2025/04/18 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Apr 21 st - 27th
Street/Intersection Closure Start �Description Department
Date
1 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement replacement Engineering Dante Hale Rolling Closure
2 Eastpark Blvd Linden Or Crescent St 04/28/25 05/26/25 Jobsite needs to be able to access the buildings Public Works Inspections Collin Cole Full Closure
with cranes but cant do that from inside jobsite
3 Ector St Emry St University Dr 04/28/25 05/26/25 Sanitary Sewer Being installed in the Public Works Inspections Collin Cole Lane Closure
Northbound lane
4 Fry St Oak St Hickory St 04/28/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
5 Hobson Ln Forrestridge Dr Country Club Rd 05/08/25 07/30/25 Utility work and turn lane construction on Public Works Inspections Gavin Petner Full Closure
Hobson
6 Oak St welch St Ave C 04/28/25 05/30/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
7 Saddle Back Or Quarter Horse Way Highpoint Or 04/28/25 05/23/25 Sidewalk and Panel Repairs SVeets Roy San Miguel Lane Closure
8 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure
Exported on April 18,2025 11:38:45 AM CDT
2 Street Closure Report: Current Closures smartsheet
17AudraLn
Panhandle St Broadway St 09/27/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure
2 to existing City of Denton
drainage.
3 Austin St N(208) Pecan St W @ Intersection 03/31/25 05/09/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
4 Ave A Collins St Eagle Dr 10/08/24 1 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Ave A Eagle Or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Ave B Fannin St Margie St 11/22/24 04/30/25 Pavement replacement Engineering Scott Fettig Full Closure
7 Ave C Eagle Dr Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure
8 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
9 Bernard St Lindsey St Fannin St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
10 Bonnie Brae St Airport Rd(FM 1515) Walt Parker Dr(Main Stadium Dr) 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Clear River Ln Montecito Dr Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
12 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
13 Collins St Ave A Bernard St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Congress St Ponder St Carroll Blvd 03/31/25 06/01/25 Utility construction Engineering Megan Davidson Rolling Closure
15 Congress St Ponder Ave Colt St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
17 Duncan St Smith St Kerley St 02/21/25 04/25/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure
Repairing Asphalt
Eagle Dr Ave C Ave A 03/17/25 05/09/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
18 elevation changes in the jobsite
it is the only way to get into the
site
19 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Hickory Creek Rd Riverpass Or Country Club Rd(FM 1830) 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
22 Hill St Smith St Mill St 02/21/25 04/25/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure
23 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
24 Huisache St Aspen Dr Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Masch Branch Rd @ Intersection 03/07/25 05/02/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
25 Christal:Adding a turn Lane on
Masch Branch
26 Johnson St Collins St Smith St 04/14/25 04/28/25 Sewer connection Public Works Inspections Stephany Trammell Lane Closure
27 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
28 Margie St Ave A Ave B 11/01/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
29 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
30 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
31 Mulberry St Elm St Carroll Blvd 03/17/25 05/09/25 I WaterNJastewater connections Public Works Inspections Stephany Trammell Full Closure
32 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
33 Nautical Ln Hickory Creek Rd Ocean Or 01/02/25 04/30/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
34 Northridge St Hinkle Or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
35 Oak St Carroll Blvd Fry St 04/21/25 05/26/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
Exported on April 18,2025 11:43:18 AM CDT
ClosureStreett Intersection From To Dat_ �'_ . pon DepartmentDepartment
36 Oak St E(109) Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair i Streets Roy San Miguel Lane Closure
37 Ocean or Atlantic or Nautical Ln 04/14/25 05/07/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
38 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
39 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure
40 Precision or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
41 waterline to provide water to the
new DISD elementary school
42 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction I Engineering Sheldon Gatewood Full Closure
43 Robinwood Ln Live Oak Kayewood or 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
44 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
45 Sunset St University or W Anna St 01/20/25 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
46 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 04/30/25 Water tie ins Private Development Gavin Petner Lane Closure
47 Welch St Highland St Hickory St 08/26/24 04/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
48 Welch St Oak St Hickory St 04/21/25 05/05/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Full Closure
49 Welch St Eagle or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
50 Welch St Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
51 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
52 Westway St Anna St Bolivar St 01/24/25 05/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
53 Willowwood St Westwood or Leslie St 03/10/25 05/07/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on April 18,2025 11:43:18 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/ •-r - - •-• • Description Depaent Department Contact • - •-
Audra Ln Stockton St Mockingbird Ln 02/24/25 04/18/25 Paving new addition street lane Private Development Public Zabdiel Mota Lane Closure
on Audra Lane and replacing Works Inspections
1 street panel on existing
roadway where 8-inch water tap
was performed.
2 Bell Ave N(3317) Locust St Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure
3 Bonnie Brae St Stella St Oak St 03/03/25 03/21/25 DME Sub Station work along Public Works Inspections Collin Cole Lane Closure
Bonnie Brae
4 Bonnie Brae St Oak St Hickory St 02/10/25 04/05/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure
corner for DM
Bonnie Brae St University or(Hwy 380) Elm St N 03/10/25 04/18/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure
5 right-of-way by cutting down the
trees that will be removed to
widen Bonnie Brae
Bronco Way Chivalry or Bonnie Brae St 03/31/25 04/15/25 Contractor will be boring Engineering Jesus Perez Lane Closure
6 underneath the intersection of
Bonnie Brae and Bronco Way to
install a 12-inch water line
7 Evening Wind Rd Bishop Pine Rd Desert Willow or 01/13/25 03/21/25 Concrete Panels and Sidewalk Streets Roy San Miguel Lane Closure
Repair
8 Fannin St Ave A Ave B 12/09/24 04/11/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure
9 Hialeah Dr(4200) Vineland Ave @ Intersection 04/07/25 04/17/25 Street Panel/ADA/Sidewalk Streets Roy San Miguel Lane Closure
Repair
10 Hollister Ln(1900) Fanitia PI @ Intersection 04/07/25 04/17/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
11 Houston PI Thomas St Bradley St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure
12 and gutter mill subgrade
stabilization
13 Lakeside Ct Lake Country or Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
14 Marietta St Oak St Scripture St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Pinto Dr(2820) Paint or at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel Lane Closure
Repair
16 Spur Ct Lake Country or Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
17 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on April 18,2025 11:39:18 AM CDT