2025/02/28 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Mar 3rd - Mar 9th
Street/Intersection Closu Start Description Department Department Contact Closure Type
Date re
1 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure
Bonnie Brae St University Dr(Hwy 380) Elm St N 03/10/25 03/24/25 Contractor will be preparing the right-ol-way by Engineering Jesus Perez Rolling Closure
2 cutUng down the trees that will be removed to
widen Bonnie Brae
3 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure
4 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure
5 Precision Dr Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Go Pineiro Full Closure
6 Welch St Eagle Dr Highland St 03/13/25 05/30/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure
Exported on February 28,2025 11:47:30 AM CST
2 Street Closure Report: Current Closures smartsheet
ll=� Department Department Contact ,
1 Panhandle St Broadway St 09/27/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure AileenSt
pavement replacement.
Audra Ln Stockton St Mockingbird Ln 02/24/25 03/21/25 Paving new addition street lane Private Development Public Zabdiel Mots Lane Closure
on Audra Lane and replacing Works Inspections
2 street panel on existing
roadway where 8-inch water tap
was performed.
Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure
3 to existing City of Denton
drainage.
4 Ave A Collins St Eagle or 10/08/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Ave B Fannin St Margie St 11/22/24 04/30/25 Pavement replacement Engineering Scott Fettig Full Closure
7 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure
8 Bell Ave N(3317) Locust St N Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure
9 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
10 Bonnie Brae St Stella St Oak St W 03/03/25 03/21/25 DME Sub Station work along Public Works Inspections Collin Cole Lane Closure
Bonnie Brae
11 Bonnie Brae St FM1515 Walt Parker or 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
12 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
13 Collins St Ave A Bernard St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Congress St Ponder Ave Coit St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Duncan St Smith St Kerley St 02/21/25 03/07/25 Water Utility Line Repairs Public Works Inspections Kirk Winter Lane Closure
17 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
18 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/14/25 Concrete Panels and SideWalk Streets Roy San Miguel Lane Closure
Repair
19 Fannin St Ave A Ave B 12/09/24 03/28/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure
20 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
22 Hidden Path Ln(7808) White Dove Ln Montecito or 01/27/25 03/07/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
23 Hill St Smith St Mill St 02/21/25 03/14/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure
24 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
25 Houston PI Thomas St Bradley St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure
26 and gutter mill subgrade
stabilization
27 Lake Side Ct Lake Country or Cul v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
28 Margie St Ave A Ave B 11/01/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
29 Marietta St Oak St W Scripture St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
30 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
31 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
32 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 03/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
33 Ocean or Atlantic Dr Nautical Ln 03/14/25 04/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
34 Panhandle St Ector St Aileen St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on February 28,2025 11:47:51 AM CST
Streett Intersection To Closure Start Closure End I Description Department Department Contact Closure Type
Date Date
35 Pinto or(2820) Paint or at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel I Lane Closure
Repair
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 04/19/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
36 waterline to provide water to the
new DISD elementary school
37 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
38 Robinwood Ln Live Oak Kayewood or 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
39 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
40 Spur Ct Lake Country or Cul v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
41 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
42 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
43 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 03/31/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure
ins
44 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
45 welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
46 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
47 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
48 Willowwood St Westwood or Leslie St 03/10/25 04/14/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
49 Withers St Vine St Bell Ave 02/28/25 03/03/25 Valley Gutter repair Other Alexander Cervantes Full Closure
Exported on February 28,2025 11:47:51 AM CST
3 Street Closure Report: Completed Closures smartsheet
Er—
__FM510=
ck • •- I •-• • Description -•. • • •-
1 Bonnie Brae St Birch Grove Bend Vintage Blvd 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Lane Closure
infrastructure installation
2 Bonnie Brae St N Oak St Hickory St 02/10/25 02/21/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure
comer for DIM
Bonnie Brae St S National Wholesale(south of Parvin Rd 02/12/25 02/15/25 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
3 RR Tracks) line crossing under Bonnie Brae
-Access to Natl Wholesale from
the north end only.
4 Desert Willow or Silktree Ct @ Intersection 01/13/25 02/06/25 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure
Dunes St Dunes Ct @ Intersection 01/27/25 02/14/25 Removing asphalt and placing Engineering Taylor Holt Full Closure
valley gutter in the eastern
portion of the intersection on
Dunes St
G Eagle or Beatty St Central Ave 11/25/24 02/14/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
7 Eagle Dr Central Ave Ave A 02/17/25 02/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Emerald Trace or Shagbank Dr Ridgehurst Ln 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure
infrastructure installation
9 Mockingbird Ln Howard Ct Lance Ln 01/06/25 02/07/25 Sidewalk and ADA repair Streets Roy San Miguel Lane Closure
Pickwick Ln Oxford Lane @ Intersection 01/27/25 01/31/25 Removing asphalt and placing Engineering Taylor Holt Full Closure
10 valley gutter in the eastern
portion of the intersection on
Pickwick Ln.
11 Ridgehurst Ln Bonnie Brae St Emerald Trace Dr 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure
infrastructure installation
12 Shagbank or Homebeam St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure
infrastructure installation
13 Texas st Bell Ave Oakland St 02/08/25 02/17/25 Driver pipeline replacing valley Public Works Inspections Alexander Cervantes Full Closure
gutter
14 Walnut St E Locust St S Austin St S 02/25/25 02/25/25 Crane replacing HVAC on Wells Other Patrick Nunley Full Closure
Fargo building
Exported on February 28,2025 11:48:05 AM CST