Loading...
2025/05/16 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR May 19th - 25th Closure Start Description Department Department Contact Closure Type Street/Intersection Date IMI I 1 La Mirada(1500) Marten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure Exported on May 16,2025 11:44:07 AM CDT 2 Street Closure Report: Current Closures smartsheet -- . ilimm Description 1 Aileen St Panhandle St Broadway St 09/27/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Alice St Panhandle St Crescent St 05/02/25 12105/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 3 Ave A Collins St Eagle Dr 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 4 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 5 Ave B Fannin St Margie St 11/22124 05/30/25 Pavement replacement Engineering Scott Fettig Full Closure 6 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 7 Ave G Prairie St Lousie St 03/13/25 05/23/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 8 Bell Ave N(1000) Chappel Dr Texas St 05/12/25 06/09/25 Waterline tap and new Water Christopher Yanez Full Closure installation 9 Bernard St Lindsey St Fannin St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 10 Bonnie Brae St Airport Rd(FM 1515) Walt Parker Dr(Main Stadium Dr) 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 12 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 13 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 14 Clear River Ln Montecito or Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 15 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 16 Collins St Ave A Bernard St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 17 Congress St Ponder St Carroll Blvd 03/31/25 06/01/25 Utility construction Engineering Megan Davidson Rolling Closure 18 Congress St Ponder Ave Colt St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 19 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 20 Crescent St Aileen St Malone St 05/21/25 07/21/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. Eagle or Ave C Ave A 03/17/25 06/13/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 21 elevation changes in the jobsite it is the only way to get into the site Eastpark Blvd Linden or Crescent St 04/28/25 05/26/25 Jobsite needs to be able to Public Works Inspections Collin Cole Full Closure 22 access the buildings with cranes but cant do that from inside jobsite 23 Ector St Emery St University or 04/28/25 05/26/25 Sanitary Sewer Being installed Public Works Inspections Collin Cole Lane Closure in the Northbound lane 24 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 25 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Fry St Oak St Hickory St 04/28/25 06/06/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 27 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 28 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd at Country Club Road(FM 1830) 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 29 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 30 Hobson Ln Forrestridge or Country Club Rd 05/08/25 07/30/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure construction on Hobson 31 Huisache St Aspen Dr Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Exported on May 16,2025 11:44:18 AM CDT Streett Intersection From To Closure Start Closure End Description Department Department Contact Date Date Closure Type Jim Christal Masch Branch Rd @ Intersection 03/07/25 06/06/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 32 Christal:Adding a turn Lane on Masch Branch 33 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 34 Margie St Ave A Ave B 11/01/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 35 Mistywood Ln Robinwood Glenwood 04/28/25 07/12/25 Voids underground Other Sheldon Gatewood Full Closure 36 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 37 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 38 Mulberry St Elm St Carroll Blvd 03/17/25 05/30/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 39 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 40 Nautical Ln Hickory Creek Rd Ocean Dr 04/28/25 05/30/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 41 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson pavement replacement. 42 Northridge St Hinkle Dr Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 43 Oak St Carroll Blvd Fry St 04/21/25 05/26/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 44 Oak St Welch St Ave C 04/28/25 05/30/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 45 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 46 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 05/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 47 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 48 Pershing Or Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 49 Prairie St Welch St Bernard St 03/13/25 05/23/25 Utility installations Engineering Megan Davidson Full Closure 50 Precision Dr Airport Rd UNIT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 51 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 52 waterline to provide water to the new DISD elementary school 53 Robinwood Ln Live Oak Kayewood Or 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 54 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 55 Ryan Rd Creekside Dr Granada Trl 05/19/25 05/23/25 Sanitary Sewer improvement Public Works Inspections John Cantu Full Closure Wastewater 56 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 57 Sunset St University Dr W Anna St 01/20/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 58 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure 59 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 60 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 05/30/25 Water tie ins Private Development Gavin Petner Lane Closure 61 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 62 Welch St Eagle Dr Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 63 Welch St Eagle Dr Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 64 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 65 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 66 Westway St Anna St Bolivar St 01/24/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 67 Willowwood St Westwood Dr Leslie St 03/10/25 05/30/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on May 16,2025 11:44:18 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/ •-r - - •-• • DescriptionDepartmentDepartment • - •- 1-1111 Audra Ln Stockton St Mockingbird Ln 02/24/25 14/18/25 Paving new addition street lane Private Development Public Zabdiel Mote Lane Closure on Audra Lane and replacing Works Inspections 1 street panel on existing roadway where 8-inch water tap was performed. Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mota Lane Closure 2 to existing City of Denton drainage. 3 Austin St N(208) Pecan St W @ Intersection 03/31/25 05/09/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure 4 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure Bonnie Brae St University Dr(Hwy 380) Elm St N 03/10/25 04/18/25 Contractor will be preparing the Engineering Jesus Perez Rolling Closure 5 right-of-way by cutting down the trees that will be removed to widen Bonnie Brae 6 Duncan St Smith St Kerley St 02/21/25 04/25/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure Repairing Asphalt 7 Hialeah Dr(4200) Vineland Ave @ Intersection 04/07/25 04/17/25 Street Panel/ADA/Sidewalk Streets Roy San Miguel Lane Closure Repair 8 Hill St Smith St Mill St 02/21/25 04/25/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure 9 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Hollister Ln(1900) Fanitia PI @ Intersection 04/07/25 04/17/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure 11 Johnson St Collins St Smith St 04/14/25 05/09/25 Sewer connection Public Works Inspections Stephany Trammell Lane Closure 12 Oak St E(109) Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair Streets Roy San Miguel Lane Closure 13 Saddle Back or Quarter Horse Way Highpoint Dr 04/28/25 05/15/25 Sidewalk and Panel Repairs Streets Roy San Miguel Lane Closure 14 Welch St Oak St Hickory St 04/21/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Full Closure Exported on May 16,2025 11:44:41 AM CDT