2025/03/07 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Mar 10th - 16th
Closure Start
Street/Intersection From To Date IMI Description Department Department Contact Closure Type
1 Mounts Ave Congress St W Haynes St 03/21/25 05/27/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure
2 Precision Or Airport Rd UNT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineim Full Closure
Exported on March 7,2025 11:37:12 AM CST
2 Street Closure Report: Current Closures smartsheet
ll=� MENLA=,—.mmiM��E Department Department Contact ,
1 Panhandle St Broadway St 09/27/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure AileenSt
pavement replacement.
Audra Ln Stockton St Mockingbird Ln 02/24/25 03/21/25 Paving new addition street lane Private Development Public Zabdiel Mots Lane Closure
on Audra Lane and replacing Works Inspections
2 street panel on existing
roadway where 8-inch water tap
was performed.
Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure
3 to existing City of Denton
drainage.
4 Ave A Collins St Eagle or 10/08/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Ave B Fannin St Margie St 11/22/24 04/30/25 Pavement replacement Engineering Scott Fettig Full Closure
7 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. I Engineering Scott Fettig Full Closure
8 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
9 Bell Ave N(3317) Locust St N Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure
10 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
11 Bonnie Brae St Stella St Oak St W 03/03/25 03/21/25 DME Sub Station work along Public Works Inspections Collin Cole Lane Closure
Bonnie Brae
Bonnie Brae St University or(Hwy 380) Elm St N 03/10/25 03/24/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure
12 right-of-way by cutting down the
trees that will be removed to
widen Bonnie Brae
13 Bonnie Brae St FM1515 Walt Parker Dr 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
15 Collins St Ave A Bernard St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Congress St Ponder Ave Coit St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
17 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
18 Duncan St Smith St Kerley St 02/21/25 03/14/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure
Repairing Asphalt
19 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/14/25 Concrete Panels and SideWalk Streets Roy San Miguel Lane Closure
Repair
21 Fannin St Ave A Ave B 12/09/24 03/28/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure
22 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
23 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
24 Hidden Path Ln(7808) White Dove Ln Montecito or 01/27/25 03/14/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
25 Hill St Smith St Mill St 02/21/25 03/14/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure
26 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Houston PI Thomas St Bradley St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Jim Christal&Masch Branch Western Blvd Masch Branch 03/07/25 04/04/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
28 Christal:Adding a turn Lane on
Masch Branch
Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure
29 and gutter mill subgrade
stabilization
30 Lake Side Ct Lake Country or Cul v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
31 Margie St Ave A Ave B 11/01/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
32 Marietta St Oak St W Scripture St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on March 7,2025 11:37:24 AM CST
Streett Intersection From To Closure Start Closure End Description Department Department Contact
Date Date Closure Type
33 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
34 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
35 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 03/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
36 Ocean Dr Atlantic Dr Nautical Ln 03/14/25 04/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
37 Panhandle St Ector St Aileen St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
38 Pinto Dr(2820) Paint or at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel Lane Closure
Repair
39 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 04/19/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
40 waterline to provide water to the
new DISD elementary school
41 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
42 Robinwood Ln Live Oak Kayewood or 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
43 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
44 Spur Ct Lake Country or Cul v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
45 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
46 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
47 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 03/31/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure
ins
48 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
49 Welch St Eagle or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
50 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
51 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
52 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
53 Willowwood St Westwood or Leslie St 03/10/25 04/14/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on March 7,2025 11:37:24 AM CST
3 Street Closure Report: Completed Closures smartsheet
Er—
__FM510=
ck • •- I •-• • Description -•. • • •-
1 Bonnie Brae St Birch Grove Bend Vintage Blvd 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Lane Closure
infrastructure installation
2 Bonnie Brae St N Oak St Hickory St 02/10/25 02/21/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure
comer for DIM
Bonnie Brae St S National Wholesale(south of Parvin Rd 02/12/25 02/15/25 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
3 RR Tracks) line crossing under Bonnie Brae
-Access to Natl Wholesale from
the north end only.
4 Desert Willow Dr Silktree Ct @ Intersection 01/13/25 02/06/25 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure
Dunes St Dunes Ct @ Intersection 01/27/25 02/14/25 Removing asphalt and placing Engineering Taylor Holt Full Closure
valley gutter in the eastern
portion of the intersection on
Dunes St
G Eagle or Beatty St Central Ave 11/25/24 02/14/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
7 Eagle Dr Central Ave Ave A 02/17/25 02/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Emerald Trace or Shagbank Dr Ridgehurst Ln 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure
infrastructure installation
9 Mockingbird Ln Howard Ct Lance Ln 01/06/25 02/07/25 Sidewalk and ADA repair Streets Roy San Miguel Lane Closure
10 Ridgehurst Ln Bonnie Brae St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure
infrastructure installation
11 Shagbank or Homebeam St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure
infrastructure installation
12 Texas st Bell Ave Oakland St 02/08/25 02/17/25 Driver pipeline replacing valley Public Works Inspections Alexander Cervantes Full Closure
gutter
13 Walnut St E Locust St S Austin St S 02/25/25 02/25/25 Crane replacing HVAC on Wells Other Patrick Nunley Full Closure
Fargo building
14 Withers St Vine St Bell Ave 02/28/25 03/03/25 Valley Gutter repair Other Alexander Cervantes Full Closure
Exported on March 7,2025 11:37:52 AM CST