2025/05/23 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 26th - June 1st
Closure Star�..
Street/Intersection Date IM!Description Department Department Contact Closure Type
1 Denton St Hickory St Congress St O6/02/25 11/05/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure
2 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
3 Ponder St Oak St Panhandle Sl O6/19/25 04/27/26 Utility installations and pavement replacement Engineerng Megan Davidson Full Closure
Exported on May 23,2025 11:27:30 AM CDT
2 Street Closure Report: Current Closures smartsheet
From 111111111111111111IFTo L�wlllli..Mmlm Description Department Department Contact A
17Ajleen St Panhandle St Broadway St 09/27/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2St Sunset St University or(US 380) 05/27/25 06/06/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
3 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
4 Ave A Collins St Eagle or 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Ave B Fannin St Margie St 11/22/24 05/30/25 Pavement replacement Engineering Scott Fettig Full Closure
7 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
8 Ave G Prairie St Lousie St 03/13/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
Bell Ave University or(Hwy 380) Texas St 05/12/25 06/09/25 Waterline tap and new Atmos Drainage Christopher Yanez Full Closure
installation Engineering Private
9 Development Public Works
Inspections Streets Traffic
TXDoT Water Wastewater
10 Bell Ave N(1000) Chappel Dr Texas St 05/12/25 06/09/25 Waterline tap and new Water Christopher Yanez Full Closure
installation
11 Bernard St Lindsey St Fannin St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
12 Bonnie Brae St Airport Rd(FM 1515) Walt Parker or(Main Stadium Dr) 01/06/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
14 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
15 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
16 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
17 Collins St Ave A Bernard St 08/26/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
18 Congress St Ponder St Carroll Blvd 03/31/25 06/01/25 Utility construction Engineering Megan Davidson Rolling Closure
19 Congress St Ponder Ave Coit St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Crescent St Aileen St Malone St 05/21/25 07/21/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
Eagle or Ave C Ave A 03/17/25 06/13/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
22 elevation changes in the jobsite
it is the only way to get into the
site
Eastpark Blvd Linden Dr Crescent St 04/28/25 05/26/25 Jobsite needs to be able to Public Works Inspections Collin Cole Full Closure
23 access the buildings with
cranes but cant do that from
inside jobsite
24 Ector St Emery St University or 04/28/25 05/26/25 Sanitary Sewer Being installed Public Works Inspections Collin Cole Lane Closure
in the Northbound lane
25 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
26 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Fry St Oak St Hickory St 04/28/25 06/06/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
28 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
29 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure
Hilltop Rd at Country Club Road(FM 1830) 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure
Road will be reconstructed(new
30 drainage,road,etc.)and new
northbound right turn lane will
be added to Country Club Road
Exported on May 23,2025 11:27:44 AM CDT
Streett Intersection From To Closure Start Closure End Description Department Department Contact
Date Date Closure Type
31 Hobson Ln Forrestridge Dr Country Club Rd 05/08/25 06/06/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure
construction on Hobson
32 Huisache St Aspen Dr Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Masch Branch Rd @ Intersection 03/07/25 06/06/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
33 Christal:Adding a turn Lane on
Masch Branch
34 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
35 Margie St Ave A Ave B 11/01/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
36 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 07/12/25 Voids underground Other Sheldon Gatewood Full Closure
37 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
38 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
39 Mulberry St Elm St Carroll Blvd 03/17/25 05/30/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
40 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
41 Nautical Ln Hickory Creek Rd Ocean Or 04/28/25 05/30/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
42 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson
pavement replacement.
43 Northridge St Hinkle Or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
44 Oak St Welch St Ave C 04/28/25 05/30/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
45 Oak St Carroll Blvd Fry St 04/21/25 06/13/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
46 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure
Intersection
47 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 05/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
48 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
49 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
50 Prairie St Welch St Bernard St 03/13/25 06/27/25 Utility installations Engineering Megan Davidson Full Closure
51 Precision Or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
52 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
53 waterline to provide water to the
new DISD elementary school
54 Robinwood Ln Live Oak Kayewood Dr 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
55 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
56 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
57 Sunset St University Dr W Anna St 01/20/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
58 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure
59 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
60 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 05/30/25 Water tie ins Private Development Gavin Petner Lane Closure
61 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
62 Welch St Eagle Or Highland St 03/13/25 05/30/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
63 Welch St Eagle Or Hickory St 06/03/24 05/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
64 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
65 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
66 Westway St Anna St Bolivar St 01/24/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on May 23,2025 11:27:44 AM CDT
Streett Intersection From To Closure Start Closure End Description Department Department Contact Closure Type
Date Date
67 Willowwood St Westwood or Leslie St 03/10/25 05/30/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on May 23,2025 11:27:44 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Str
__ Intersection • • . •- . •-1 • Description -•. - •-•. - • - •-
Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure
1 to existing City of Denton
drainage.
2 Austin St N(208) Pecan St W @ Intersection 03/31/25 05/09/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure
3 Ave C Eagle or Highland St 08/26/24 04/30/25 Pavement replacement. Engineering Scott Fettig Full Closure
4 Clear River Ln Montecito Dr Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
5 Duncan St Smith St Kerley St 02/21/25 04/25/25 Water Utility Line Repairs- Public Works Inspections Kirk Winter Lane Closure
Repairing Asphalt
6 Hill St Smith St Mill St 02/21/25 04/25/25 Water Utility tie-in Public Works Inspections Kirk Winter Lane Closure
7 Hillcrest St Panhandle St Crescent St 12/27/23 04/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
8 Johnson St Collins St Smith St 04/14/25 05/09/25 Sewer connection Public Works Inspections Stephany Trammell Lane Closure
9 Oak St E(109) Austin St N Locust St N 03/31/25 04/25/25 Sidewalk/Curb Repair Streets Roy San Miguel Lane Closure
10 Ryan Rd Creekside Dr Granada Trl 05/19/25 05/23/25 Sanitary Sewer improvement Public Works Inspections John Cantu Full Closure
Wastewater
11 Saddle Back Dr Quarter Horse Way Highpoint Dr 04/28/25 05/15/25 Sidewalk and Panel Repairs Streets Roy San Miguel Lane Closure
12 Welch St Oak St Hickory St 04/21/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Full Closure
Exported on May 23,2025 11:27:57 AM CDT