2025/04/25 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Apr 28th - May 4th
Closure Start Description Department
Street/Intersection Date IMI
1 Hobson Ln Forreslridge Dr Country Club Rd 05/08/25 07/30/25 Utility work and turn lane construction on Public Works Inspections Gavin Petner Full Closure
Hobson
2 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Intersection Streets Roy San Miguel Lane Closure
3 Redstone Rd Hercules Ln Neptune Dr 05/0S/25 06/12/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure
4 Tawakoni or(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure
5 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure
Exported on April 25,2025 11:43:14 AM CDT
2 Street Closure Report: Current Closures smartsheet
Department Department C����
1 Aileen St Panhandle St Broadway St 09/27/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure
2 to existing City of Denton
drainage.
3 Austin St N(208) Pecan St W @ Intersection 03/31/25 05/09/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
4 Ave A Collins St Eagle or 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Ave B Fannin St Margie St 11/22/24 05/30/25 Pavement replacement Engineering Scott Fettig Full Closure
7 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure
8 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
9 Bernard St Lindsey St Fannin St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
10 Bonnie Brae St Airport Rd(FM 1515) Walt Parker or(Main Stadium Dr) 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
12 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
13 Clear River Ln Montecito or Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
14 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
15 Collins St Ave A Bernard St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
16 Congress St Ponder St Carroll Blvd 03/31/25 06/01/25 Utility construction Engineering Megan Davidson Rolling Closure
17 Congress St Ponder Ave Colt St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
18 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Eagle or Ave C Ave A 03/17/25 05/09/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
19 elevation changes in the jobsite
it is the only way to get into the
site
Eastpark Blvd Linden or Crescent St 04/28/25 05/26/25 Jobsite needs to be able to Public Works Inspections Collin Cole Full Closure
20 access the buildings with
cranes but cant do that from
inside jobsite
21 Ector St Emry St University Dr 04/28/25 05/26/25 Sanitary Sewer Being installed Public Works Inspections Collin Cole Lane Closure
in the Northbound lane
22 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
23 Fry St Oak St Hickory St 04/28/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
24 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
25 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
26 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Huisache St Aspen or Yucca or 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Masch Branch Rd @ Intersection 03/07/25 05/02/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
28 Christal:Adding a turn Lane on
Masch Branch
29 Johnson St Collins St Smith St 04/14/25 05/09/25 Sewer connection Public Works Inspections Stephany Trammell Lane Closure
30 Juno Ln Atlas or Stuart or 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
31 Margie St Ave A Ave B 11/01/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
32 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
33 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
Exported on April 25,2025 11:43:33 AM CDT
Streett Intersection From To Closure Start Closure End n Department Department Contact
Date Date Descriptio Closure Type
34 Mulberry St Elm St Carroll Blvd 03/17/25 05/09/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
35 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
36 Nautical Ln Hickory Creek Rd Ocean Or 04/28/25 05/30/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
37 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
38 Oak St Carroll Blvd Fry St 04/21/25 05/26/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
39 Oak St Welch St Ave C 04/28/25 05/30/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
40 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 05/07/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
41 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
42 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure
43 Precision or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
44 waterline to provide water to the
new DISD elementary school
45 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
46 Robinwood Ln Live Oak Kayewood Dr 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
47 Saddle Back or Quarter Horse Way Highpoint or 04/28/25 05/23/25 Sidewalk and Panel Repairs Streets Roy San Miguel Lane Closure
48 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
49 Sunset St University Dr W Anna St 01/20/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
50 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 05/30/25 Water tie ins Private Development Gavin Petner Lane Closure
51 Welch St Oak St Hickory St 04/21/25 05/05/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Full Closure
52 Welch St Eagle Or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
53 Welch St Eagle or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
54 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
55 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
56 Westway St Anna St Bolivar St 01/24/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
57 Willowwood St Westwood Or Leslie St 03/10/25 05/07/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on April 25,2025 11:43:33 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/ •-r - - •-• • Description Depaent Department Contact • - •-
Audra Ln Stockton St Mockingbird Ln 02/24/25 04/18/25 Paving new addition street lane Private Development Public Zabdiel Mota Lane Closure
on Audra Lane and replacing Works Inspections
1 street panel on existing
roadway where 8-inch water tap
was performed.
2 Bell Ave N(3317) Locust St Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure
3 Bonnie Brae St Oak St Hickory St 02/10/25 04/05/25 Concrete poles install on that Public Works Inspections John Cantu Lane Closure
corner for DM
Bonnie Brae St University Dr(Hwy 380) Elm St N 03/10/25 04/18/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure
4 right-of-way by cutting down the
trees that will be removed to
widen Bonnie Brae
Bronco Way Chivalry Dr Bonnie Brae St 03/31/25 04/15/25 Contractor will be boring Engineering Jesus Perez Lane Closure
5 underneath the intersection of
Bonnie Brae and Bronco Way to
install a 12-inch water line
6 Duncan St Smith St Kerley St 02/21/25 04/25/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure
Repairing Asphalt
7 Fannin St Ave A Ave B 12/09/24 04/11/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure
8 Hialeah Dr(4200) Vineland Ave @ Intersection 04/07/25 04/17/25 Street Panel/ADA/Sidewalk Streets Roy San Miguel Lane Closure
Repair
9 Hill St Smith St Mill St 02/21/25 04/25/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure
10 Hollister Ln(1900) Fanitia PI @ Intersection 04/07/25 04/17/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
11 Houston PI Thomas St Bradley St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Kenwood St Wilderness St Fox Hollow 11/18/24 03/28/25 Reconstruction of the road curb Streets Jesus Rodriguez Full Closure
12 and gutter mill subgrade
stabilization
13 Lakeside Ct Lake Country Dr Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
14 Marietta St Oak St Scripture St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Oak St E(109) Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair Streets Roy San Miguel Lane Closure
16 Pinto Dr(2820) Paint Dr at Intersection 02/24/25 03/28/25 Street Panels and Sidewalk Streets Roy San Miguel Lane Closure
Repair
17 Spur Ct Lake Country Dr Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
18 Thomas St Panhandle St Emery St 10/11/24 03/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on April 25,2025 11:43:51 AM CDT