Loading...
2025/04/04 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Apr 7th - 13th Closure Start Street/Intersection Date JIMl-Description Department 177 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement replacement Engineering �an Hale Rolling Closure 2 Northridge St Hinkle Dr Bolivar St 04/16/25 04/20/26 Utilities and Pavement replacement Engineering A Hale Rolling Closure 3 Saddle Back Dr Quarter Horse Way Highpoint Dr 04/28/25 05/23/25 Sidewalk and Panel Repairs Streets an Miguel Lane Closure Exported on April 4,2025 11:52:50 AM CDT 2 Street Closure Report: Current Closures smartsheet Department Department Contact ��!! 1 Aileen St Panhandle St Broadway St 09/27/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Audra Ln Stockton St Mockingbird Ln 02/24/25 04/18/25 Paving new addition street lane Private Development Public Zabdiel Mots Lane Closure on Audra Lane and replacing Works Inspections 2 street panel on existing roadway where 8-inch water tap was performed. Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure 3 to existing City of Denton drainage. 4 Austin St N(208) Pecan St W @ Intersection 03/31/25 04/25/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure 5 Ave A Collins St Eagle or 10/08/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 7 Ave B Fannin St Margie St 11/22/24 04/30/25 Pavement replacement Engineering Scott Fettig Full Closure 8 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure 9 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 10 Bell Ave N(3317) Locust St N Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure 11 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Bonnie Brae St University or(Hwy 380) Elm St N 03/10/25 04/18/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure 12 right-of-way by cutting down the trees that will be removed to widen Bonnie Brae 13 Bonnie Brae St Airport Rd(FM 1515) Walt Parker or(Main Stadium Dr) 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Bronco Way Chivalry or Bonnie Brae St 03/31/25 04/15/25 Contractor will be boring Engineering Jesus Perez Lane Closure 14 underneath the intersection of Bonnie Brae and Bronco Way to install a 12-inch water line 15 Clear River Ln Montecito or Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 16 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 17 Collins St Ave A Bernard St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 18 Congress St Ponder St Carroll Blvd 03/31/25 06/01/25 Utility construction Engineering Megan Davidson Rolling Closure 19 Congress St Ponder Ave Colt St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 20 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 21 Duncan St Smith St Kerley St 02/21/25 04/25/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure Repairing Asphalt Eagle or Ave C Ave A 03/17/25 04/18/25 A Manhole is being installed, Public Works Inspections Collin Cole Lane Closure 22 undermining of Eagle has began and it is becoming a safety issue 23 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 24 Fannin St Ave A Ave B 12/09/24 04/11/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure 25 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Hialeah Dr(4200) Vineland Ave @ Intersection 04/07/25 05/02/25 Street Panel/ADA/Sidewalk Streets Roy San Miguel Lane Closure Repair 27 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure 28 Hill St Smith St Mill St 02/21/25 04/25/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure 29 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 30 Hollister Ln(1900) Fanitia PI @ Intersection 04/07/25 05/02/25 1 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure 31 Houston PI Thomas St Bradley St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 32 Huisache St Aspen or Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Exported on April 4,2025 11:53:22 AM CDT Streett Intersection From To Closure Start Closure End Description Department Department Contact Date Date Closure Type Jim Christal Masch Branch Rd @ Intersection 03/07/25 05/02/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 33 Christal:Adding a turn Lane on Masch Branch 34 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 35 Lakeside Ct Lake Country or Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 36 Margie St Ave A Ave B 11/01/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 37 Marietta St Oak St W Scripture St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 38 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 39 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 40 Mulberry St Elm St Carroll Blvd 03/17/25 04/14/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 41 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 42 Nautical Ln Hickory Creek Rd Ocean Or 01/02/25 04/15/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 43 Oak St E(109) Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair Streets Roy San Miguel Lane Closure 44 Ocean Dr Atlantic or Nautical Ln 03/14/25 04/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 45 Ocean Dr Atlantic Dr Nautical Ln 04/07/25 05/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 46 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 47 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure 48 Precision or Airport Rd UNIT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 04/19/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 49 waterline to provide water to the new DISD elementary school 50 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 51 Robinwood Ln Live Oak Kayewood Dr 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 52 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 53 Spur Ct Lake Country or Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 54 Sunset St University Dr W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 55 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 04/30/25 Water tie ins Private Development Gavin Petner Lane Closure 56 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 57 Welch St Eagle or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement F 58 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 59 Welch St S Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 60 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 61 Willowwood St Westwood or Leslie St 03/10/25 04/14/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on April 4,2025 11:53:22 AM CDT 3 Street Closure Report: Completed Closures smartsheet Ill=-IM M.r-T= Description Department Contact 1 Bonnie Brae St Stella St Oak St W 03/03/25 03/21/25 DIME Sub Station work along Public Works Inspections Collin Cole Lane Closure Bonnie Brae Bonnie Brae St N Oak St Hickory St 02/10/25 04/05/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure comer for DIM 3 Evening Wind Rd Bishop Pine Rd Desert Willow Dr 01/13/25 03/21/25 Concrete Panels and SideWalk Streets Roy San Miguel Lane Closure Repair 4 Hidden Path Ln(7808) White Dove Ln Montecito Dr 01/27/25 03/14/25 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure 5 and gutter mill subgrade stabilization B Pinto Dr(2820) Paint Dr at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel Lane Closure Repair 7 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on April 4,2025 11:53:42 AM CDT