2025/06/13 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR June 16th - 22nd
Closure Start Description Department Department Contact Closure Type
Street/Intersection From To Date
1 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 07/18/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
Exported on June 13,2025 11:21:58 AM CDT
2 Street Closure Report: Current Closures smartsheet
ti t Description Department
Aileen St Panhandle St Broadway St 09/27/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 06/16/25 06/23/25 Construction of the new Engineering Robin Davis Full Closure
2 alignment of Bonnie Brae
connecting to Airport Road/FM
1515
3 Alice St Sunset St University or(US 380) 05/27/25 06/30/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
4 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
5 Ave A Collins St Eagle or 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
7 Ave B Fannin St Margie St 11/22/24 06/30/25 Pavement replacement Engineering Scott Fettig Full Closure
8 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
9 Ave G Prairie St Lousie St 03/13/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
10 Bernard St Lindsey St Fannin St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
11 Bonnie Brae St Airport Rd(FM 1515) Wait Parker or(Main Stadium Dr) 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure
pavement replacement.
Bonnie Brae St S Willowwood St Parvin St 06/16/25 10/17/25 Installation of drainage Engineering Robin Davis Full Closure
infrastructure,embankment
12 work in advance of street
widening. (Access to Natl
Wholesale&residents only)
13 Cactus Cir Yucca or (End of street)Cut de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
14 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
15 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
16 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
17 Collins St Ave A Bernard St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
18 Congress St Ponder St Colt St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
19 Congress St Ponder St Carroll Blvd 03/31/25 07/04/25 Utility construction Engineering Megan Davidson Rolling Closure
20 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
21 Crescent St Aileen St Malone St 05/21/25 07/21/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
22 Crescent St Aileen St Malone St 06/16/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
23 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
24 elevation changes in the jobsite
it is the only way to get into the
site
25 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
26 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
27 Fry St Oak St Hickory St 04/28/25 06/27/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
28 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
29 Granada Trail Granada Trail Seville Rd 06/16/25 06/27/25 installing sewer pipe Wastewater [John,
Cantu Lane Closure
30 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure
Exported on June 13,2025 11:22:11 AM CDT
Streett Intersection From To Closure Start Closure End Description Department
Date Date �Department Contact Closure Type
Hilltop Rd at Country Club Road(FM 1830) 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure
Road will be reconstructed(new
31 drainage,road,etc.)and new ,
northbound right turn lane will
be added to Country Club Road
32 Hobson Ln Forrestridge Dr Country Club Rd 05/08/25 07/01/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure
construction on Hobson
33 Huisache St Aspen or Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 06/20/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
34 Christal:Adding a turn Lane on
Masch Branch
35 Juno Ln Atlas Dr Stuart or 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
36 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
37 Margie St Ave A Ave B 11/01/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
38 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 07/12/25 Voids underground Other Sheldon Gatewood Full Closure
39 Mockingbird Ln Mingo Rd University or(U.S.380) 06/16/25 07/18/25 Bore work to install new Private Development Zabdiel Mota Lane Closure
sanitary sewer line.
40 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
41 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
42 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
43 Mulberry St Elm St Carroll Blvd 03/17/25 07/11/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
44 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson
pavement replacement.
45 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
46 Oak St Carroll Blvd Fry St 04/21/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
47 Oak St Welch St Ave C 04/28/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
48 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure
Intersection
49 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 07/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
50 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
51 Ponder Ave Oak St W Broadway St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
52 Ponder St Oak St Panhandle St 06/19/25 04/27/26 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
53 Prairie St Welch St Bernard St 03/13/25 06/27/25 Utility installations Engineering Megan Davidson Full Closure
54 Precision or Airport Rd UNIT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
55 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
56 waterline to provide water to the
new DISD elementary school
57 Robinwood Ln Live Oak Kayewood Dr 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
58 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
59 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
60 Selene or Neptune or Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure
61 Stuart Rd Hercules Ln Kings Row 06/09/25 06/30/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
62 Sun Valley Dr Stuart Rd Atlas or 06/09/25 06/30/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Full Closure
at Locust project
63 Sunset St University or W Anna St 01/20/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
64 Tawakoni or(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure
Exported on June 13,2025 11:22:11 AM CDT
Streett Intersection To Closure Start Closure End Department Contact
Date Date Description Department Closure Type
Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure
65 installed,staging area and line
install.Road closed to through
traffic
66 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 06/30/25 Sanitary sewer work Private Development Gavin Petner Lane Closure
67 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
68 Welch St Eagle or Hickory St 06/03/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
69 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
70 Welch St Eagle or Highland St 03/13/25 07/04/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
71 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
72 Westway St Anna St Bolivar St 01/24/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
73 Willowwood St Westwood Dr Leslie St 03/10/25 06/20/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on June 13,2025 11:22:11 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/ From . . •- . •-1 • Description Department Depa - • • - •-
Bell Ave I University Dr(Hwy 380) Texas St 05/12/25 06/03/25 Waterline tap and new Atmos Drainage Christopher Yanez Full Closure
installation Engineering Private
1 Development Public Works
Inspections Streets Traffic
TXDoT Water Wastewater
2 Bell Ave N(1000) Chappel Dr Texas St 05/12/25 06/03/25 Waterline tap and new Water Christopher Yanez Full Closure
installation
3 Clear River Ln Montecito Dr Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
4 Cornell Ln University Dr W Amherst Dr 06/02/25 06/12/25 Water Taps Public Works Inspections Alexander Cervantes Lane Closure
Eastpark Blvd Linden Dr Crescent St 04/28/25 05/26/25 Jobsite needs to be able to Public Works Inspections Collin Cole Full Closure
5 access the buildings with
cranes but cant do that from
inside jobsite
6 Ector St Emery St University Dr 04/28/25 05/26/25 Sanitary Sewer Being installed Public Works Inspections Collin Cole Lane Closure
in the Northbound lane
7 Nautical Ln Hickory Creek Rd Ocean Dr 04/28/25 05/27/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure
81 North Bell Ave US 380 Administration 06/12/25 06/13/25 Atmos Main Repair Atmos Sheldon Gatewood Lane Closure
9 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Parvin St @ Bonnie Brae St 06/09/25 06/11/25 Installation of storm drain Engineering Robin Davis Full Closure
10 infrastructure crossing Parvin-
(No access to Bonnie Brae from
Parvin)
11 Ryan Rd Creekside or Granada Trl 05/19/25 05/23/25 Sanitary Sewer improvement Public Works Inspections John Cantu Full Closure
Wastewater
12 Saddle Back Dr Quarter Horse Way Highpoint Dr 04/28/25 05/15/25 Sidewalk and Panel Repairs Streets Roy San Miguel Lane Closure
13 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
14 Welch St Oak St Hickory St 04/21/25 05/16/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Full Closure
Exported on June 13,2025 11:22:25 AM CDT