Loading...
2025/06/06 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR June 9th — 15th Street/Intersection-IqmmmpF-- From To Closure Start Description Department Department Contact Closure Type Date 1 Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 06/16/25 06/23/25 Construction of the new alignment of Bonnie Engineering Robin Davis Full Closure Brae connecting to Airport Road/FM 1515 Bonnie Brae St S Willowwood St Parvin St 06/16/25 10/17/25 Installation of drainage infrastructure, Engineering Robin Davis Full Closure 2 embankment work in advance of street widening.(Access to Natl Wholesale& residents only) 3 Crescent St Aileen St Malone St 06/16/25 09/05/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure 4 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 07/18/25 Bore work to install new sanitary sewer line. Private Development Zabdiel Mots Lane Closure 5 Ponder St Oak St Panhandle St 06/19/25 04/27/26 Utility installations and pavement replacement Engineering Megan Davidson Full Closure 6 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 07/18/25 Sidewalk Repair Streets Roy San Miguel Lane Closure Exported on June 6,2025 11:40:55 AM CDT 2 Street Closure Report: Current Closures smartsheet From 111111111111111111IFTo L��Mmlm Description Department Department Contact A 17AjIeen St Panhandle St Broadway St 09/27/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2St Sunset St University or(US 380) 05/27/25 06/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 3 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 4 Ave A Collins St Eagle or 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 6 Ave B Fannin St Margie St 11/22/24 06/30/25 Pavement replacement Engineering Scott Fettig Full Closure 7 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 8 Ave G Prairie St Lousie St 03/13/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 9 Bernard St Lindsey St Fannin St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 10 Bonnie Brae St Airport Rd(FM 1515) Walt Parker Dr(Main Stadium Dr) 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure pavement replacement. 11 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 12 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 13 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 14 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 15 Collins St Ave A Bernard St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 16 Congress St Ponder St Coit St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 17 Congress St Ponder St Carroll Blvd 03/31/25 07/04/25 Utility construction Engineering Megan Davidson Rolling Closure 18 Cornell Ln University or W Amherst Dr 06/02/25 06/20/25 Water Taps Public Works Inspections Alexander Cervantes Lane Closure 19 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 20 Crescent St Aileen St Malone St 05/21/25 07/21/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 21 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Eagle or Ave C Ave A 03/17/25 06/13/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 22 elevation changes in the jobsite it is the only way to get into the site 23 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 24 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 25 Fry St Oak St Hickory St 04/28/25 06/27/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 26 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 27 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd at Country Club Road(FM 1830) 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 28 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 29 Hobson Ln Forrestridge or Country Club Rd 05/08/25 07/01/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure construction on Hobson 30 Huisache St Aspen Dr Yucca or 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 06/20/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 31 Christal:Adding a turn Lane on Masch Branch 32 Juno Ln Atlas or Stuart or 04/09/25 708/08/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Exported on June 6,2025 1:58:47 PM CDT ClosureStreett Intersection From To Dat_ �'_ Description Department Department 33 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 34 Margie St Ave A Ave B 11/01/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 35 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 07/12/25 Voids underground Other Sheldon Gatewood Full Closure 36 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 37 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 38 Mulberry St Elm St Carroll Blvd 03/17/25 06/13/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 39 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 40 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson pavement replacement. 41 Northridge St Hinkle Or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 42 Oak St Carroll Blvd Fry St 04/21/25 06/13/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 43 Oak St Welch St Ave C 04/28/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 44 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 45 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 06/18/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 46 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 47 Ponder Ave Oak St W Broadway St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 48 Prairie St Welch St Bernard St 03/13/25 06/27/25 Utility installations I Engineering Megan Davidson Full Closure 49 Precision Or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 50 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure replacement Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 51 waterline to provide water to the new DISD elementary school 52 Robinwood Ln Live Oak Kayewood Dr 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 53 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 54 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 55 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure 56 Stuart Rd Hercules Ln Kings Row 06/09/25 06/30/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust protect 57 Sun Valley Dr Stuart Rd Atlas Dr 06/09/25 06/30/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Full Closure at Locust project 58 Sunset St University Dr W Anna St 01/20/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 59 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 60 installed,staging area and line install.Road closed to through traffic 61 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 06/30/25 Sanitary sewer work Private Development Gavin Petner Lane Closure 62 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 63 Welch St Eagle Or Hickory St 06/03/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 64 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 65 Welch St Eagle Or Highland St 03/13/25 07/04/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 66 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 67 Westway St Anna St Bolivar St 01/24/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 68 Willowwood St Westwood Dr Leslie St 03/10/25 06/18/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on June 6,2025 1:58:47 PM CDT 3 Street Closure Report: Completed Closures smartsheet Str __ Intersection • • . •- . •-1 • Description -•. - •-•. - • - •- Audra Ln Stockton St Mockingbird Ln 07/29/24 05/09/25 Connection new storm drainage Private Development Zabdiel Mote Lane Closure 1 to existing City of Denton drainage. 2 Austin St N(208) Pecan St W @ Intersection 03/31/25 05/09/25 ADA/Sidewalk Repair Streets Roy San Miguel Lane Closure Bell Ave University Dr(Hwy 380) Texas St 05/12/25 06/03/25 Waterline tap and new Atmos Drainage Christopher Yanez Full Closure installation Engineering Private 3 Development Public Works Inspections Streets Traffic TXDoT Water Wastewater 4 Bell Ave N(1000) Chappel Dr Texas St 05/12/25 06/03/25 Waterline tap and new Water Christopher Yanez Full Closure installation 5 Clear River Ln Montecito or Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure Eastpark Blvd Linden Dr Crescent St 04/28/25 05/26/25 Jobsite needs to be able to Public Works Inspections Collin Cole Full Closure 6 access the buildings with cranes but cant do that from inside jobsite 7 Ector St Emery St University Dr 04/28/25 05/26/25 Sanitary Sewer Being installed Public Works Inspections Collin Cole Lane Closure in the Northbound lane 8 Johnson St Collins St Smith St 04/14/25 05/09/25 Sewer connection Public Works Inspections Stephany Trammell Lane Closure 9 Nautical Ln Hickory Creek Rd Ocean Dr 04/28/25 05/27/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 10 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Parvin St @ Bonnie Brae St 06/09/25 06/11/25 Installation of storm drain Engineering Robin Davis Full Closure 11 infrastructure crossing Parvin- (No access to Bonnie Brae from Parvin) 12 Ryan Rd Creekside Dr Granada Trl 05/19/25 05/23/25 Sanitary Sewer improvement Public Works Inspections John Cantu Full Closure Wastewater 13 Saddle Back Dr Quarter Horse Way Highpoint Dr 04/28/25 05/15/25 Sidewalk and Panel Repairs Streets Roy San Miguel Lane Closure 14 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 15 Welch St Oak St Hickory St 04/21/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Full Closure Exported on June 6,2025 11:42:05 AM CDT