2025/05/09 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 12th - 18th
Street/Intersection From To Closure Start Description Department Department Contact Closure Type
Date
1 Crescent St Aileen Sl Malone St 05/21/25 07/21/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure
2 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Intersection Streets Roy San Miguel Lane Closure
3 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure
Exported on May 9,2025 11:27:15 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
-- . ilimm Description
1 Aileen St Panhandle St Broadway St 09/27/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2 Alice St Panhandle St Crescent St 05/02/25 12105/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
3 Ave A Collins St Eagle Dr 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
4 Ave A Eagle Dr Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
5 Ave B Fannin St Margie St 11/22124 05/30/25 Pavement replacement Engineering Scott Fettig Full Closure
6 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
7 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
8 Bell Ave N(1000) Chappel Dr Texas St 05/12/25 06/09/25 Waterline tap and new Water Christopher Yanez Full Closure
installation
9 Bernard St Lindsey St Fannin St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
10 Bonnie Brae St Airport Rd(FM 1515) Walt Parker Dr(Main Stadium Dr) 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
12 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
13 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
14 Clear River Ln Montecito or Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
15 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 05/18/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
16 Collins St Ave A Bernard St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
17 Congress St Ponder St Carroll Blvd 03/31/25 06/01/25 Utility construction Engineering Megan Davidson Rolling Closure
18 Congress St Ponder Ave Colt St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
19 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Eagle or Ave C Ave A 03/17/25 06/13/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
20 elevation changes in the jobsite
it is the only way to get into the
site
Eastpark Blvd Linden or Crescent St 04/28/25 05/26/25 Jobsite needs to be able to Public Works Inspections Collin Cole Full Closure
21 access the buildings with
cranes but cant do that from
inside jobsite
22 Ector St Emery St University or 04/28/25 05/26/25 Sanitary Sewer Being installed Public Works Inspections Collin Cole Lane Closure
in the Northbound lane
23 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
24 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
25 Fry St Oak St Hickory St 04/28/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
26 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/25 Bridge Installation Engineering Tracy Beck Full Closure
Hilltop Rd at Country Club Road(FM 1830) 05/12/25 09/30/25 Hilltop Road at Country Club Other Tracy Beck Full Closure
Road will be reconstructed(new
28 drainage,road,etc.)and new
northbound right turn lane will
be added to Country Club Road
29 Hobson Ln Forrestridge Dr Country Club Rd 05/08/25 07/30/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure
construction on Hobson
30 Huisache St Aspen or Yucca or 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Masch Branch Rd @ Intersection 03/07/25 06/06/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
31 Christal:Adding a turn Lane on
Masch Branch
Exported on May 9,2025 11:27:38 AM CDT Page 1 of 2
Streett Intersection From To Closure Start Closure End Description Department Department Contact Closure Type
Date Date 1
32 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
33 Margie St Ave A Ave B 11/01/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
34 Mistywood Ln Robinwood Glenwood 04/28/25 05/16/25 Voids underground Other Sheldon Gatewood Full Closure
35 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
36 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
37 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
38 Nautical Ln Hickory Creek Rd Ocean Or 04/28/25 05/30/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
39 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson
pavement replacement.
40 Northridge St Hinkle Dr Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
41 Oak St Carroll Blvd Fry St 04/21/25 05/26/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
42 Oak St Welch St Ave C 04/28/25 05/30/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
43 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 05/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
44 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
45 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
46 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure
47 Precision Or Airport Rd UNIT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
48 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
49 waterline to provide water to the
new DISD elementary school
50 Robinwood Ln Emerson Ln Live Oak St 11/12/24 05/16/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
51 Robinwood Ln Live Oak Kayewood or 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
52 Ryan Rd Creekside Dr Granada Tri 05/12/25 05/15/25 Sanitary Sewer improvement Public Works Inspections Alexander Cervantes Full Closure
Wastewater
53 Saddle Back Or Quarter Horse Way Highpoint Or 04/28/25 05/23/25 Sidewalk and Panel Repairs Streets Roy San Miguel Lane Closure
54 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
55 Sunset St University Dr W Anna St 01/20/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
56 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
57 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 05/30/25 Water tie ins Private Development Gavin Petner Lane Closure
58 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
59 Welch St Oak St Hickory St 04/21/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Full Closure
60 Welch St Eagle Or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
61 Welch St Eagle Or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
62 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
63 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
64 Westway St Anna St Bolivar St 01/24/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
65 Willowwood St Westwood Dr Leslie St 03/10/25 05/30/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on May 9,2025 11:27:38 AM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
__ J� •-r - - •-• • DescriptionDepartmentDepartment • - •-
1-1111
Audra Ln Stockton St Mockingbird Ln 02/24/25 14/18/25 Paving new addition street lane Private Development Public Zabdiel Mote Lane Closure
on Audra Lane and replacing Works Inspections
1 street panel on existing
roadway where 8-inch water tap
was performed.
Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure
2 to existing City of Denton
drainage.
3 Austin St N(208) Pecan St W @ Intersection 03/31/25 05/09/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
4 Ave C Eagle Dr Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure
5 Bell Ave N(3317) Locust St Holly Creek Rd 03/03/25 04/11/25 Curb Gutter/Sidewalk Repair Streets Roy San Miguel Lane Closure
Bonnie Brae St University Dr(Hwy 380) Elm St N 03/10/25 04/18/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure
6 right-of-way by cutting down the
trees that will be removed to
widen Bonnie Brae
Bronco Way Chivalry Dr Bonnie Brae St 03/31/25 04/15/25 Contractor will be boring Engineering Jesus Perez Lane Closure
7 underneath the intersection of
Bonnie Brae and Bronco Way to
install a 12-inch water line
8 Duncan St Smith St Kerley St 02/21/25 04/25/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure
Repairing Asphalt
9 Fannin St Ave A Ave B 12/09/24 04/11/25 Storm Drain being installed Public Works Inspections Collin Cole Lane Closure
10 Hialeah Dr(4200) Vineland Ave @ Intersection 04/07/25 04/17/25 Street Panel/ADA/Sidewalk Streets Roy San Miguel Lane Closure
Repair
11 Hill St Smith St Mill St 02/21/25 04/25/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure
12 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Hollister Ln(1900) Fanitia PI @ Intersection 04/07/25 04/17/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
14 Houston PI Thomas St Bradley St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Johnson St Collins St Smith St 04/14/25 05/09/25 Sewer connection Public Works Inspections Stephany Trammell Lane Closure
16 Lakeside Ct Lake Country Dr Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
17 Marietta St Oak St Scripture St 09/27/24 04/11/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
18 Mulberry St Elm St Carroll Blvd 03/17/25 05/09/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
19 Oak St E(109) Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair Streets Roy San Miguel Lane Closure
20 Spur Ct Lake Country Dr Cul de Sac 03/03/25 04/11/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
Exported on May 9,2025 11:28:13 AM CDT Page 1 of 1