2025/03/28 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Mar 31 st- Apr 6th
Closure Start Description Department Department Contact Closure Type
17Pmoision
Monlecito Or Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
2200) Vineland Ave Intersection 04/07/25 05/02/25 Street Panel/ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
3900) Fanitia PI Intersection 04/07/25 05/02/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
4 Atlantic Or Nautical Ln 04/07/25 05/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
5 Airport Rd LINT Library Annex 2/101/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
Exported on March 28,2025 11:30:49 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
Department Department Contact ��!!
1 Aileen St Panhandle St Broadway St 09/27/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Audra Ln Stockton St Mockingbird Ln 02/24/25 04/18/25 Paving new addition street lane Private Development Public Zabdiel Mots Lane Closure
on Audra Lane and replacing Works Inspections
2 street panel on existing
roadway where 8-inch water tap
was performed.
Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure
3 to existing City of Denton
drainage.
4 Austin St N(208) Pecan St W Intersection 03/31/25 04/25/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
5 Ave A Collins St Eagle or 10/08/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
7 Ave B Fannin St Margie St 11/22/24 04/30/25 Pavement replacement Engineering Scott Fettig Full Closure
8 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure
9 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
10 Bell Ave N(3317) Locust St N Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure
11 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
Bonnie Brae St University or(Hwy 380) Elm St N 03/10/25 04/04/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure
12 right-of-way by cutting down the
trees that will be removed to
widen Bonnie Brae
13 Bonnie Brae St Airport Rd(FM 1515) Walt Parker or(Main Stadium Dr) 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Bonnie Brae St N Oak St Hickory St 02/10/25 04/05/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure
corner for DIME
Bronco Way Chivalry or Bonnie Brae St 03/31/25 04/15/25 Contractor will be boring Engineering Jesus Perez Lane Closure
15 underneath the intersection of
Bonnie Brae and Bronco Way to
install a 12-inch water line
16 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
17 Collins St Ave A Bernard St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
18 Congress St Ponder Ave Colt St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
19 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Duncan St Smith St Kerley St 02/21/25 04/04/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure
Repairing Asphalt
21 E Congress St. Ponder St. Carroll Blvd. 03/31/25 06/01/25 1 Utility construction Engineering Megan Davidson Rolling Closure
Eagle or Ave C Ave A 03/17/25 04/18/25 A Manhole is being installed, Public Works Inspections Collin Cole Lane Closure
22 undermining of Eagle has
began and it is becoming a
safety issue
23 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
24 Fannin St Ave A Ave B 12/09/24 04/11/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure
25 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
26 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
27 Hill St Smith St Mill St 02/21/25 04/05/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure
28 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
29 Houston PI Thomas St Bradley St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Jim Christal&Masch Branch Western Blvd Masch Branch Rd 03/07/25 04/04/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
30 Christal:Adding a turn Lane on
Masch Branch
31 Lakeside Ct Lake Country or Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
Exported on March 28,2025 11:33:28 AM CDT Page 1 of 2
Streett Intersection To Closure . . Description .-p .-p . . .-
.. ..
32 Margie St Ave A Ave B 11/01/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
33 Marietta St Oak St W Scripture St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
34 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
35 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
36 Mulberry St Elm St Carroll Blvd 03/17/25 04/14/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
37 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
38 Nautical Ln Hickory Creek Rd Ocean or 01/02/25 04/15/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
39 Oak St E(109) Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair Streets Roy San Miguel Lane Closure
40 Ocean or Atlantic or Nautical Ln 03/14/25 04/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
41 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
42 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 04/19/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
43 waterline to provide water to the
new DISD elementary school
44 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
45 Robinwood Ln Live Oak Kayewood or 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
46 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
47 Spur Ct Lake Country or Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
48 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
49 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
50 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 04/30/25 Water tie ins Private Development Gavin Petner Lane Closure
51 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
52 Welch St Eagle or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
53 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
54 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
55 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
56 Willowwood St Westwood or Leslie St 03/10/25 04/14/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on March 28,2025 11:33:28 AM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Description Department Contact
1 Bonnie Brae St Stella St Oak St W 03/03/25 03/21/25 DME Sub Station work along Public Works Inspections Collin Cole Lane Closure
Bonnie Brae
2 Eagle or Central Ave Ave A 02/17/25 02/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
3 Evening Wind Rd Bishop Pine Rd Desert Willow or 01/13/25 03/21/25 Concrete Panels and SideWalk Streets Roy San Miguel Lane Closure
Repair
4 Hidden Path Ln(7808) White Dove Ln Montecito Dr 01/27/25 03/14/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure
5 and gutter mill subgrade
stabilization
6 Pinto Dr(2820) Paint Dr at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel Lane Closure
Repair
7 Withers St Vine St Bell Ave 02/28/25 03/03/25 Valley Gutter repair Other Alexander Cervantes Full Closure
Exported on March 28,2025 11:33:51 AM CDT Page 1 of 1