050225 Friday Staff ReportCity Manager’s Office 215 E. McKinney St., Denton, TX 76201  (940) 349-8307 OUR CORE VALUES Inclusion  Collaboration  Quality Service  Strategic Focus  Fiscal Responsibility MEMORANDUM DATE: May 2, 2025 TO: The Honorable Mayor Hudspeth and Council Members FROM: Sara Hensley, City Manager SUBJECT: Friday Staff Report Upcoming Meetings A.Public Utilities Board on Monday, May 5, 2025, at 9:00 a.m. in the City Council WorkSession Room. B.Work Session of the City Council on Tuesday, May 6, 2025, at 2:00 p.m. in the CityCouncil Work Session Room followed by a Regular Meeting at 6:30 p.m. in the CouncilChambers. C.CANCELLED - Health and Building Standards Commission on Thursday, May 8, 2025,at 3:00 p.m. at the Development Service Center. D.CANCELLED - Community Services Advisory Committee on Friday, May 9, 2025, at 12:00 p.m. at the Development Service Center. Please check the City of Denton website for final meeting days and times as information is subject to change after the Friday Report is published. Public Meetings & Agendas | Denton, TX (civicplus.com) General Information & Status Updates A.City Auditor’s Second Quarter Report – The City's Auditor's Office has released its Fiscal Year 2024-25 second quarter performance report. During the second quarter, a newaudit report covering Animal Services was released. In addition, the City Auditor's Officeresponded to three requests for advice and assistance. At the end of the second quarter, theOffice had used about 55 percent of the time budgeted for audit projects. The City Auditor’s Quarterly Reports are intended to provide the City Council and thepublic with a status update on the Annual Internal Audit Plan and RecommendationFollow-Up. The second quarter report can be seen on the internal audit website. Staffcontact: Madison Rorschach, City Auditor B.Municipal Court Closed for Training – The Municipal Court will be closed for trainingand staff development on Wednesday, May 7. The automated phone payment system andonline services will remain available. Online services include case information, paymentremittance, and case resolution options. Messages advising of the closure and serviceoptions have been placed on the phone system, the court website, and at the court entrance. Staff contact: Jamie Lindsay, Municipal Court C.City Council Priorities Update – The City Manager’s Office is pleased to provide an updateon Council priorities. The attached report reflects progress through the fiscal year's firstquarter. Initiatives aligned with Council priorities are also tracked and reported through the City’s performance management software and included, amongst over 100 initiativessupporting Council’s Key Focus Areas, on the City’s public-facing dashboard. Staffcontact: Aimée Kaslik, City Manager’s Office D.Monthly Mobility Report - Innovative Transportation Solutions (ITS) provides a monthly report that includes an overview of Texas Department of Transportation (TxDOT) regionalprojects. See the attached ITS Monthly Mobility Report for review. Staff contact: SethGarcia, Capital Projects E.Mayor’s Pet Spotlight – Kenny is the name, and being your new dog is the game! Kenny is an adorable male Lab mix who is around twoyears old and eager to find his forever home. Kenny appears to bepotty trained and would thrive in an active household. He preferscalmer dogs as playmates, so if you already have a dog, we encourage you to bring them to the shelter for a meet and greet. Kenny pulls on the leash, but he can work on this behavior with some training andcorrections. He weighs about 66 pounds, so a person with experiencehandling larger dogs would be ideal for fostering or adopting him.Come Meet Kenny today! Contact Denton Animal Services by phone at (940) 349-7594 or via email at Animal.Services@cityofdenton.com. Staff contact: Bailey Coleson,Animal Services. 2 F.Building Safety Month (Updated) – Building Safety Month is a worldwide campaign heldin May to raise awareness for building safety and show appreciation for building professionals. The City is hosting a City-wide building safety coloring contest for children ages 0-12, accepting submissions through May 31. Coloring templates are on the BuildingSafety Month 2025 Story Map. Entries can be submitted in person at the DevelopmentService Center (401 N Elm Street) or by emailing Angela Adams(angela.adams@cityofdenton.com). Additionally, a proclamation is scheduled for the May 6 City Council meeting in honor of Building Safety Month. Staff Contact: Angela Adams, Development Services Responses to Council Member Requests for Information A.Homebuyer Incentive for City Employees – On April 25, Council Member Holland inquired if the City offered a program to incentivize employees to purchase homes in thecity. The City provides Homebuyer 101 classes to provide education opportunities open toemployees and community members about homebuying incentives and programs..Additionally, the Homebuyer Assistance Program helps low- and moderate-income families who meet the 80% Area Median Income requirements with down payment assistance and closing costs to buy their first home. Staff contact: Jesse Kent, CommunityServices B.Neighborhood Construction Concerns – On April 29, Council Member Holland shared an inquiry from a Thistle Hill Estates neighborhood resident regarding dust from the Parkside subdivision. Staff contacted the contractor and the developer to increase the wateringfrequency for dust control. The contractor will keep a water truck on-site specifically fordust control. Staff contact: Wesley McBride, Public Works C.Old North Park Flooding – On April 30, Council Member Beck inquired about the 380 Old North Park flooding. As a temporary measure, the 380 Old North Park development isinstalling underground detention beneath the elevated section adjacent to theneighborhood. This system is designed to capture future water runoff until the permanentdrainage improvements are completed. While these improvements are underway, they arenot yet fully operational. Staff has directed the developer and contractor to implement additional temporary measures to mitigate flooding until the permanent drainage system iscomplete and functioning as intended. Staff contact: Wesley McBride, Public Works D.Stop Signs on Sundown Boulevard – On April 30, Council Member Holland shared aninquiry from a resident regarding the spacing between stop signs recently installed.Following a three-day speed study audit of the corridor, staff implemented All-Way Stop Controls (AWSC) at the intersections of Sundown Boulevard at Clubhouse Drive andLake Country Drive. These AWSC installations are designed to improve traffic flow andenhance safety for both vehicles and pedestrians at these intersections. Furthermore, theplacement of the AWSC signs on either side of the existing midblock trail crossing isintended to increase safety for trail users. Staff will conduct a follow-up assessment of the effectiveness of the new AWSC signs in two to three weeks. Staff contact: ChandraMuruganandham, Transportation Services 3 Attachments A.Council Priorities Progress Report Q2 ..............................................................................5 B.ITS April 2025 Mobility Report ......................................................................................21 Informal Staff Reports A.2025-042 Denton Central Appraisal District Budget 2026 ...............................................39 B.2025-043 Solid Waste Services at Denton Enterprise Airport ...........................................52C.2025-044 Hickory Creek Phase 3 Capital Project ..............................................................55 Upcoming Community Events and Public Meetings Please visit the City of Denton website for upcoming community events and details. Information A.Council Requests for Information ....................................................................................60 B.Public Meetings Calendar ................................................................................................62 C.Future Work Session Items ..............................................................................................66 D.Street Closure Report .......................................................................................................67 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 City of Denton Transportation Update Prepared by: April 2025 1 City of Denton Transportation/Mobility Project Status Report Prepared by ITS April 2025 PROJECTS •Project Summary ............................................ page 2 •I-35 North ....................................................... page 3 •I-35/35E/35W Merge...................................... page 5 •I-35E/Mayhill ................................................. page 8 •I-35W Frontage Roads Middle ....................... page 9 •Loop 288 West Frontage Roads ................... page 10 •Loop 288 East-US 380 Connector ................ page 11 •Bonnie Brae Segment 7 ................................ page 12 •FM 1515 ....................................................... page 13 •FM 1173 ....................................................... page 14 •Outer Loop.................................................... page 15 •Glossary of Acronyms .................................. page 16 •TxDOT Funding Categories ......................... page 17 •Denton City Limits ....................................... page 18 21 City of Denton Transportation Update Prepared by: April 2025 2 PROJECT SUMMARY PROJECT LET DATE CONTRACTOR/ ENGINEER CONSTRUCTION COST I-35 North Various Stantec $897,796,423 I-35/35E/35W Merge 04-2024 Sema Construction $588,780,841 I-35E/Mayhill 06-2025 LTRA $139,130,349 I-35W Frontage Roads Middle 09-2028 WSP $446,891,327 Loop 288 West Frontage Roads 09-2028 CP&Y $227,423,354 Loop 288 East-US 380 Connector * Westwood $1,262,000,000 Bonnie Brae Segment 7 * Westwood * FM 1515 * LTRA $69,484,709 FM 1173 * Halff $125,852,145 Outer Loop * LJA $1,547,212,128 TOTAL $5,304,571,276 22 City of Denton Transportation Update Prepared by: April 2025 3 Current Activity: • PS&E: Work on the 100% PS&E plan set for the -074 CSJ is underway with updates to 2024 TxDOT Specifications. Additionally, TxDOT plans to split -074 CSJ into three separate CSJs for letting. Update to project schedule to accommodate for project split is forthcoming. I-35 North CSJ: 0195-02-074; 0195-02-076; 0195-02-081; 0195- 01-116; 0195-02-084 Schematic Approval: January 31, 2019 Limits: From US 77 to FM 3002 (Cooke County line) Environmental Approval: October 7, 2019 Length: 12.4 miles Description: Reconstruct and widen 4- to 6-lane rural freeway with ramp modifications and reconstruct 4- to 4/6-lane frontage roads ROW Acquisition Complete: July 2023 Est. Construction Cost: $897,796,423 -074: $495,359,007 -081: $175,274,676 -116: $110,895,970 -084: $116,266,771 Utility Relocations Complete: -074: January 2026 -081: June 2025 -116: October 2025 -084: October 2025 Funding: $801,507,230 CAT 4: $220,966,122 CAT 11: $2,574,631 CAT 12: $577,966,477 100% Plans: -074: * -081: May 2025 -116: June 2025 -084: June 2025 Firm: Stantec Ready to Let Date: -074: January 2026 -081: June 2025 -116: October 2025 -084: October 2025 TxDOT PM: Dawit Abraham Let Date: -074: July 2026 -081: August 2025 -116: December 2029 -084: December 2029 23 City of Denton Transportation Update Prepared by: April 2025 4 • Work on the 100% PS&E plan set for the -081 CSJ is underway with updates to 2024 TxDOT Specifications; TxDOT is revising scope to ensure that the project scope fits within the available funds. • Work on the 100% PS&E plan set for -084 CSJ is underway with updates to the 2024 TxDOT Specifications; some scope being shifted to -081 CSJ. • Utilities: Status of utilities in conflict is listed below by CSJ/Segment. IH-35 from US 77 to South of FM 455; CSJ: 0195-02-074 Utilities that are clear of construction: Atmos Distribution, City of Denton, Frontier, Nortex, OneOK, and Sanger Electric. o AT&T: Install complete. Anticipate splicing and clearance in April 2025. o Bolivar Water: Anticipate clearance in early 2026. o Brazos Electric: Construction complete. Wreck-out and transfer pending. Anticipate clearance in April 2025. o CenturyLink/Brightspeed: Construction start pending CoServ Electric overhead. Anticipate clearance in May 2025. o CoServ Electric: Construction underway. Anticipate clearance in June 2025. o Lumen/Level 3: Relocations underway. Anticipate clearance in June 2025. o MCI/Verizon: Design pending. Utility agreement pending. o Sanger Water/Wastewater: Relocations underway. Anticipate clearance in April 2025. o Suddenlink/Altice: Design and utility agreement pending. Anticipate start of relocations in March 2025. Dependent upon CoServ. o UTRWD: Design and utility agreement finalized. Pending UTRWD contractor. Anticipate clearance in August 2025. o Zayo: Pending mobilization. Anticipate clearance in April 2025. IH-35 from North of FM 455 to View Road; CSJ: 0195-02-081 Utilities that are clear of construction: Lumen/Level 3, Sanger Electric and Sanger Water/Wastewater. o AT&T: Install complete; pending splicing. o Bolivar Water: Construction underway. Anticipate clearance in April 2025. o Brightspeed/Centurylink: Construction ongoing. Wreck-out and transfer to new facilities to follow. Anticipate clearance in April 2025. o Lumen/Level 3: Clear o MCI/Verizon: Anticipate start of construction in April 2025. Anticipate clearance in June 2025. o Nortex: Install complete; wreck-out ongoing. Anticipate completion in April 2025. o Zayo: Construction complete; pending wreck-out. Anticipate completion in April 2025. IH-35 from View Road to Cooke County Line (FM 3002); CSJ: 0195-02-084 Utilities that are clear of construction: AT&T, CoServ Electric, Lumen/Level 3, and Nortex o Bolivar WSC: Construction start pending. Anticipate clearance in August 2025. o Level 3/Lumen: Clear o MCI/Verizon: Design and utility agreement pending. Construction start pending. o Oncor: Design finalized. Anticipate start of construction in April 2025. Anticipate clearance in June 2025. o Zayo: Design finalized. Construction pending Oncor overhead completion. 24 City of Denton Transportation Update Prepared by: April 2025 5 Current Activity: •Construction: The project let for construction on April 4, 2024. The project was awarded to Sema Construction with a low bid of $588,780,840.70, at 18% above engineer’s estimate. There are 1,356 working days and 56 months of barricades. See attached TxDOT constructionreport. •Utilities: Utilities that are clear of construction: AT&T, Atmos Distribution, Atmos Transmission, Brazos Valley Electric, City of Denton Water/Wastewater, CoServ Electric, DME Distribution, DME Transmission, Fiberlight, and UPN. •Status of utilities in conflict is listed below. I-35/35E/35W Merge CSJ: 0195-03-099 (N Texas Blvd to I-35E/W) 0195-03-090 (I-35E/W to US 380) 0195-03-087 (US 380 to US 77) Schematic Approval: -090: August 2011 -087: January 31, 2019 Limits: From North Texas Blvd to US 77 north of Denton Environmental Approval: -090: June 2017 -087: October 7, 2019 Length: 5.073 miles ROW Acquisition Completed: May 2022 Description: Reconstruct interchange and existing frontage roads; reconstruct and widen to 6/8- lane rural freeway with ramp modifications Utility Relocations Complete: May 2025 Est. Construction Cost: $588,780,841 City of Denton Utility Relocations Completed: December 2024 Funding: $588,780,841 CAT 2: $65,978,054 CAT 3: $1,452,495 CAT 4: $75,042,004 CAT 11: $106,973,305 CAT 12 (Strategic Priority): $219,334,983 CAT 12 (Texas Clear Lanes): $120,000,000 100% Plans: January 2024 Firm & Key Contact: AECOM (-090); Stantec (-087) Let Date: April 4, 2024 TxDOT PM: John Rich Construction Completion: November 2029 25 City of Denton Transportation Update Prepared by: April 2025 6 o Charter-Spectrum: Standalone construction complete. Joint duct construction ongoing. Anticipate clearance in May 2025. o DME Distribution: Clear o Frontier: One unidentified conflict being resolved. Anticipate clearance in May 2025. o Level 3/Lumen (Joint Duct Bank): Construction underway from US 380 to US 77. Anticipate clearance in May 2025. Construction from Bonnie Brae to US 380 underway. Anticipate splicing in May 2025. o MCI/Verizon: Conduit install complete. Anticipate splicing in May 2025. o Zayo: Install complete. Repairs to new duct caused delay. Splicing remains. Anticipate clearance in May 2025. 26 City of Denton Transportation Update Prepared by: April 2025 7 TxDOT Monthly Project Report Date of report: April 7, 2025 Report prepared by: Jonathan Rich Project: 0195-03-087, ETC Control: 0195-03-087, ETCA Highway: IH 35 Limits: IH35E at North Texas Blvd to North of US 77 on IH35 Contractor: Sema TxDOT Project Manager: Jonathan Rich Phone: (945) 290-0731 Contractor’s Project Manager: Shea Hurley Phone: (720) 215-8056 Date Work Began: January 13, 2025 Anticipated Completion Date: November 2029 Current Activities: Current activities: Continue with earthwork and excavation at I-35W future off-ramp for FM 1515. Continue retaining wall at I-35W future off-ramp for FM 1515. Continue temporary shoring wall for detour along northbound frontage road from Bonnie Brae to Oak Street and southbound frontage road on I-35 from Oak Street to Airport Road. Continue placing temporary detour at 8 locations along southbound main lanes 35W, northbound frontage road and southbound frontage road. Place drainage along southbound frontage road on I-35E from Bonnie Brae to North Texas. Continue placing drainage from Scripture to US 380 and US 380 to Loop 288. Start placing drainage from Bonnie Brae on southbound frontage road to North Texas Boulevard. Placing culverts at Bonnie Brae and south of Loop 288. Continue with bridge 4 braided ramp on northbound frontage road before US 380. Start building permanent retaining wall on southbound frontage road north of US 380. Finish temporary signals at US 380, Oak, and Bonnie Brae, and activate US 380 intersection temporary signals. Place permanent asphalt at southbound frontage road south of Loop 288, ramp for Bonnie Brae and northbound frontage road. Place overhead temporary signs throughout project. Finish retaining walls (southbound I-35 frontage road north of US 380 and I-35W northbound before merge). Start bridge direct connector from 35E to 35W: drill shafts, temp walls, etc. Narrative description of last month’s activities: Finished clearing ROW for this phase. Finished placing temporary striping on I-35E main lanes northbound between Bonnie Brae and Oak Street. Earthwork and excavation at I-35W future off-ramp for FM 1515. Temporary ITS finalization and cut over. Temporary shoring wall for detour along northbound frontage road from Bonnie Brae to Oak Street and southbound frontage road from Oak Street to FM 1515. Start placing temporary detour at the previous locations after temporary walls are placed. Place drainage from Scripture to US 380 and US 380 to Windsor. Start drill shafts of braided ramp on northbound frontage road before US 380. Start building permanent retaining wall on southbound frontage road before US 380. Started placing temporary signals at US 380, Oak Street, and Bonnie Brae. Placed lime treatment for permanent southbound frontage road south of Loop 288. Narrative description of activities planned for next month: Temporary shoring wall for detour along northbound frontage road from Bonnie Brae to Oak Street and southbound frontage I-35 from oak Street to Airport Road. Start placing temporary detour after temporary walls are placed. Place drainage along southbound frontage road from Bonnie Brae to North Texas. Place drainage from Scripture to US 380 and US 380 to Windsor. Start drills hafts of braided ramp on northbound frontage road before US 380. Start building permanent retaining wall on southbound frontage road before US 380. Place temporary signals at US 380, Oak Street, and Bonnie Brae. Traffic issues: Nightly lane closures. Temporary one-lane frontage road until off-ramp for Bonnie Brae is completed. Plans for changes in traffic patterns: None Item(s) of work currently controlling project completion: Off ramps, bridges, and walls. Other items of significance: None 27 City of Denton Transportation Update Prepared by: April 2025 8 Current Activity: • PS&E: LTRA updated the plan set to the 2024 TxDOT Specifications and included additional sheets and quantities requested by TxDOT. LTRA submitted final plan set to TxDOT. • Utilities: Utilities currently clear of construction are: Atmos Gas (Distribution), AT&T, CoServ Gas, City of Denton, City of Denton Wastewater, NGG, Oncor, and United Private Networks. • Status of utilities in conflict is listed below. o Astound (formerly Grande): Conduit installed; cable pull and splicing pending. Anticipate clearance in May 2025. o Brightspeed/CenturyLink: Construction ongoing. Anticipate clearance in May 2025. o Charter/Spectrum: Construction underway. Pending Denton Electric overhead completion. o DME: Relocations underway. Anticipate clearance in August 2025. o DISD: Utility agreement pending. Anticipate clearance in June 2025. o Frontier: Northbound frontage road construction complete; cable pull ongoing. Pending Denton Electric pole relocation. Anticipate completion for southbound frontage road in May 2025. o Level 3/Lumen: Construction underway. Anticipate clearance in April 2025. o Zayo: Conduit install complete. Splicing ongoing. Anticipate completion in April 2025. I-35E/Mayhill CSJ: 0196-01-109 Schematic Approval: February 2011 Limits: I-35E intersection with Mayhill from Pockrus Page Rd to Loop 288 Environmental Clearance: January 31, 2012 Length: 1.912 miles ROW Acquisition Completed: November 2022 Description: Reconstruct interchange at Mayhill and I-35E and existing 4-lane frontage roads Utility Relocations Complete: August 2025 Est. Construction Cost: $139,130,349 City of Denton Utility Relocations Completed: February 2024 Funding: $139,130,349 CAT 2: $129,130,349 CAT 4: $10,000,000 100% Plans: November 2024 Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: August 2025 TxDOT Project Manager: Chaikou Bah Let Date: June 2025 28 City of Denton Transportation Update Prepared by: April 2025 9 Current Activity: • PS&E: WSP continues addressing TxDOT comments to 95% plan set and is working toward completion of final plan set. • ROW: There are 58 parcels to acquire. There are: 3 parcels in ED and 55 parcels acquired. ROW acquisition has been placed on hold due to District budgetary constraints. • Utilities: Status of utilities in conflict is listed below. o Astound (Grande): Design pending. Utility agreement pending. Construction schedule pending CoServ design. o Atmos: Design in review by TxDOT. Utility agreement pending. o Charter/Spectrum: Design pending. Utility agreement pending. Construction schedule pending CoServ design. o CoServ Electric: Design pending. Utility agreement pending. o DME Transmission: Joint use agreement pending. Facility to stay in place; not in conflict. o DME Distribution: Design pending. Utility agreement pending. o Fiberlight: Preliminary design approved. Agreement pending. Completion pending CoServ relocations. o Lumen/Level 3: Preliminary design pending. Utility agreement pending. o Trinity River Authority: Anticipate TRA to be clear pending revisions to TxDOT plans. o Zayo: Design pending. Utility agreement pending. I-35W Frontage Roads Middle CSJ: 0081-13-071 Schematic Approval: March 20, 2020 Limits: From 0.7 miles south of FM 407 to FM 2449 Environmental Clearance: June 30, 2020 Length: 6.76 miles Project Description: Construct frontage roads ROW Acquisition Complete: June 2026 Est. Construction Cost: $446,891,327 Utility Relocations Complete: December 2027 Funding: $213,024,000 CAT 2: $24,537,247 CAT 12: $188,486,753 100% Plans: December 2025 Firm: WSP Ready to Let Date: December 2027 TxDOT Contact: Gutema Gebriel Let Date: * 29 City of Denton Transportation Update Prepared by: April 2025 10 Current Status: • ROW: For RCSJ 2250-02-023, there are 19 parcels to acquire. There are: 2 parcels in ED and 17 parcels in possession. For RCSJ 2250-02-024, there are 20 parcels to acquire. There are: 5 parcels in negotiations and 15 parcels in possession. • ROW acquisition efforts are on hold due to District budgetary constraints. • PS&E: CP&Y updated PBLR for final submittal. • CP&Y updated Exhibit A and made final submittal on September 30, 2024. • The 95% PS&E plan set submittal was made on September 3, 2024. The comment resolution meeting was held on January 28, 2025. CP&Y continues addressing comments and working toward final submittal. • TxDOT requested revised traffic numbers; CP&Y awaiting new pavement design to finalize submittal. • Bi-weekly coordination meetings underway. • Utilities: SUE Level submittal was made on October 11, 2024. Loop 288 West Frontage Roads CSJ: 2250-00-013 (from I-35 to US 380) 2250-00-032 (from US 380 to I-35W) Schematic Approval: March 20, 2020 Limits: From I-35 to I-35W Environmental Clearance: September 28, 2020 Length: 9.0 miles Description: Construct frontage roads ROW Acquisition Complete: December 2025 Estimated Construction Cost: $227,423,354 -013: $95,315,990 -032: $132,107,364 Utility Relocations Complete: April 2026 Funding: $3,000,000 CAT 3 $1,000,000 CAT 7 100% Plans: March 2025 Firm & Key Contact: CP&Y, Tom Cochill & Jacob Roberts Ready to Let Date: April 2026 TxDOT Project Manager: Gutema Gebriel Let Date: * 30 City of Denton Transportation Update Prepared by: April 2025 11 Current Activity: • PS&E: Westwood submitted revised 90% schematic on March 28, 2025. • Westwood submitted drainage report to TxDOT for review; working on additional drainage report revisions according to comments received from TxDOT. • SUE provider preparing final SUE plan sheets. • ROW footprint meeting set for April 24, 2025. • Westwood met with City of Denton on April 3, 2025. • Environmental: Tentative public hearing date is April 24, 2025. TxDOT approved project for an Environmental Assessment (EA). Westwood is working on Environmental Assessment and Technical Reports. Loop 288 East-US 380 Connector CSJ: 2250-02-025; 0135-10-066 Schematic Approval: June 2025 Limits: from I-35 to US 380 east of Geesling Road Environmental Clearance: December 2025 Length: 8 miles Project Description: Construct Loop 288 frontage roads and grade separations and an improved connector to US 380 ROW Acquisition Completion: * Estimated Const. Cost: $1.262 billion Utility Relocations Completion: * Funding: * 100% Plans: * Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Ready to Let Date: * TxDOT PM: Stephen Endres Let Date: * 31 City of Denton Transportation Update Prepared by: April 2025 12 Current Activity: • PS&E: The segment between US 77 and Loop 288 has been added to Loop 288 East contract with Westwood. Bonnie Brae Segment 7 CSJ: * Schematic Approval: June 2025 Limits: From US 77 to Loop 288 Environmental Clearance: December 2025 Length: 0.2 miles ROW Acquisition Complete: * Description: Extension of Bonnie Brae north of US 77 Utility Relocations Complete: * Est. Construction Cost: * 100% Plans: * Funding: * Ready to Let Date: * Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Let Date: * TxDOT Project Manager: Stephen Endres Construction Start: * 32 City of Denton Transportation Update Prepared by: April 2025 13 Current Activity: •PS&E: LTRA updated plans to the 2024 TxDOT Specifications and submitted the final plan set on June 28, 2024. Plans have been shelved until letting. •Exhibit A: LTRA submitted new Exhibit A for CPKC approval. •Utilities: Status of utilities in conflict:o Atmos: Final design approved. Permit pending. Anticipate clearance in January 2026. o Brightspeed/CenturyLink: Design pending Oncor final design.o Charter/Spectrum: Design dependent on Oncor and DME design.o City of Denton Water/Wastewater: Design finalized. Anticipate start of construction in May2025. Anticipate clearance in December 2025.o Denton Municipal Electric: Preliminary design pending. Utility agreement pending.o Frontier: Pending overhead for final design. o MCI/Verizon: Design pending.o Oncor: Design pending. Construction schedule pending. o Unite Private Networks: Design pending. FM 1515 CSJ: 1951-01-011 Schematic Re-approval: October 13, 2021 Limits: From Bonnie Brae to Masch Branch Road Environmental Approval: August 4, 2020 Length: 2.096 miles Environmental Re-eval: March 15, 2022 Description: Widen existing 2-lane rural section to a six- lane divided urban roadway ROW Acquisition Complete: July 2023 Est. Construction Cost: $69,484,709 Utility Relocations Complete: January 2026 Funding: $500,000 CAT 7 100% Plans: June 2024 Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: January 2026 TxDOT Project Manager: Bryan Esmaili-Doki Let Date: * 33 City of Denton Transportation Update Prepared by: April 2025 14 Current Activity: • PS&E: Halff submitted final plan set to TxDOT on March 11, 2025. • Halff submitted BNSF Exhibit A on September 24, 2024. • Utilities: Status of utilities in conflict: o Altice-Suddenlink: Completing I-35 North relocations prior to FM 1173 relocations. o AT&T: Construction underway. Anticipate clearance in September 2025. o Atmos Gas (Transmission): Design finalized. Construction anticipate to start in April 2025. o Brightspeed/CenturyLink: Design review completed; awaiting revisions. Awaiting Oncor design for overhead portions. o City of Denton: Design under review with I-35 project. o CoServ: Initial design review completed; awaiting revisions. o Fiberlight: Design dependent upon Oncor and CoServ. o City of Krum: Design pending. Current long lead relocate. o Oncor: Partial preliminary design complete; awaiting revisions for phase 2 design. o Zayo: Design revisions pending. Dependent on CoServ design. FM 1173 CSJ: 1059-01-047; 1059-02-002 Schematic Approval: March 20, 2020 Limits: From I-35E to FM 156 Environmental Clearance: August 26, 2021 Length: 3.613 miles Description: Widen and realign to 4/6-lane divided urban road ROW Acquisition Completed: September 2023 Est. Construction Cost: $125,852,145 -047: $62,892,803 -002: $62,959,342 Utility Relocations Complete: June 2026 Funding: * 100% Plans: March 2025 Firm & Key Contact: Halff Associates, Adam Bazar Ready to Let Date: June 2026 TxDOT PM: Kwan Lam Let Date: * 34 City of Denton Transportation Update Prepared by: April 2025 15 Current Activity: • Design: LJA continued preparing 30% schematic and submitted on March 12, 2025, for review. • LJA submitted feasibility report on March 14, 2025. • LJA continues coordination with NCTCOG, TxDOT, USACE, and other agencies. • LJA continues identifying developments adjacent to proposed Outer Loop alignment. • LJA is coordinating with survey to identify existing culvert locations and sizes. • Utilities: LJA continues evaluating transmission level utilities within study area and gathering information near refined alignments and coordinating with entities. LJA continues developing Level D map. • Environmental: Evaluating easements and TxDOT property near USACE property. Reviewing additional constraints and areas of concern. Tracking right-of-entry responses. Ongoing field work in areas where right-of-entry has been obtained. Meeting with USACE to discuss project, conservation easements, and Elm Fork Bridge held on March 21, 2025. • Other: Project website is available: www.DentonCountyOuterLoop.com. • Public Involvement: Public Scoping Meetings were held on October 29, 2024, and on October 30, 2024. LJA drafted public scoping meeting documentation and submitted in January 2025. Anticipate a public meeting to be held in summer 2025. Outer Loop CSJ: 0918-46-341 Schematic Approval: March 2026 Limits: From I-35 to the DNT at the Denton County Line Environmental Clearance: September 2026 Length: 23 miles ROW Acquisition Complete: * Description: Construct a six-lane controlled access freeway with continuous frontage roads Utility Relocations Complete: * Est. Construction Cost: $1,547,212,128 100% Plans: * Funding: * Ready to Let Date: * Firm & Key Contact: LJA, Tony Kimmey Let Date: * TxDOT Project Manager: Liang Ding Construction Start: * 35 City of Denton Transportation Update Prepared by: April 2025 16 •AADT – Annual Average Daily Traffic •AFA – Advanced Funding Agreement •ARPA – Archeological Resources Protection Act •CE – Categorical Exclusion (environmental clearance process for projects that do not involve significantenvironmental impacts) •CLOMR – (FEMA’s) Conditional Letter of Map Revision •Conformity – Federal requirement in nonattainment areas to conduct air quality analysis on projects,programs, and policies identified in transportation plans, transportation improvement programs,federally funded projects, or projects requiring federal approval •CSJ – (TxDOT’s) Control Section Job Number •DCC – Design Concept Conference •EA – Environmental Assessment •ED – Eminent Domain •EIS – Environmental Impact Statement •EPIC – Environmental Permits, Issues, and Commitments •ESAL – Equivalent Single Axle Load (TxDOT design calculation) •FONSI – Finding of No Significant Impact •IAJR – Interstate Access Justification Request •ICA – Interlocal Cooperative Agreement •IFP – Initial Financial Plan •Let – Official date of receipt and opening of bids •MAPO – Meeting with Affected Property Owners •MPO – Metropolitan Planning Organization •MTP – Metropolitan Transportation Plan •NCTCOG – North Central Texas Council of Governments •NEPA – National Environmental Policy Act •NOPC – Notice of Proposed Construction •NTTA – North Texas Toll Authority •PBLR – Preliminary Bridge Layout Review •PS&E – Plans Specifications and Estimate •PUA – Possession and Use Agreement •ROW – Right-of-Way •RTC – Regional Transportation Council •RTL – Ready to Let (date project is clear for construction but lacks funding for actual let) •RTR – Regional Toll Revenue (funds resulting from certain toll/managed lane projects in DFW region) •RULIS – Right-of-Way, Utilities, Leasing, and Information System •STBG – Surface Transportation Block Grant •STIP – Statewide Transportation Improvement Program •SUE – Subsurface Utility Engineering •SW3P – Storm Water Pollution Prevention Plan •TCP – Traffic Control Plan •TIA – Time Impact Analysis •TPP – Transportation Planning and Programming •TPWD – Texas Parks & Wildlife Department •TTC – Texas Transportation Commission •TxDOT – Texas Department of Transportation •UTP – Unified Transportation Program •VE – Value Engineering Glossary of Acronyms 36 City of Denton Transportation Update Prepared by: April 2025 17 •CAT 1: Preventive Maintenance and Rehabilitation •CAT 2: Metro and Urban Area Corridor Projects / NCTCOG •CAT 3: Non-Traditionally Funded Transportation Projects •CAT 4: Statewide Connectivity Corridor Projects •CAT 5: Congestion Mitigation and Air Quality Improvement / NCTCOG •CAT 6: Structures Replacement and Rehabilitation (Bridge) •CAT 7: Metropolitan Mobility and Rehabilitation / NCTCOG •CAT 8: Safety Projects •CAT 9: Transportation Alternatives •CAT 10: Supplemental Transportation Projects •CAT 11: District Discretionary •CAT 12: Strategic Priority TxDOT Funding Categories 37 City of Denton Transportation Update Prepared by: April 2025 18 Denton City Limits 38 Date: May 2, 2025 Report No. 2025-042 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Denton Central Appraisal District (DCAD) 2026 Proposed Budget BACKGROUND: The City received notice of a public hearing on the 2026 Denton Central Appraisal District (DCAD) Proposed Budget. A copy of the notice is attached for review. There will be a public hearing on the proposed budget on May 08, 2025, at 3 p.m. at 3901 Morse Street, Denton, TX. The public hearing notice will be published no later than 10 days before the hearing date per the TPTC Sec. 6.062(a). If any entity wishes to disapprove the budget, they must do so within 30 days of adoption by resolution filed with the Denton CAD board of directors secretary per TPTC Sec. 6.06(a). If the Council would like to take action on the DCAD Proposed Budget, staff needs to be notified by Tuesday, May 13, to add to the City Council's May 20 agenda. The total 2026 DCAD Proposed Budget is $24,696,576.32, an increase of $874,934.70 from last year’s budget of $23,821,641.62. STAFF CONTACT: Jessica Williams, Chief Financial Officer Jessica.JWilliams@cityofdenton.com REQUESTOR: Staff initiated. PARTICIPATING DEPARTMENTS: Finance Department STAFF TIME TO COMPLETE REPORT: .5 hour 39 Notice Of Public Hearing On Denton Central Appraisal District 2026 Budget The Denton Central Appraisal District will hold a public hearing on a proposed budget for the 2026 fiscal year. The public hearing will be held on May 8, 2025 at 3:00 P.M. at 3901 Morse Street, Denton, Texas. A summary of the appraisal district budget follows: The total amount of the proposed budget.$24,696,576.32 The total amount of increase over the current year's budget.$874,934.70 The number of employees compensated under the proposed budget.125 The number of employees compensated under the current budget.125 The appraisal district is supported solely by payments from the local taxing units served by the appraisal district. If approved by the appraisal district board of directors at the public hearing, this proposed budget will take effect automatically unless disapproved by the governing bodies of the county, school districts, cities and towns served by the appraisal district. A copy of the proposed budget is available for public inspection in the office of each of those governing bodies. A copy is also available for public inspection at the appraisal district office. Angie Cox Secretary of the Board of Directors Denton Central Appraisal District 3911 Morse Street Denton, Texas 76208 (940) 349-3800 40 1 DCAD Budget Planner CATEGORY 2025 Budget 2026 Budget 2025-2026 Difference % Change 5100 Personnel Services 5200 Education & Training $16,091,494.70 $16,818,502.40 $727,007.70 5110 5120 5130 5140 5150 5160 $261,130.00 $295,530.00 $34,400.00 5210 Memberships & Dues $38,130.00 $42,530.00 $4,400.00 5220 Training - Schools, Conferences & Travel $223,000.00 $253,000.00 $30,000.00 4.52% 2.79% 16.41% 0.78% 8.21% 14.15% 11.45% 13.17% 11.54% 0.00% 0.00% 20.00% 185.71% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 13.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% NEW 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Salaries $11,224,450.00 $11,537,300.00 $312,850.00 Longevity Pay $87,775.00 $102,175.00 $14,400.00 Social Security (FICA)$921,214.92 $928,418.80 $7,203.88 Retirement (TCDRS)$1,587,724.15 $1,718,032.11 $130,307.96 Workers' Comp Insurance $82,330.63 $93,976.49 $11,645.86 Group Health Insurance $2,188,000.00 $2,438,600.00 $250,600.00 TDLR Membership $5,300.00 $5,300.00 $0.00 TAAO Membership $10,500.00 $10,500.00 $0.00 TAAD Membership $2,500.00 $3,000.00 $500.00 IAAO Membership $2,100.00 $6,000.00 $3,900.00 NTCRA Dues $375.00 $375.00 $0.00 SHRM ($219), NTSHRM ($125) Membership $350.00 $350.00 $0.00 GFOAT, TML Memberships $300.00 $300.00 $0.00 GTOT Memberships $0.00 Metro CAD Membership $100.00 $100.00 $0.00 IAAO CEAA Dues $200.00 $200.00 $0.00 Denton/Wise Board of Realtors (MLS Dues)$825.00 $825.00 $0.00 TAAD/IAAO Chapter Membership (2 x $40)$80.00 $80.00 $0.00 Additional Miscellaneous Memberships $15,500.00 $15,500.00 $0.00 Learning Management Software $12,000.00 $12,000.00 $0.00 GIS Mapping Training $0.00 $0.00 $0.00 Customer Service Training $4,500.00 $4,500.00 $0.00 Cyber Security Training $0.00 $0.00 $0.00 CPR / First Aid / AED Training $3,000.00 $3,000.00 $0.00 TAAO Courses & CE's $33,830.00 $33,830.00 $0.00 TAAD Courses & CE's $11,470.00 $11,470.00 $0.00 IAAO Courses/Exams $0.00 $30,000.00 $30,000.00 PSI Exams $5,000.00 $5,000.00 $0.00 Reimbursement for College Tuition $10,000.00 $10,000.00 $0.00 Training & Development $50,500.00 $50,500.00 $0.00 TAAD Conference (plus BOD Members)$45,000.00 $45,000.00 $0.00 TAAO Conference $6,000.00 $6,000.00 $0.00 IAAO Conference $8,500.00 $8,500.00 $0.00 Legislative Update Seminar $7,000.00 $7,000.00 $0.00 Legal Update Seminar $6,500.00 $6,500.00 $0.00 Rural Chief Appraiser Conference $2,500.00 $2,500.00 $0.00 41 2 DCAD Budget Planner CATEGORY 2025 Budget 2026 Budget 2025-2026 Difference % Change GIS / Mapping Seminar $10,000.00 $10,000.00 $0.00 HR / Finance Seminar (TWC Conference)$2,500.00 $2,500.00 $0.00 ARB State Training ($50-renewing members/$100-new)$2,600.00 $2,600.00 $0.00 ARB Training with ARB Specialist $2,100.00 $2,100.00 $0.00 Appraisal Review Board $495,630.00 $495,630.00 $0.00 Oil, Gas, Heavy Industrial, and Utility (Wardlaw)$200,000.00 $215,920.00 $15,920.00 Legal Expenses Associated with Defending Values $640,000.00 $750,000.00 $110,000.00 Legal Expenses for ARB to Consult with ARB Attorney $10,000.00 $10,000.00 $0.00 Annual Independent Audit $25,000.00 $25,000.00 $0.00 Payroll Processing by Independent Company $30,000.00 $28,900.00 Dept #102 EA-True Roll $85,000.00 $165,000.00 $80,000.00 Dept #102 EA-QLess $0.00 $0.00 $0.00 Dept #102 EA-WaitWhile $10,000.00 $10,000.00 $0.00 Dept #102 EA-PublicationData.com $1,300.00 $1,300.00 $0.00 Dept #102 EA-Association of Records Management $205.00 $205.00 $0.00 Dept #102 EA-Lexis Nexis $4,680.00 $4,680.00 $0.00 Dept #102 EA-Just Appraised $78,000.00 $0.00 Dept #103 MAP-Just Appraised (Deeds/Permits)$115,500.00 $123,965.00 $8,465.00 Dept #105 OVERHEAD-Texas Co-op Purchasing Program $100.00 $100.00 $0.00 Dept #105 OVERHEAD-Street Level Photography-Cyclomedia $315,000.00 Dept #105 OVERHEAD-Pictometry Aerial Photography $168,000.00 $168,000.00 $0.00 Dept #105 OVERHEAD-Annual BOD Elections $0.00 $700,000.00 $700,000.00 Dept #201 COM-IREM Analysis Publications (Mem Dues)$325.00 $325.00 $0.00 Dept #201 COM-Marshall Valuation Service $731.00 $1,462.00 $731.00 Dept #201 COM-RERC Real Estate Report (Situs AMC)$500.00 $500.00 $0.00 Dept #201 COM-AI "The Appraisal of Real Estate"$185.00 $185.00 $0.00 Dept #201 COM-AI "The Dictionary of RE Appraisal"$175.00 $175.00 $0.00 Dept #201 COM-SourceStrategiesInc "TX Hotel Fact Bk"$300.00 $300.00 $0.00 Dept #201 COM-Appraisal Institute Golf Prop Analysis $75.00 $75.00 $0.00 Dept #201 COM-Costar Valuation Services $32,000.00 $53,000.00 $21,000.00 Dept #201 COM-Real Page (Apartment Lease Network)$7,400.00 $9,150.00 $1,750.00 Dept #201 COM-Cover Lease $0.00 $0.00 $0.00 0.00% 0.00% 0.00% 0.00% 10.72% 0.00% 0.00% 7.96% 7.96% 16.92% 17.19% 0.00% 0.00% 28.70% 94.12% 0.00% 0.00% 0.00% 0.00% 0.00% 7.33% 0.00% 0.00% NEW 0.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 65.63% 23.65% 0.00% 5300 Services Received $4,011,985.76 $4,442,046.76 $430,061.00 5310 Appraisal Review Board $495,630.00 $495,630.00 $0.00 5315 Oil, Gas, Heavy Industrial, and Utility (Wardlaw)$200,000.00 $215,920.00 $15,920.00 5325 Legal Services $650,000.00 $760,000.00 $110,000.00 5330 Audit & Payroll Services $55,000.00 $53,900.00 5340 Subscriptions & Contracts $1,076,122.00 $1,385,018.00 $308,896.00 ($1,100.00)-2.00% -3.67% -100.00% -100.00% ($1,100.00) ($78,000.00) ($315,000.00) 42 3 DCAD Budget Planner CATEGORY 2025 Budget 2026 Budget 2025-2026 Difference % Change Dept #201 COM-Compstak $35,000.00 $0.00 Dept #201 COM-Trepp $67,000.00 $67,000.00 $0.00 Dept #201 COM-Crexi $60,000.00 $60,000.00 Dept #201 COM-Just Appraised $80,000.00 $0.00 Dept #202 APPEALS-Legislative Tracking Portal $3,600.00 $3,600.00 $0.00 Dept #203 BPP-Jim Pritchard - Special Inventory Tax $0.00 $0.00 $0.00 Dept #203 BPP-Vehicle Registration List "Infonation"$7,150.00 $8,500.00 $1,350.00 Dept #203 BPP-Marshall & Swift - BPP Cost Handbook $731.00 $731.00 $0.00 Dept #203 BPP-Aircraft Bluebook.com $599.00 $954.00 $355.00 Dept #203 BPP-Price Digest All Access $0.00 $0.00 $0.00 Dept #203 BPP-Just Appraised $0.00 $0.00 $0.00 Dept #204 RES-Marshall & Swift - Residential Estimator $1,180.00 $1,180.00 $0.00 Dept #204 RES-Marshall & Swift - Res Cost Handbook $355.00 $1,100.00 $745.00 Dept #204 RES-Marshall Valuation Service $731.00 $731.00 $0.00 Dept #204 RES-NADA MFGD Housing Appraisal Guide $300.00 $300.00 $0.00 Dept #204 RES-Eagle Appraisal (AG)$2,500.00 Dept #204 RES-Data Cloud $60,000.00 $0.00 Auto Expense Reimbursement $765,293.50 $765,293.50 $0.00 Liability Coverage-Errors & Omissions (Public Officials)$22,869.60 $22,869.60 $0.00 Liability Coverage-General Liability $9,290.32 $9,290.32 $0.00 Property Coverage-Boiler & Machinery (Computer)-Included $0.00 $0.00 $0.00 Property Coverage-Real & Personal Prop (3911 Morse)$11,837.00 $11,837.00 $0.00 Property Coverage-Real & Personal Prop (3901 Morse)$3,945.00 $3,945.00 $0.00 Property Coverage-Flood & Earthquake $5,306.00 $5,306.00 $0.00 Cyber Liability-2 Million Limit $492.96 $492.96 $0.00 Medical Reimbursement-ARB $2,032.08 $2,032.08 $0.00 Medical Reimbursement-BOD $12.30 $12.30 $0.00 Appraisal Notices (Include Corrected & Agents)$174,000.00 $180,000.00 $6,000.00 Letter Requesting Sales Information $6,000.00 $6,000.00 $0.00 Application for Residential Homestead EX Forms $7,800.00 $7,800.00 $0.00 BPP Rendition Forms $7,000.00 $7,000.00 $0.00 SB2 Postcards $0.00 $0.00 $0.00 Copies for ARB Protest (Impress Graphics)$0.00 $0.00 $0.00 Printing Mineral & Industrial Notices $4,500.00 $4,500.00 $0.00 Copies for ARB Protest $12,000.00 $12,000.00 $0.00 Print, Fold & Insert ARB Materials (Impress Graphics)$0.00 $0.00 $0.00 ($35,000.00) ($80,000.00) ($60,000.00) -100.00% -100.00% -100.00% 0.00% NEW 0.00% 0.00% 18.88% 0.00% 59.27% 0.00% 0.00% 0.00% 209.86% 0.00% 0.00% NEW 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.78% 3.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5345 Auto Expense Reimbursement $765,293.50 $765,293.50 $0.00 5350 Auto General Insurance $55,785.26 $55,785.26 $0.00 5360 Printing Service $215,800.00 $221,800.00 $6,000.00 43 4 DCAD Budget Planner CATEGORY 2025 Budget 2026 Budget 2025-2026 Difference % Change Misc Printing $4,500.00 $4,500.00 $0.00 Appraisal Notices (Include Corrected & Agents)$256,800.00 $256,800.00 $0.00 Letter Requesting Sales Information $15,000.00 $15,000.00 $0.00 Application for Residential Homestead EX Forms $12,000.00 $12,000.00 $0.00 BPP Rendition Forms $14,000.00 $14,000.00 $0.00 Annual Maintenance on Postage Meter $2,000.00 $2,000.00 $0.00 Mineral & Utility Notices (Wardlaw Postage)$10,000.00 $10,000.00 $0.00 SB2 Postcards $0.00 $0.00 $0.00 General Correspondence (see list in budget doc)$110,400.00 $110,400.00 $0.00 Postage Box Rentals $2,800.00 $2,800.00 $0.00 5380 Legal Notices & Advertising $10,500.00 $6,000.00 Paper-Copiers & Printers $15,120.00 $12,000.00 Envelopes-Mailings from Office $10,260.00 $8,500.00 Envelopes-Return Envelopes $6,825.00 $5,800.00 Misc-Tape/Erasers/Staplers/Pens/Pencils/File Folders/Etc.$8,500.00 $9,000.00 $500.00 Business Cards-New Hires $750.00 $1,000.00 $250.00 Stamps / ARB Signs / Door Signage $5,000.00 $5,000.00 $0.00 Comptroller Publications-Tax Code & Law Books $1,600.00 $1,600.00 $0.00 Certified Laser Forms $0.00 $0.00 $0.00 Xerox Printer Copies $16,800.00 $16,800.00 $0.00 Maintenence on Generators $10,000.00 $6,000.00 Ice Maker Maintenance $2,000.00 $2,000.00 $0.00 Fire Protection Maintenance $2,700.00 $2,700.00 $0.00 Misc Equipment Repairs $3,000.00 $3,000.00 $0.00 Hardware Infrastructure-Firewalls & Switches $27,500.00 $27,500.00 $0.00 Hardware Power-Battery Backup Units (UPS)$34,500.00 $34,500.00 $0.00 Hardware Infrastructure-Cabling and electrical $13,200.00 $13,200.00 $0.00 Hardware Backup-Backup & Storage Maintenance $36,000.00 $36,000.00 $0.00 Hardware Infrastructure-Server Hardware include Nutanix $4,000.00 $4,000.00 $0.00 Hardware Mobile-Field Device Maintenance $48,000.00 $48,000.00 $0.00 Hardware Desktop-Desktop & Laptop Replacements $93,100.00 $93,100.00 $0.00 Hardware Desktop-Monitor Replacements $46,700.00 $46,700.00 $0.00 Hardware Building-Video Surveillance $80,000.00 $80,000.00 $0.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -7.95% -20.63% -17.15% -15.02% 5.88% 33.33% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5370 Postage & Freight $423,000.00 $423,000.00 $0.00 5380 Legal Notices & Advertising $10,500.00 $6,000.00 5390 Office Supplies $64,855.00 $59,700.00 $2,563,607.00 $2,233,038.00 5410 Office Equipment & Maintenance $17,700.00 $13,700.00 5420 Information Technology Maintenance $2,182,995.00 $1,844,178.00 ($4,500.00) ($5,155.00) ($330,569.00) ($4,000.00) ($338,817.00) -42.86% -42.86% -12.89% -22.60% -40.00% -15.52% ($4,500.00) ($3,120.00) ($1,760.00) ($1,025.00) ($4,000.00) 5400 Utilities & Maintenance 44 5 DCAD Budget Planner CATEGORY 2025 Budget 2026 Budget 2025-2026 Difference % Change Hardware-14 NEW FTE'S X $11,000 $154,000.00 $0.00 Hardware Infrastructure-IP Phone System $0.00 $0.00 $0.00 Services Cloud Services-AWS Storage $39,000.00 $39,000.00 $0.00 Services Cloud Services-AWS Compute $150,000.00 $150,000.00 $0.00 Services Scanning & OCR-Including DocuScan $42,100.00 $42,100.00 $0.00 Services Power-Generator Services & Repairs(From 5410)$36,000.00 $0.00 Services Programing-PACS Upgrades $0.00 $0.00 $0.00 Software-Harris Govern-PACS $370,000.00 $0.00 Software-True Prodigy CAMA $649,330.00 $904,763.00 $255,433.00 Software-Pictometry Interface Maintenance $2,550.00 $2,550.00 $0.00 Software-Microsoft Enterprise Licensing Agreement $148,500.00 $148,500.00 $0.00 Software-Endpoint Protection-Antivirus Maint.$10,600.00 $10,600.00 $0.00 Software-Server Software Maint. - Hive $26,865.00 $26,865.00 $0.00 Software-HelpDesk Maintenance $13,750.00 $16,000.00 $2,250.00 Software-Google Services $29,000.00 $35,000.00 $6,000.00 Software-Cyber Security Upgrades(NEW 2025)$50,000.00 $60,000.00 $10,000.00 Software-Address Pro Certification $3,900.00 $3,900.00 $0.00 Software-QAS Maintenance $4,400.00 $4,400.00 $0.00 Software-GIS Maintenance $15,000.00 $15,000.00 $0.00 Software-New Accounting Software $55,000.00 $2,500.00 3911 Morse $58,317.00 $59,483.00 $1,166.00 3901 Morse $27,090.00 $27,632.00 $542.00 Frontier-Voice PRI $10,440.00 $10,440.00 $0.00 Navitas-Phone $32,400.00 $31,440.00 Charter/Spectrum-Internet $31,200.00 $31,200.00 $0.00 Frontier-Back-up Analog Lines,Faxes & Security Lines $3,120.00 $3,120.00 $0.00 AT&T-Language Interpreting Line $600.00 $800.00 $200.00 Verizon Wireless-Lines for Mobile Devices(iPads)$30,120.00 $30,120.00 $0.00 Misc. Telephone Expense $3,000.00 $3,400.00 $400.00 Vested Networks-ARB Lines $2,700.00 $1,800.00 Bldg Cleaning & Exterminating-Janitorial 2 Buildings $48,000.00 $48,000.00 $0.00 Bldg Cleaning & Exterminating-Janitorial Supplies 2 Buildings $13,200.00 $15,000.00 $1,800.00 Bldg Cleaning & Exterminating-Mo. Exterminating Interior 2 Bldgs $3,000.00 $3,000.00 $0.00 Bldg Cleaning & Exterminating-Special Exterminating Interior 2 Bldgs $970.00 $970.00 $0.00 Bldg Cleaning & Exterminating-Termite Treatment 3901 $485.00 $485.00 $0.00 Bldg Maintenance-A/C & Heat-Monthly Maint 3911 $8,880.00 $8,880.00 $0.00 ($154,000.00) ($36,000.00) ($370,000.00) ($52,500.00) ($960.00) ($900.00) -100.00% -100.00% -100.00% -95.45% -1.11% -2.96% -33.33% 0.00% 0.00% 0.00% 0.00% 0.00% 39.34% 0.00% 0.00% 0.00% 0.00% 16.36% 20.69% 20.00% 0.00% 0.00% 0.00% 2.00% 2.00% 2.00% 0.00% 0.00% 0.00% 33.33% 0.00% 13.33% 7.20% 0.00% 13.64% 0.00% 0.00% 0.00% 0.00% 5430 Electricity, Water, Sewer & Solid Waste $85,407.00 $87,115.00 $1,708.00 5440 Telephone $113,580.00 $112,320.00 5450 Building & Grounds Maintenance $163,925.00 $175,725.00 $11,800.00 ($1,260.00) 45 6 DCAD Budget Planner CATEGORY 2025 Budget 2026 Budget 2025-2026 Difference % Change Bldg Maintenance-A/C & Heat-Monthly Maint 3901 $4,800.00 $4,800.00 $0.00 Bldg Maintenance-A/C & Heat-Summer Winter Change Over $2,000.00 $2,000.00 $0.00 Bldg Maintenance-A/C & Heat-Additional Service $8,000.00 $8,000.00 $0.00 Bldg Maintenance-A/C & Heat-Emergency HVAC Repairs $20,000.00 $30,000.00 $10,000.00 Bldg Maintenance-Building, Electrical & Plumbing Maint $12,000.00 $12,000.00 $0.00 Bldg Maintenance-Alarm-Fire Alarm Annual Inspection $1,200.00 $1,200.00 $0.00 Bldg Maintenance-Alarm-Burglar Alarm Maint & Monitoring $2,600.00 $2,600.00 $0.00 Bldg Maintenance-Alarm-Fire Alarm Maint & Monitoring $4,800.00 $4,800.00 $0.00 Bldg Maintenance-Fire Extinguisher Maint $220.00 $220.00 $0.00 Bldg Maintenance-Lock Work $2,000.00 $2,000.00 $0.00 Bldg Maintenance-Total Various Building Repairs $5,000.00 $5,000.00 $0.00 Bldg Maintenance-Roof Repairs $7,500.00 $7,500.00 $0.00 Grounds & Parking Maint-Lawn 3911 $7,920.00 $7,920.00 $0.00 Grounds & Parking Maint-Lawn 3901 $5,400.00 $5,400.00 $0.00 Grounds & Parking Maint-Lawn (Trees Trimmed, Flowers)$3,500.00 $3,500.00 $0.00 Grounds & Parking Maint-Purchase of Flags $250.00 $250.00 $0.00 Grounds & Parking Maint-Striping Parking Lot $1,500.00 $1,500.00 $0.00 Grounds & Parking Maint-Fertilizer & Insecticide $700.00 $700.00 $0.00 Dept 100 Business Operations-Replacement Desk & Chairs $1,000.00 $1,000.00 $0.00 Dept 100 Business Operations-Misc (Scanners,Staplers,Etc.)$500.00 $500.00 $0.00 Dept 106 Training & Development-Replacement Desk & Chairs $1,300.00 $1,300.00 $0.00 Dept 106 Training & Development-Misc (Scanners,Staplers,Etc.)$200.00 $200.00 $0.00 Dept 101 Administration-Replacement Desk & Chairs $2,500.00 $2,500.00 $0.00 Dept 101 Administration-Misc (Scanners,Staplers,Etc.)$2,000.00 $2,000.00 $0.00 Dept 102 Exemptions & Asst-Replacement Desk & Chairs $8,250.00 $8,250.00 $0.00 Dept 102 Exemptions & Asst-Misc (Scanners,Staplers,Etc.)$2,500.00 $2,500.00 $0.00 Dept 103 Mapping-Replacement Desk & Chairs $6,300.00 $6,300.00 $0.00 Dept 103 Mapping-Misc (Scanners,Staplers,Etc.)$2,000.00 $2,000.00 $0.00 Dept 104 Info & Tech-Replacement Desk & Chairs $5,300.00 $5,300.00 $0.00 Dept 104 Info & Tech-Misc (Scanners,Staplers,Etc.)$2,000.00 $2,000.00 $0.00 Dept 105 Overhead-Audio Video Equipment $5,000.00 $5,000.00 $0.00 Dept 105 Overhead-ARB Equipment $4,000.00 $4,000.00 $0.00 Dept 105 Overhead-Projectors/PCs $3,000.00 $3,000.00 $0.00 Dept 105 Overhead-Misc $2,000.00 $2,000.00 $0.00 Dept 201 Commercial-Replacement Desk & Chairs $5,000.00 $5,000.00 $0.00 Dept 201 Commercial-Misc (Scanners,Staplers,Etc.)$2,000.00 $2,000.00 $0.00 Dept 202 Appeals-Replacement Desk & Chairs $4,000.00 $4,000.00 $0.00 Dept 202 Appeals-Misc (Scanners,Staplers,Etc.)$2,000.00 $2,000.00 $0.00 0.00% 0.00% 0.00% 50.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5500 Capital Outlay $334,850.00 $325,850.00 5510 Furniture & Equipment $84,850.00 $75,850.00 ($9,000.00) ($9,000.00) -2.69% -10.61% 46 7 DCAD Budget Planner CATEGORY 2025 Budget 2026 Budget 2025-2026 Difference % Change Dept 203 BPP-Replacement Desk & Chairs $4,000.00 $4,000.00 $0.00 Dept 203 BPP-Misc (Scanners,Staplers,Etc.)$2,000.00 $2,000.00 $0.00 Dept 204 Residential-Replacement Desk & Chairs $15,000.00 $6,000.00 Dept 204 Residential-Misc (Scanners,Staplers,Etc.)$3,000.00 $3,000.00 $0.00 Building & Land Improvements-New Facility Exploration $250,000.00 $250,000.00 $0.00 Contingency $101,739.00 $119,108.00 $17,369.00 Miscellaneous $2,500.00 $2,500.00 $0.00 Reimbursing Unemployment $7,500.00 $3,000.00 Coffee, Cups, Plates, Kitchen Supplies & Misc.$7,000.00 $7,000.00 $0.00 New Hire Background Checks $1,200.00 $1,200.00 $0.00 Monthly Service Fee - Bank $1,800.00 $1,800.00 $0.00 Monthly Service Fee - Time Clock $10,260.00 $15,600.00 $5,340.00 Employee Perfect Attendance in Protest $0.00 $0.00 $0.00 MVP Per Department $0.00 $0.00 $0.00 Employee Post Protest Gift Certificate $12,900.00 $12,500.00 Employee Holiday Gift Certificates $19,350.00 $18,750.00 Employee Thank You Luncheons $6,000.00 $3,600.00 Employee Service Recognition $2,450.00 $2,000.00 Entity Luncheons $2,400.00 $2,400.00 $0.00 Seasonal Labor (Temp)$260,000.00 $260,000.00 $0.00 Denton PD Officers - Protest Season $20,000.00 $20,000.00 $0.00 Facility Expansion Opportunity Copier Lease (Workroom & Customer Service)$22,620.00 $27,600.00 $4,980.00 Printer Lease $40,476.00 $44,172.00 $3,696.00 Postage Machine Lease $4,389.72 $4,389.72 $0.00 Folder/Inserter Lease $5,028.00 $5,028.00 $0.00 Quadient Lease (New for 2025) Appeals Letters Processing $30,961.44 $30,961.44 $0.00 Reserve Funds 0.00% 0.00% 0.00% 0.00% 0.00% 3.16% 17.07% 17.07% 0.00% 0.00% 0.00% 0.00% 52.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 8.38% 0.00% 0.00% 8.38% 22.02% 9.13% 0.00% 0.00% 0.00% 3.67% $728,031.22 3.27% 0 00% ($9,000.00) ($4,500.00) ($400.00) ($600.00) ($2,400.00) ($450.00) $1,561,127.54 $1,708,031.02 -60.00% -4.10% -60.00% -3.10% -3.10% -40.00% -18.37% 5520 Building & Land Improvements $250,000.00 $250,000.00 $0.00 $455,099.00 $469,458.00 $14,359.00 5610 Contingency $101,739.00 $119,108.00 $17,369.00 5620 Miscellaneous $73,360.00 $70,350.00 5630 Seasonal Labor $280,000.00 $280,000.00 $0.00 $103,475.16 $112,151.16 $8,676.00 5910 Facility Expansion Opportunities $0.00 $0.00 5920 Equipment Payments $103,475.16 $112,151.16 $8,676.00 TOTAL $23,821,641.62 $24,696,576.32 $874,934.70 Balance $22,260,514.08 $22,988,545.30 5600 Miscellaneous 5900 Debt Service ($3,010.00) 47 2024 %2026 EST. TAX LEVY TOTAL BUDGET JURISDICTIONS Certified/$100,000 LEVIES ALLOCATIONS 22,988,545.30$ SCHOOL DISTRICTS: S01 ARGYLE ISD 65,674,321.88 2.0842%$479,137.74 S02 AUBREY ISD 39,352,904.49 1.2489%$287,105.54 S03 CARROLLTON-FB ISD 57,743,916.14 1.8326%$421,280.17 S04 CELINA ISD 3,833,678.65 0.1217%$27,969.23 S05 DENTON ISD 378,411,405.76 12.0093%$2,760,762.23 S06 FRISCO ISD 194,933,962.10 6.1864%$1,422,172.57 S07 KRUM ISD 23,764,217.83 0.7542%$173,375.73 S08 LAKE DALLAS ISD 39,650,352.26 1.2583%$289,275.62 S09 LEWISVILLE ISD 638,403,213.58 20.2604%$4,657,574.94 S10 LITTLE ELM ISD 97,843,078.39 3.1052%$713,830.16 S11 NORTHWEST ISD 228,547,521.30 7.2532%$1,667,405.78 S12 PILOT POINT ISD 12,948,005.21 0.4109%$94,464.29 S13 PONDER ISD 14,152,080.10 0.4491%$103,248.81 S14 SANGER ISD 25,375,386.78 0.8053%$185,130.28 S15 ERA ISD 1,363.08 0.0000%$9.94 S16 SLIDELL ISD 667,895.55 0.0212%$4,872.74 S17 PROSPER ISD 54,811,672.58 1.7395%$399,887.51 SCHOOL DISTRICTS TOTALS 1,876,114,975.68 59.5405%$13,687,503.28 G01 DENTON COUNTY 355,813,572.94 11.2921%$2,595,896.05 DENTON CAD 2026 ESTIMATED BUDGET ALLOCATIONS Based on 2024 Certified Levy. Uses $1,708,031.02 from Reserves The 2026 proposed budget allocations are estimated amounts. 2024 Certified levies are used for calculation purposes. Please be aware that allocations will change for each entity based on the increases/decreases to their 2025 actual levies upon certification. 48 2024 %2026 EST. TAX LEVY TOTAL BUDGET JURISDICTIONS Certified/$100,000 LEVIES ALLOCATIONS 22,988,545.30$ CITIES: C26 TOWN OF ARGYLE 5,243,027.85 0.1664%$38,251.37 C01 CITY OF AUBREY 5,417,579.06 0.1719%$39,524.83 C31 TOWN OF BARTONVILLE 1,230,886.43 0.0391%$8,980.13 C02 CITY OF CARROLLTON 67,706,583.01 2.1487%$493,964.44 C49 CITY OF CELINA 7,844,726.08 0.2490%$57,232.48 C03 CITY OF THE COLONY 51,299,340.21 1.6280%$374,262.72 C21 TOWN OF COPPELL 1,146,465.63 0.0364%$8,364.23 C27 TOWN OF COPPER CANYON 1,799,333.55 0.0571%$13,127.33 C04 CITY OF CORINTH 18,804,366.34 0.5968%$137,190.33 C20 CITY OF DALLAS 16,959,752.07 0.5382%$123,732.64 C05 CITY OF DENTON 121,511,703.72 3.8563%$886,508.49 C42 TOWN OF DISH 229,802.25 0.0073%$1,676.56 C30 TOWN OF DOUBLE OAK 1,303,943.09 0.0414%$9,513.13 C47 TOWN OF CORRAL CITY 29,938.96 0.0010%$218.42 C07 TOWN OF FLOWER MOUND 63,454,826.24 2.0138%$462,945.05 C36 CITY OF FORT WORTH 51,610,843.95 1.6379%$376,535.34 C32 CITY OF FRISCO 81,844,800.22 2.5974%$597,112.11 C39 CITY OF GRAPEVINE 306.38 0.0000%$2.24 C22 TOWN OF HACKBERRY 228,478.68 0.0073%$1,666.90 C38 CITY OF HASLET 3,218.15 0.0001%$23.48 C19 TOWN OF HICKORY CREEK 2,634,384.89 0.0836%$19,219.59 C08 CITY OF HIGHLAND VILLAGE 16,892,013.38 0.5361%$123,238.44 C09 CITY OF JUSTIN 6,546,518.74 0.2078%$47,761.20 C18 CITY OF KRUGERVILLE 1,475,331.88 0.0468%$10,763.52 C10 CITY OF KRUM 4,868,975.64 0.1545%$35,522.41 C11 CITY OF LAKE DALLAS 4,339,853.40 0.1377%$31,662.11 C25 CITY OF LAKEWOOD VILLAGE 723,384.86 0.0230%$5,277.57 C12 CITY OF LEWISVILLE 93,286,509.19 2.9605%$680,586.97 C13 TOWN OF LITTLE ELM 47,202,830.20 1.4980%$344,375.96 C45 CITY OF NEW FAIRVIEW 164,216.87 0.0052%$1,198.07 C33 TOWN OF NORTHLAKE 9,669,065.95 0.3069%$70,542.25 C24 CITY OF OAK POINT 5,031,372.81 0.1597%$36,707.20 C14 CITY OF PILOT POINT 4,795,191.43 0.1522%$34,984.10 C29 CITY OF PLANO 7,234,194.18 0.2296%$52,778.25 C15 TOWN OF PONDER 2,371,697.72 0.0753%$17,303.11 C48 CITY OF PROSPER 14,637,192.29 0.4645%$106,788.03 C51 TOWN OF PROVIDENCE VILLAGE 5,894,070.34 0.1871%$43,001.15 C17 CITY OF ROANOKE 11,798,191.28 0.3744%$86,075.63 C16 CITY OF SANGER 9,473,036.62 0.3006%$69,112.09 C34 TOWN OF SHADY SHORES 1,671,648.80 0.0531%$12,195.79 C37 CITY OF SOUTHLAKE 830,182.93 0.0263%$6,056.74 C28 CITY OF TROPHY CLUB 12,005,186.50 0.3810%$87,585.80 C44 CITY OF WESTLAKE 305,951.53 0.0097%$2,232.12 CITIES TOTALS 761,520,923.30 24.1677%$5,555,800.32 49 2024 %2026 EST. TAX LEVY TOTAL BUDGET JURISDICTIONS Certified/$100,000 LEVIES ALLOCATIONS 22,988,545.30$ SPECIAL DISTRICTS: DESD1 DENTON CO ESD #1 7,377,914.46 0.2341%$53,826.78 DESD2 DENTON CO ESD #2 12,814,983.62 0.4067%$93,493.81 ESD2 TROPHY CLUB PID #1 EM SER 568,048.43 0.0180%$4,144.29 W04 CLEARCREEK WATERSHED AUTH 450,938.62 0.0143%$3,289.90 L01 DEN CO LEVY IMPR DIST #1 1,687,558.55 0.0536%$12,311.86 MMD1 HIGHWAY 380 MUN MAN DIST 7,092,775.19 0.2251%$51,746.50 MMD3 NORTHLAKE MUN. MAN. DIST. #1 6,070,403.25 0.1927%$44,287.62 MMD4 NORTHLAKE MUN. MAN. DIST. #2 1,957,465.93 0.0621%$14,281.01 W03 TROPHY CLUB MUD #1 1,252,525.18 0.0398%$9,138.00 W13 DCFWSD #6 8,006,869.87 0.2541%$58,415.43 W17 ELM RIDGE WCID OF DENTON CO 23,919,233.76 0.7591%$174,506.68 W18 DCFWSD #8A 2,988,717.07 0.0949%$21,804.67 W19 DCFWSD #8B 1,743,287.52 0.0553%$12,718.44 W20 DCFWSD #11A 5,358,396.37 0.1701%$39,093.06 W21 DCFWSD #7 8,613,982.86 0.2734%$62,844.72 W22 DENTON CO MUD #4 1,525,676.07 0.0484%$11,130.82 W23 DENTON CO MUD #5 1,496,953.25 0.0475%$10,921.27 W24 FRISCO WEST WCID 5,120,331.65 0.1625%$37,356.22 W25 DCFWSD #11B 3,995,994.92 0.1268%$29,153.43 W26 DCFWSD #4A 864,394.30 0.0274%$6,306.33 W27 OAK POINT WATER CONT. #1 787,016.75 0.0250%$5,741.81 W28 OAK POINT WATER CONT. #2 516,102.66 0.0164%$3,765.31 W29 OAK POINT WATER CONT. #3 675,267.96 0.0214%$4,926.53 W30 SMILEY RD WCID #1 2,298,696.98 0.0730%$16,770.52 W32 DCFWSD #11C 1,535,391.13 0.0487%$11,201.70 W33 NORTH FT WORTH WCID NO 1 282,236.20 0.0090%$2,059.10 W37 BROOKFIELD WCID 2,139,660.99 0.0679%$15,610.25 W38 ALPHA RANCH FWSD NO 1 1,299,063.62 0.0412%$9,477.53 W39 BELMONT FWSD NO 1 8,272,234.86 0.2625%$60,351.44 W41 THE LAKES FWSD 11,781,121.19 0.3739%$85,951.09 W42 CANYON FALLS WCID #2 3,748,775.12 0.1190%$27,349.80 W43 OAK POINT WATER CONT. #4 1,061,972.51 0.0337%$7,747.79 W44 CANYON FALLS MUD NO 1 1,788,452.20 0.0568%$13,047.95 W45 BELMONT FWSD NO 2 3,029,540.22 0.0961%$22,102.51 W47 DENTON CO MUD #6 7,233,175.96 0.2296%$52,770.82 W49 DENTON CO MUD #9 730,515.18 0.0232%$5,329.59 W54 DENTON CO MUD #10 0.00 0.0000%$0.00 W55 BIG SKY MUD 1,403,176.42 0.0445%$10,237.10 W57 DENTON CO MUD NO 8 1,661,426.09 0.0527%$12,121.21 W59 TRADITION MUD DENTON CO NO 2B 2,821,621.88 0.0895%$20,585.60 W63 CLEAR SKY MUD 181,139.48 0.0057%$1,321.53 W66 TALLEY RANCH WCID NO 1 22,139.91 0.0007%$161.53 W67 PRAIRIE OAKS MUD OF DENTON CO 405,457.40 0.0129%$2,958.08 W68 DENTON CO MUD NO 16 329,865.85 0.0105%$2,406.59 W69 LEGENDS RANCH MUD OF DENTON CO 64,099.87 0.0020%$467.65 50 W70 ROCKY TOP RANCH MUD OF DENTON CO 150,133.04 0.0048%$1,095.32 W74 HIGH POINTE RANCH MUD #1 304,851.89 0.0097%$2,224.10 W77 TRADITION MUD DENTON CO NO 2C 108,610.30 0.0034%$792.38 SPECIAL DISTRICTS TOTALS 157,538,196.53 4.9996%$1,149,345.67 GRAND TOTALS 3,150,987,668.45 100.0000%$22,988,545.30 51 May 2, 2025 Report No. 2025-043 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Solid Waste Services at Denton Enterprise Airport EXECUTIVE SUMMARY: The provision of solid waste services at Denton Enterprise Airport is complicated due to the unique conditions of the airport property ownership and leasing, as well as the evolving needs of the tenants. The historical solid waste model created inequities between tenants, placing unnecessary costs on the airport, and encouraged illegal dumping across and around the airport property. In response, the airport has implemented a new service model where tenants will either receive individual dumpster services if space allows or pay for access to shared dumpster service based on their weekly waste volume. Moving forward, the shared dumpster rates will be clarified in the solid waste rates ordinance and fee schedule, and enhancements will be made to the shared site, including security features. BACKGROUND: The provision of solid waste services at Denton Enterprise Airport is somewhat complex due to the unique properties and uses present. All development at the airport occurs through a ground lease, with the City of Denton retaining ownership of the property. Many of these leases have existed for decades, with property uses and solid waste needs evolving. As the airport has grown, many existing hangars that initially served as aircraft storage have been upgraded to support aeronautical business operations. While this trend benefits the airport, it also increases the demand for solid waste services. Until this fiscal year, most buildings at the airport received solid waste services in one of two ways: 1.A dumpster was placed on-site at the building location under the utility account of thebuilding occupant; or2.Tenants and users utilized two on-airport dumpsters managed and funded by the airportwith no service cost recovery present. DISCUSSION: This framework presented several challenges. First, the airport funded solid waste services for some but not all airport users despite provisions in airport lease agreements stating that solid waste service is the tenant's responsibility. The cost to the airport was approximately $13,000 annually. This situation creates a clear inequity in obligations among airport tenants. Second, the dumpsters became a site for regular dumping of non-airport refuse by both airport users and non-airport users. The cost of addressing this illegal dumping fell on the city. Due to a significant increase in illegal dumping, the airport decided to remove the airport-funded dumpsters and reassess the provision of solid waste services. 52 May 2, 2025 Report No. 2025-043 Solution A plan has been developed to provide a sustainable solid waste solution for all airport tenants in collaboration between Denton Enterprise Airport, Solid Waste and Recycling, and Customer Service. Where feasible, leaseholds requiring solid waste service and having the space to accommodate and maintain a dumpster will, like any commercial customer, work with Customer Service to rent a dumpster, place it at the service location, and receive services. For tenants who cannot physically accommodate a dumpster or whose volume does not generally justify dumpster service, the airport will offer a shared dumpster service model, similar to other shared service dumpsters across the City. In this model, tenants will request access to a shared dumpster, located and secured on airport property, and pay a per-cubic-yard rate based on their anticipated refuse volume (with a minimum charge for one cubic yard of weekly refuse). The shared dumpster would be located in a common area, but access would be restricted to those who pay for the service. This solution is scalable, depending on the overall need for solid waste services at the airport, and equitable since each airport tenant will manage their solid waste service through their utility account with the City of Denton. Next Steps While the per-cubic-yard rate is based on the city’s current dumpster rate, Solid Waste and Recycling will include a specific shared dumpster rate in its budget proposal that outlines the per-cubic-yard costs. Once this service model is in place, the airport will enhance the shared dumpster site by adding screening walls and a security gate managed through the airport’s security access system. CONCLUSION: This new solid waste service model will provide all airport tenants a scalable, sustainable, and equitable solution. ATTACHMENTS: 1. None STAFF CONTACT: Ryan Adams Airport Director Ryan.Adams@cityofdenton.com (940) 349-7744 53 May 2, 2025 Report No. 2025-043 Brian Boerner Solid Waste and Recycling Director Brian.Boerner@cityofdenton.com (940) 349-8001 REQUESTOR: Staff Initiated STAFF TIME TO COMPLETE REPORT: 2 PARTICIPATING DEPARTMENTS: Airport Solid Waste and Recycling 54 May 2, 2025 Report No. 2025-044 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Hickory Creek Phase 3 capital project BACKGROUND: Hickory Creek Road between Country Club Road (FM 1830) and the existing at-grade railroad crossing with Kansas City Southern Railroad (KCS) was identified as a safety concern. Temporary improvements were made to the road, but significant reconstruction was required to keep the road in service. A re-alignment was determined to be the best solution for the corridor. The Hickory Creek Road Phase 3 project aims to provide a safer and more direct extension from Hickory Creek Road Phase 2 to FM 1830/Country Club Road. Project Scope Hickory Creek Road Phase 3 realignment will create a safer, shorter, and more direct route between Riverpass Dr and FM1830. The new Hickory Creek Road bridge will span approximately 2,500 feet over the floodway reducing roadway flooding and over the Canadian Pacific Kansas City (CPKC) railway (formerly KCS) to separate the at-grade rail/road traffic. Phase 3 will widen the existing alignment from 2-lanes to 4 lanes to provide increased roadway capacity and the new road/bridge section will include street illumination and 10-foot sidewalks. Project History On Feb. 12, 2019, the City executed a design contract for Hickory Creek Road Phase 3. In Nov. 5, 2019, the 2019 Bond Election passed providing $34M for Hickory Creek Road Phase 3. Preliminary road designs were submitted to the railroad on Feb. 19, 2021; the road/bridge designs were completed/signed/sealed on Nov. 5, 2021; KCS approved the design on Feb. 4, 2022. Twelve (12) real estate parcels were identified as being needed, several utilities were identified as being in conflict, and the KCS railroad agreement coordination was underway. Due to escalating construction prices, a decision was made to bid the project to secure the best possible bids with the known risks of not having a “fully clear” project to construct. The project was bid for construction on Jan. 14, 2022, and bids were received from three (3) bidders. On May 3, 2022, the contract was awarded to Mario Sinacola for $52,022,433.88 (including the standard 5% contingency). Real Estate, Utilities, and Railroad conflicts continued making progress. Eleven (11) of the twelve (12) parcels were acquired by September 2022, but the twelfth parcel could not be negotiated and required Eminent Domain. The Contractor was 55 May 2, 2025 Report No. 2025-044 issued a Notice to Proceed (NTP) on Sept. 28, 2022, to begin the project as utility clearance, railroad coordination, and real estate acquisition continued. The bridge design was modified to clear direct impact with two gas lines to allow the project to proceed. Railroad agreement review/coordination with Oncor continued overhead electric conflicts. To allow more time, a modified Notice to Proceed was issued for Feb. 13, 2023, and construction began. In March 2023, two (2) years after KCS approved the road/bridge design and almost approving the railroad agreement, an international merger with KCS and Canadian Pacific Railroad (CP) took place. On Apr. 14, 2023, KCS merged with Canadian Pacific creating the Canadian Pacific Kansas City (CPKC) railroad. The merger brought the nearly approved railroad agreement to a halt and required a restart of negotiations with the newly formed CPKC. On Sept. 12, 2023, road/bridge construction stopped due to work inefficiencies around the Railroad, Oncor Electric lines (which also required railroad coordination), and the need for the final right-of-way parcel. Despite these challenges, significant progress was made in mid-2024 thru March 2025, specifically: on July 26, 2024, the final parcel was acquired; on Dec. 6, 202,4 the Oncor Electric lines were cleared; on Dec. 17, 2024, City Council approved the Railroad Agreement; on Dec. 19, 2024, developer-related coordination was complete; on Mar. 3, 2025, CPKC executed the Railroad Agreement; on Mar. 5, 2025, TxDOT approved the access permit for work on FM1830; and on Mar. 13, 2025 a gas foam line conflict was removed clearing all direct utility conflicts. Two (2) gas lines requiring relocation remain but are not directly impacted by construction. Capital Projects is actively working on finalizing the terms of the agreements and relocations. On Mar. 6, 2025, the City met with the Contractor who is looking forward to resuming work with the approval of the Change Order addressing the escalations. DISCUSSION: Proposed Change Order The Original Change Order as proposed exceeded $12.5M. Staff negotiated with the contractor to the current proposal of a not-to-exceed amount of $9,891,549.22 which resulted in approximately 21% ($2.7M) lower than the original proposal. The proposed Change Order amount of $9,891,549.22 is 15% of the original Not to Exceed amount. The Change Order will cover the following cost increases: Labor Escalation, Equipment Escalation, Material Escalation, Subcontractor Escalation, AFCO Steel Freight and Storage, 1% Bond, Extended Overhead and Delay Time for Project Manager, Extended Project Survey Time, Outside Equipment Rent, Structural Inefficiencies – Working on columns adjacent to power lines, Reestablish Construction Site & Creek Crossing, and Traffic Control/Barricades. 56 May 2, 2025 Report No. 2025-044 The most significant cost increase item is Equipment Escalation which makes up approximately $5M (46%) of the proposed change order. The original bid included company-owned equipment. Due to the project delay, that equipment is no longer available as it is being used for another project. An equipment escalation cost is now required to pay for the needed equipment rentals. All invoices related to material, labor, and equipment will be reviewed and monitored for compliance with the quotes provided in the Change Order Proposal. The change order funding is proposed to use $1,977,258.76 of the existing $2,477,258.76 project contingency leaving $500,000 of the original contingency to manage future change orders efficiently and quickly to minimize possible delays. In addition to using the existing $1,977,258.76 contingency, the change order will require an additional $7,914,290.46. Sources for the funds are identified and shown below: CHANGE ORDER FUNDING SUMMARY Change Order Proposed Change Order Amount $ 9,891,549.22* Use of Original 5% Contract Contingency (Original Contingency $2,477,258.76) $ 1,977,258.76 New Funding from existing budget $ 7,914,290.46 CHANGE ORDER FUNDING SUMMARY (cont’d) Funding Source 2019 GO Bond Election $ 1,885,261.00 Streets/Traffic – GO $ 1,361,532.00 Roadway Impact Fees Fund $ 449,754.00 Streets/Traffic – CO $ 6,195,002.22 Total Request to Encumber (Change Order Amount): $ 9,891,549.22 57 May 2, 2025 Report No. 2025-044 Cost Analysis The Proposed change order amount is 15% ($7,914,290.46) greater than the Existing Not-to- Exceed amount. An additional cost analysis was performed applying a standard 5% annual escalation rate to the Original Not-to-Exceed amount which shows the project is $320,675.66 less than an expected 2025 Not-to-Exceed amount and therefore not excessive. Original Contract (2022) Proposed Contract (2025) For Reference Only “5%/year Escalation” to 2022 Original Contract Base Bid $ 49,545,175.12 $ 49,545,175.12 2022 $ 52,022,433 Contingency $ 2,477,258.76 $ 500,000.00 2023 $ 54,655,238 Change Order $ 0.00 $ 9,891,549.22 2024 $ 57,388,000 Not To Exceed (NTE) $ 52,022,433.88 $ 59,936,724.34 2025 $ 60,257,400 Bidding Options - Cancel Project, Delay Bid, Re-Bid The existing Hickory Creek Road required closing for safety during construction. This made the Hickory Creek Road Phase 3 project different from the City’s other large roadway widenings/extensions such as Mayhill Road and Bonnie Brae Road which could allow existing traffic during construction to maintain access and mobility. In turn, canceling the project was never considered a viable option due to the demand for the corridor and traffic having no alternate route with sufficient capacity to mitigate the required road closure. Delaying the project until all items were clear (ROW, Utilities, Railroad Agreement, gas lines, developments, etc.) is the most desirable approach to a project, but this project presented high risks to both schedule and costs and increased inconvenience to local and regional traffic. The City accepted the risk of bidding the project to exploit the potential to save time and ideally money by securing 2022 bid prices. Rebidding the project has always been an option and has been frequently considered. Staff considered that the original project only received three (3) contractor bidders and no guarantee that companies would be willing to bid on a partially constructed project. The known risks were too high to re-bid and outweighed the benefits of keeping the existing contract/bid. 58 May 2, 2025 Report No. 2025-044 CONCLUSION: Based on the information provided, it is recommended that a change order be approved. Key Reasons for Approval: •Necessary for Project Completion: The change order addresses essential factors that haveimpacted the project's timeline and budget, such as utility conflicts, railroad agreements,and increased material and labor costs. •Reasonable Cost Increase: The negotiated change order amount represents a 15% increase, which is well within procurement law’s allowable percentage. •Positive Impact on Project: Approving the change order will allow the project to proceedwith a revised timeline and budget, ensuring its successful completion. Recommendation: The change order request is scheduled for City Council consideration on May 6, 2025. The requested change order of $7,914,290.46 will enable the contractor to remobilize on-site and recommence work on May 12, 2025. The project is expected to be complete by Q4 2026. STAFF CONTACT: Seth Garcia, PMP, Interim Director of Capital Projects Seth.Garcia@cityofdenton.com (940) 349-8938 STAFF TIME TO COMPLETE REPORT: 1 hour 59 60 Friday Report - Council RequestsSummary of RequestCouncil Member Requestor Date Received Staff AssignedDepartmentCommentsStatus1Cooper Creek near Burning Tree easement Council Member Beck04/27/25Daniel KremerPublic WorksReferred to staff. Staff ispreparing the response.2Downtown Square Safety Concerns Council Member Holland04/26/25Farhan Butt, Tina FirgensDevelopment ServicesReferred to staff. Staff ispreparing the response.3Flooding in Old North Park subdivision Council Member Beck04/30/25Seth GarciaCapital Projects/Engineering/Public Works Staff met with residents.Response sent to CM>4Sundown Ranch stop signsCouncil Member Holland04/30/25Farhan ButtPublic Works-TrafficResponse sent to CM.5Bridge on HobsonCouncil Member Holland04/30/25Daniel KremerPublic WorksStaff received proposalfrom vendor. Updated CM.Timeline for repair ispending.6Neighborhood Construction Concerns Council Member Holland04/29/25Seth GarciaCapital Projects/Engineering/Public Works Staff met with residentsand contractors to mitigatethe impact. Response sentto CM.7Standards for community shelterCouncil Member Byrd04/28/25Christine TaylorCMOResponse sent to CM.8Economic Development Board nomination Council Member Byrd04/28/25Christine TaylorCMOResponse sent to CM.9Pothole on Hobson Lane west ofForrestridgeCouncil Member Holland04/27/25Daniel KremerPublic WorksReferred to staff.10Incentive program for City of Dentonemployees to purchase Denton single-family homesCouncil Member Holland04/25/25Jesse KentCommunity ServicesResponse sent to CM.Page 1 of 1Exported on May 1, 2025 2:13:02 PM PDT61 Meeting Calendar City of Denton City Hall 215 E. McKinney St. Denton, Texas 76201 www.cityofdenton.com Criteria : Begin Date: 5/5/2025, End Date: 8/8/2025 Date Time Meeting LocationMeeting Body May 2025 5/5/2025 9:00 AM Public Utilities Board Council Work Session Room 5/6/2025 2:00 PM City Council Council Work Session Room & Council Chambers 5/8/2025 3:00 PM Health & Building Standards Commission CANCELLED 5/9/2025 12:00 PM Community Services Advisory Committee CANCELLED 5/12/2025 3:00 PM Development Code Review Committee Development Services Center 5/12/2025 5:30 PM Board of Ethics Council Work Session Room 5/12/2025 5:30 PM Historic Landmark Commission Development Service Center 5/12/2025 5:30 PM Library Board Emily Fowler Central Library 5/12/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 5/13/2025 2:00 PM City Council Council Work Session Room & Council Chambers 5/14/2025 10:00 AM Animal Shelter Advisory Committee Animal Services Training Room 5/14/2025 11:00 AM Economic Development Partnership Board Development Service Center Training Rooms 5/14/2025 12:30 PM Tax Increment Reinvestment Zone Number Two Board Development Service Center 5/14/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 5/14/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 5/15/2025 3:00 PM Committee on Persons with Disabilities Development Service Center 5/16/2025 1:00 PM Bond Oversight Committee Development Service Center 5/19/2025 9:00 AM Public Utilities Board Council Work Session Room 5/19/2025 5:30 PM Zoning Board of Adjustment Development Service Center Page 1City of Denton Printed on 5/1/202562 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 5/20/2025 2:00 PM City Council Council Work Session Room & Council Chambers 5/23/2025 9:00 AM Community Partnership Committee City Council Work Session Room 5/23/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room 5/28/2025 10:00 AM Mobility Committee Council Work Session Room 5/28/2025 12:00 PM Tax Increment Reinvestment Zone Number One Board Development Service Center 5/28/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers June 2025 6/2/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 6/3/2025 2:00 PM City Council Council Work Session Room & Council Chambers 6/5/2025 8:00 AM Agenda Committee Council Work Session Room 6/5/2025 8:30 AM Downtown Economic Development Committee Development Service Center 6/9/2025 9:00 AM Public Utilities Board Council Work Session Room 6/9/2025 3:00 PM Development Code Review Committee Development Services Center 6/9/2025 5:30 PM Board of Ethics Council Work Session Room 6/9/2025 5:30 PM Historic Landmark Commission Development Service Center 6/9/2025 5:30 PM Library Board North Branch Library 6/11/2025 11:00 AM Economic Development Partnership Board Development Service Center 6/11/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 6/11/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 6/12/2025 3:00 PM Health & Building Standards Commission Development Service Center 6/13/2025 12:00 PM Community Services Advisory Committee Development Service Center 6/13/2025 5:00 PM City Council Council Work Session Room & Council Chambers 6/17/2025 2:00 PM City Council Council Work Session Room & Council Chambers Page 2City of Denton Printed on 5/1/202563 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 6/23/2025 9:00 AM Public Utilities Board Council Work Session Room 6/23/2025 3:00 PM Development Code Review Committee Development Services Center 6/23/2025 5:30 PM Zoning Board of Adjustment Development Service Center 6/25/2025 10:00 AM Mobility Committee Council Work Session Room 6/25/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 6/27/2025 9:00 AM Community Partnership Committee City Council Work Session Room 6/27/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room July 2025 7/3/2025 8:00 AM Agenda Committee Council Work Session Room 7/7/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 7/9/2025 10:00 AM Animal Shelter Advisory Committee Animal Services Training Room 7/9/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 7/10/2025 Health & Building Standards Commission Development Service Center 7/11/2025 12:00 PM Community Services Advisory Committee Development Service Center 7/14/2025 9:00 AM Public Utilities Board Council Work Session Room 7/14/2025 3:00 PM Development Code Review Committee Development Services Center 7/14/2025 5:30 PM Board of Ethics Council Work Session Room 7/14/2025 5:30 PM Historic Landmark Commission Development Service Center 7/14/2025 5:30 PM Library Board South Branch Library 7/15/2025 2:00 PM City Council Council Work Session Room & Council Chambers 7/17/2025 3:00 PM Committee on Persons with Disabilities Development Service Center 7/22/2025 2:00 PM City Council Council Work Session Room & Council Chambers 7/23/2025 12:00 PM Tax Increment Reinvestment Zone Number One Board Development Service Center 7/23/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 7/25/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room Page 3City of Denton Printed on 5/1/2025 64 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 7/28/2025 9:00 AM Public Utilities Board Council Work Session Room 7/28/2025 5:30 PM Zoning Board of Adjustment Development Service Center 7/30/2025 10:00 AM Mobility Committee Council Work Session Room August 2025 8/4/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 8/5/2025 2:00 PM City Council Council Work Session Room & Council Chambers 8/7/2025 8:00 AM Agenda Committee Council Work Session Room 8/7/2025 8:30 AM Downtown Economic Development Committee Development Service Center 8/7/2025 4:00 PM Public Art Committee Civic Center Community Room 8/8/2025 12:00 PM Community Services Advisory Committee Development Service Center Page 4City of Denton Printed on 5/1/2025 65 Meeting Date Item Legistar ID Departments Involved Type Estimated Time A. Expiring Incentives 25-490 Economic Development Council Request 0:30 B. State Legislative Session Update 25-840 City Manager's Office City Business 0:30 C. Two Minute Pitch:25-025 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 2:00 Other Major Items for Meeting: Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 0:30 Other Major Items for Meeting: A. Audit of Recreation Facility Operations 25-339 Internal Audit City Business 0:15 B. Audit of Parks Management and Planning 25-340 Internal Audit City Business 0:30 C. Animal Services Euthanasia Policy and Schedule of Fees TBD Animal Services City Business 1:00 D. Financial Policy Discussion 25-241 Finance City Business 1:00 E. Two Minute Pitch:25-026 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:45 Other Major Items for Meeting: A. City Council Committee Assignments TBD City Secretary's Office City Business 0:45 B. Denton Renewable Resource Plan 24-1910 Denton Municipal Electric City Business 1:00 C. Special Events Fee Update 25-766 Finance City Business 1:00 D. Two Minute Pitch:25-027 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:45 Other Major Items for Meeting: A. Budget Update - Current Year, and Fiscal Year 2025-2026 Forecast 24-2616 Finance City Business 1:00 B. Climate Action Plan Update 25-421 Environmental Services City Business 0:45 C. Legislative Session Recap TBD City Manager's Office City Business 0:30 D. Boards and Commissions Citizen Nominations TBD City Secretary's Office City Business 0:30 E. Two Minute Pitch:25-028 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:45 Other Major Items for Meeting: A. Audit of Public Works Maintenance 25-338 Internal Audit City Business 0:30 B. Capital Improvement Program Fiscal Year 2025-2026 24-2617 Finance City Business 1:00 C. Countywide Vote Centers TBD City Secretary's Office Council Request 0:30 D. Two Minute Pitch:25-029 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:00 Other Major Items for Meeting: A. Utility Budgets and Rates Fiscal Year 2025-2026 24-2618 Finance City Business 1:00 B. Water Master Plan 25-363 Water City Business 0:45 C. Fair Chance Hiring Ordinance TBD City Manager's Office Council Request 1:00 D. Two Minute Pitch:25-030 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:45 Other Major Items for Meeting: A. Two Minute Pitch:25-030 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 1:00 Other Major Items for Meeting: A. 2025-26 City Manager’s Proposed Budget, Capital Improvement Program, and Five-Year Financial Forecast.24-2619 Finance City Business 4:00 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 4:30 Other Major Items for Meeting: A. Fiscal Year 2025-26 City Manager's Proposed Budget, Capital Improvement Program, and Five-Year Financial Forecast 24-2620 Finance City Business 1:00 B. Two Minute Pitch:25-030 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 2:00 Other Major Items for Meeting: A. Inclement Weather Policy TBD City Manager's Office City Business 1:00 B. Two Minute Pitch:25-030 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 2:00 Other Major Items for Meeting: A. Two Minute Pitch:25-030 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 1:00 Other Major Items for Meeting: A. Two Minute Pitch:25-030 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 1:00 Other Major Items for Meeting: Item Date Approved Department Next Step Requestor Board of Ethics develop guidance for interactions with external partners 6/18/2024 Internal Audit Work Session CM Beck Rooftop and wall gardens and solar panels on City buildings 12/3/2024 Facilities Management Agenda Committee CM Beck May 20 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) September 9 Work Session (@2:00 p.m.) Special Called Meeting (Upon conclusion of the Work Session) August 19 Work Session (@2:00 p.m.) Regular Called Meeting (6:30 p.m.) September 16 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) September 30 Work Session (@2:00 p.m.) Special Called Meeting (Upon conclusion of the Work Session) May 6 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) June 3 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) Approved Council Pitches to be Scheduled May 13 Special Called Meeting - Canvassing (@ 2:00 p.m.) Council Priorities and Significant Work Plan Items to be Scheduled Tentative Work Session Topics and Meeting Information Updated: May 2, 2025 July 15 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) August 9 Saturday Budget Workshop (8:00 a.m.) June 17 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) August 5 Work Session (@2:00 p.m.) Regular Called Meeting (6:30 p.m.) July 22 Work Session (@2:00 p.m.) Special Called Meeting (Upon Conclusion of the Work Session) *This is for planning purposes only. Dates are subject to change.66 1 Street Closure Report: Upcoming ClosuresSCR May 5th - 11thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Ave DChestnut StMulberry St05/12/25 08/15/25 Utility installations and pavement replacement. EngineeringMegan DavidsonFull Closure2Chestnut StAve CAve D05/12/25 08/15/25 Utility installations and pavement replacement. EngineeringMegan DavidsonFull Closure3Crescent StAileen StMalone St05/21/25 07/21/25 Utility installations and pavement replacement. EngineeringMegan DavidsonFull Closure4Hilltop Rdat Country Club Road (FM 1830)05/12/25 09/30/25 Hilltop Road at Country Club Road will bereconstructed (new drainage, road, etc.) andnew northbound right turn lane will be added toCountry Club RoadOtherTracy BeckFull Closure5Oak St E (109)Austin Stat Intersection05/19/25 07/04/25 ADA / Sidewalk Work at IntersectionStreetsRoy San MiguelLane Closure6Ryan RdCreekside DrGranada Trl05/12/25 05/15/25 Sanitary Sewer improvementPublic Works InspectionsWastewaterAlexander CervantesFull Closure7Tawakoni Dr (5908)Amistad Lnat Intersection05/19/25 06/27/25 ADA Ramp RepairStreetsRoy San MiguelLane Closure8Union Cir (in entirety)Chestnut StPrairie St05/12/25 10/01/25 Utility installations and pavement replacement. EngineeringMegan DavidsonFull ClosureExported on May 2, 2025 11:57:11 AM CDT67 2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Aileen StPanhandle StBroadway St09/27/24 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure2Alice StPanhandle StCrescent St05/02/25 12/05/25 Utility installations andpavement replacement.EngineeringMegan DavidsonFull Closure3Audra LnStockton StMockingbird Ln07/29/24 05/09/25 Connection new storm drainageto existing City of Dentondrainage.Private DevelopmentZabdiel MotaLane Closure4Austin St N (208)Pecan St W@ Intersection03/31/25 05/09/25 ADA / Sidewalk Repair StreetsRoy San MiguelLane Closure5Ave ACollins StEagle Dr10/08/24 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure6Ave AEagle DrHighland St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure7Ave BFannin StMargie St11/22/24 05/30/25 Pavement replacement EngineeringScott FettigFull Closure8Ave GPrairie StLousie St03/13/25 05/23/25 Utility installations andpavement replacementEngineeringMegan DavidsonFull Closure9Bernard StLindsey StFannin St08/26/24 05/30/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure10Bonnie Brae StAirport Rd (FM 1515)Walt Parker Dr (Main Stadium Dr) 01/06/25 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure11Cactus CirYucca Dr(End of street) Cul de sac04/28/25 09/02/25 Utilities and PavementreplacementEngineeringDante HaleFull Closure12Camelot StHercules LnStuart Rd04/28/25 07/01/25 Utilities and PavementreplacementEngineeringDante HaleRolling Closure13Clear River LnMontecito DrSweet Cloud Way04/07/25 05/23/25 Concrete Panel Repair StreetsRoy San MiguelLane Closure14Clover LnRobinwood LnGlenwood Ln11/12/24 05/18/25 Full Road Reconstruction EngineeringSheldon GatewoodFull Closure15Collins StAve ABernard St08/26/24 05/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure16Congress StPonder StCarroll Blvd03/31/25 06/01/25 Utility constructionEngineeringMegan DavidsonRolling Closure17Congress StPonder AveCoit St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure18Crescent StCarroll BlvdBolivar St01/24/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure19Eagle DrAve CAve A03/17/25 05/09/25 Using it or an entrance due toelevation changes in the jobsiteit is the only way to get into thesitePublic Works Inspections Collin ColeLane Closure20Eastpark BlvdLinden DrCrescent St04/28/25 05/26/25 Jobsite needs to be able toaccess the buildings withcranes but cant do that frominside jobsitePublic Works Inspections Collin ColeFull Closure21Ector StEmry StUniversity Dr04/28/25 05/26/25 Sanitary Sewer Being installedin the Northbound lanePublic Works Inspections Collin ColeLane Closure22Egan StCarroll BlvdBolivar St05/07/25 09/10/25 Utility installations andpavement replacement.EngineeringMegan DavidsonFull Closure23Emery StAlice StDead End (West of Fulton)02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure24Fry StOak StHickory St04/28/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany TrammellRolling Closure25Fulton StCordell StEmery St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure26Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830) 03/13/23 12/31/25 Bridge InstallationEngineeringTracy BeckFull Closure27Hobson LnForrestridge DrCountry Club Rd05/08/25 07/30/25 Utility work and turn laneconstruction on HobsonPublic Works Inspections Gavin PetnerFull Closure28Huisache StAspen DrYucca Dr04/09/25 08/08/25 Utilities and PavementreplacementEngineeringDante HaleRolling Closure29Jim ChristalMasch Branch Rd@ Intersection03/07/25 06/06/25 Adding 2 Lanes E/W on JimChristal: Adding a turn Lane onMasch BranchPublic Works Inspections Kirk WinterLane Closure30Johnson StCollins StSmith St04/14/25 05/09/25 Sewer connectionPublic Works Inspections Stephany TrammellLane Closure31Juno LnAtlas DrStuart Dr04/09/25 08/08/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure32Margie StAve AAve B11/01/24 05/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure33Mistywood LnRobinwoodGlenwood04/28/25 05/16/25 Voids undergroundOtherSheldon GatewoodFull Closure Exported on May 2, 2025 11:57:27 AM CDT68 Street/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type34Morse StLoop 288Mayhill Rd12/02/24 06/27/25 Water Line Replacement andRoad ReconstructionPublic Works InspectionsStreets WaterKristine StewartLane Closure35Mounts AveCongress St WHaynes St03/21/25 06/27/25 Utility installations andpavement replacementEngineeringMegan DavidsonFull Closure36Mulberry StElm StCarroll Blvd03/17/25 05/09/25 Water/Wastewater connections Public Works Inspections Stephany TrammellFull Closure37Mulberry StWelch StBernard St11/29/24 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure38Nautical LnHickory Creek RdOcean Dr04/28/25 05/30/25 Water and Storm line tie ins Private DevelopmentGavin PetnerLane Closure39Normal StOak StScripture St05/08/25 09/05/25 Utility installations andpavement replacement.EngineeringMegan Davidson40Northridge StHinkle DrBolivar St04/16/25 04/20/26 Utilities and PavementreplacementEngineeringDante HaleRolling Closure41Oak StCarroll BlvdFry St04/21/25 05/26/25 Mastec relocating gas lines Public Works Inspections Stephany TrammellRolling Closure42Oak StWelch StAve C04/28/25 05/30/25 Mastec relocating gas lines Public Works Inspections Stephany TrammellRolling Closure43Ocean DrAtlantic DrNautical Ln04/14/25 05/30/25 Sanitary Sewer installPrivate DevelopmentGavin PetnerFull Closure44Panhandle StEctor StAileen St09/27/24 05/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure45Pershing DrAtlas DrStuart Rd05/08/25 12/15/25 Utilities and PavementreplacementEngineeringDante HaleFull Closure46Prairie StWelch StBernard St03/13/25 05/23/25 Utility installationsEngineeringMegan DavidsonFull Closure47Precision DrAirport RdUNT Library Annex04/01/25 07/31/25 ReconstructionEngineering OtherGio PineiroFull Closure48Redstone RdHercules LnNeptune Dr05/05/25 06/12/25 Utilities and PavementreplacementEngineeringDante HaleFull Closure49Riney RdBonnie Brae StHardaway Rd03/08/25 08/01/25 Contractor to install 12-inchwaterline to provide water to thenew DISD elementary schoolEngineeringJesus PerezFull Closure50Robinwood LnEmerson LnLive Oak St11/12/24 05/16/25 Full Road Reconstruction EngineeringSheldon GatewoodFull Closure51Robinwood LnLive OakKayewood Dr01/27/25 06/30/25 Road reconstruction (Millingand C/G Removal, Stabilization)EngineeringSheldon GatewoodFull Closure52Saddle Back DrQuarter Horse WayHighpoint Dr04/28/25 05/23/25 Sidewalk and Panel Repairs StreetsRoy San MiguelLane Closure53Scripture StJagoe StPonder St03/04/25 10/17/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure54Sunset StUniversity Dr WAnna St01/20/25 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure55Trinity RdMcKinney StBlagg Rd05/05/25 06/06/25 Utilities and PavementreplacementEngineeringDante HaleFull Closure56Unicorn Lake BlvdState School RdWind River Ln03/25/25 05/30/25 Water tie insPrivate DevelopmentGavin PetnerLane Closure57Welch StOak StHickory St04/21/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany TrammellFull Closure58Welch StEagle DrHighland St03/13/25 05/30/25 Utility installations andpavement replacementEngineeringMegan DavidsonFull Closure59Welch StEagle DrHickory St06/03/24 05/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure60Welch StChestnut StMulberry St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure61Welch StHighland StHickory St08/26/24 07/31/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure62Westway StAnna StBolivar St01/24/25 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure63Willowwood StWestwood DrLeslie St03/10/25 05/30/25 Sanitary sewer, water andstorm sewer installPrivate DevelopmentGavin PetnerLane Closure Exported on May 2, 2025 11:57:27 AM CDT69 3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Audra LnStockton StMockingbird Ln02/24/25 04/18/25 Paving new addition street laneon Audra Lane and replacingstreet panel on existingroadway where 8-inch water tapwas performed.Private Development PublicWorks InspectionsZabdiel MotaLane Closure2Ave CEagle DrHighland St08/26/24 04/30/25 Pavement replacement. EngineeringScott FettigFull Closure3Bell Ave N (3317)Locust StHolly Creek Rd03/03/25 04/11/25 Curb Gutter / Sidewalk Repair StreetsRoy San MiguelLane Closure4Bonnie Brae StOak StHickory St02/10/25 04/05/25 Concrete poles install on thatcorner for DMEPublic Works Inspections John CantuLane Closure5Bonnie Brae StUniversity Dr (Hwy 380) Elm St N03/10/25 04/18/25 Contractor will be preparing theright-of-way by cutting down thetrees that will be removed towiden Bonnie BraeEngineeringJesus PerezRolling Closure6Bronco WayChivalry DrBonnie Brae St03/31/25 04/15/25 Contractor will be boringunderneath the intersection ofBonnie Brae and Bronco Way toinstall a 12-inch water lineEngineeringJesus PerezLane Closure7Duncan StSmith StKerley St02/21/25 04/25/25 Water Utility Line Repairs -Repairing AsphaltPublic Works Inspections Kirk WinterLane Closure8Fannin StAve AAve B12/09/24 04/11/25 Storm Drain being installed Public Works Inspections Collin ColeLane Closure9Hialeah Dr (4200)Vineland Ave@ Intersection04/07/25 04/17/25 Street Panel / ADA / SidewalkRepairStreetsRoy San MiguelLane Closure10Hill StSmith StMill St02/21/25 04/25/25 Water Utility tie-inPublic Works Inspections Kirk WinterLane Closure11Hillcrest StPanhandle StCrescent St12/27/23 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure12Hollister Ln (1900)Fanitia Pl@ Intersection04/07/25 04/17/25 ADA / Sidewalk Repair StreetsRoy San MiguelLane Closure13Houston PlThomas StBradley St09/27/24 04/11/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure14Lakeside CtLake Country DrCul de Sac03/03/25 04/11/25 Sidewalk RepairStreetsRoy San MiguelLane Closure15Marietta StOak StScripture St09/27/24 04/11/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure16Oak St E (109)Austin St NLocust St N03/31/25 04/25/25 Sidewalk /Curb Repair StreetsRoy San MiguelLane Closure17Spur CtLake Country DrCul de Sac03/03/25 04/11/25 Sidewalk RepairStreetsRoy San MiguelLane ClosureExported on May 2, 2025 11:59:23 AM CDT70