Loading...
2025/03/21 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Mar 24th- 30th Closure Start AM Date �De .-.. - .-.. - - 1 Austin7Dr Pecan St W Intersection 03/31/25 04/25/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure 2 Hialea Vineland Ave Intersection 04/07/25 05/02/25 Street Panel/ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure 3 Hollist Fanitia PI Intersection 04/07/25 05/02/25 ADA I Sidewalk Repair Streets Roy San Miguel Lane Closure 4 Oak S Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair Streets Roy San Miguel Lane Closure 5 Precision Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure Exported on March 21,2025 10:11:35 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet ll=� Department Department Contact , 1 Panhandle St Broadway St 09/27/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure AileenSt pavement replacement. Audra Ln Stockton St Mockingbird Ln 02/24/25 04/18/25 Paving new addition street lane Private Development Public Zabdiel Mots Lane Closure on Audra Lane and replacing Works Inspections 2 street panel on existing roadway where 8-inch water tap was performed. Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure 3 to existing City of Denton drainage. 4 Ave A Collins St Eagle or 10/08/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 6 Ave B Fannin St Margie St 11/22/24 04/30/25 Pavement replacement Engineering Scott Fettig Full Closure 7 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. I Engineering Scott Fettig Full Closure 8 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 9 Bell Ave N(3317) Locust St N Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure 10 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Bonnie Brae St University or(Hwy 380) Elm St N 03/10/25 04/04/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure 11 right-of-way by cutting down the trees that will be removed to widen Bonnie Brae 12 Bonnie Brae St FM1515 Walt Parker or 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Bonnie Brae St N Oak St Hickory St 02/10/25 04/05/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure corner for DME 14 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 15 Collins St Ave A Bernard St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 16 Congress St Ponder Ave Coit St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 17 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 18 Duncan St Smith St Kerley St 02/21/25 03/28/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure Repairing Asphalt Eagle or Ave C Ave A 03/17/25 04/18/25 A Manhole is being installed, Public Works Inspections Collin Cole Lane Closure 19 undermining of Eagle has began and it is becoming a safety issue 20 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Fannin St Ave A Ave B 12/09/24 03/28/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure 22 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 23 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 24 Hill St Smith St Mill St 02/21/25 03/28/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure 25 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Houston PI Thomas St Bradley St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Jim Christal&Masch Branch Western Blvd Masch Branch 03/07/25 04/04/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 27 Christal:Adding a turn Lane on Masch Branch Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure 28 and gutter mill subgrade stabilization 29 Lake Side Ct Lake Country or Cul v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 30 Margie St Ave A Ave B 11/01/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 31 Marietta St Oak St W Scripture St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on March 21,2025 10:12:14 AM CDT Page 1 of 2 Streett Intersection From To Closure Start Closure End Date Date Description Department Department Contact Closure Type 32 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 33 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 34 Mulberry St Welch St Bernard St 11/29/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 35 Mulberry St Elm St Carroll Blvd 03/17/25 04/14/25 Water/Wastewater connections I Public Works Inspections Stephany Trammell Full Closure 36 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 03/28/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 37 Ocean or Atlantic or Nautical Ln 03/14/25 04/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 38 Panhandle St Ector St Aileen St 09/27/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 39 Pinto or(2820) Paint or at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel Lane Closure Repair 40 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 04/19/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 41 waterline to provide water to the new DISD elementary school 42 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 43 Robinwood Ln Live Oak Kayewood or 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 44 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 45 Spur Ct Lake Country or Cut v Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 46 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 47 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 48 Unicorn Lake Blvd State School Rd Wind River Ln 12/17/24 03/31/25 Water and Sanitary Sewer tie Private Development Gavin Petner Lane Closure ins 49 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 50 Welch St Eagle or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 51 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 52 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 53 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 54 Willowwood St Westwood or Leslie St 03/10/25 04/14/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on March 21,2025 10:12:14 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet or— COMINLAW MNL---.MNfiMfflW- - Description Department Contact 1 Bonnie Brae St Birch Grove Bend Vintage Blvd 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Lane Closure infrastructure installation 2 Bonnie Brae St Stella St Oak St W 03/03/25 03/21/25 DIME Sub Station work along Public Works Inspections Collin Cole Lane Closure Bonnie Brae Eagle Dr Central Ave Ave A 02/17/25 02/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 4 Emerald Trace or Shagbank Dr Ridgehurst Ln 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 5 Evening Wind Rd Bishop Pine Rd Dessert Willow 01/13/25 03/21/25 Concrete Panels and SideWalk Streets Roy San Miguel Lane Closure Repair Hidden Path Ln(7808) White Dove Ln Montecito or 01/27/25 03/14/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 7 Ridgehurst Ln Bonnie Brae St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 8 Shagbank or Homebeam St Emerald Trace or 01/24/25 02/21/25 pavement removal and Public Works Inspections Kirk Winter Full Closure infrastructure installation 9 Walnut St E Locust St S Austin St S 02/25/25 02/25/25 Crane replacing HVAC on Wells Other Patrick Nunley Full Closure Fargo building 10 Withers St Vine St Bell Ave 02/28/25 03/03/25 Valley Gutter repair Other Alexander Cervantes Full Closure Exported on March 21,2025 10:12:41 AM CDT Page 1 of 1