lance Ln 01/06/25 02/07/25 Sidewalk and ADA repair Streets Roy San Miguel Lane Closure Pickwick Ln Oxford Lane @ Intersection 01/27/25 01/31/25 Removing asphalt and placing Engineering Taylor Holt Full Closure g valley gutter in the eastern portion of the intersection on Pickwick Ln. 10 Ridgehurst Ln Bonnie Brae St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 11 Ryan Rd Country Club Rd Montecito or 01/17/25 01/24/25 Hydroexcavation of existing Public Works Inspections Caitlin Brown Rolling Closure utilities 12 Shagbank or Homebeam St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 13 Smith St Hill St Duncan St 12/11/24 01/27/25 Manhole Installation in the Public Works Inspections Tasheba Jones Lane Closure street and water taps 14 Texas st Bell Ave Oakland St 02/08/25 02/17/25 Driver pipeline replacing valley Public Works Inspections Alexander Cervantes Full Closure gutter Exported on February 21,2025 12:02:24 PM CST