Loading...
2025/06/20 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR June 23rd - 29th Street/Intersection Closure Start Descriptio Department Department Contact Closure Type Date IMl- 1 Cordell St C0"St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure 2 Welch St Sycamore St Mulberry St O6/30/25 10/06/25 Full road reconstruction Engineering Megan Davidson Full Closure 3 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 utilities and Pavement replacement Engineering Dante Hale Full Closure Exported on June 20,2025 11:50:16 AM CDT 2 Street Closure Report: Current Closures smartsheet ti t Description Department Aileen St Panhandle St Broadway St 09/27/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 07/07/25 07/14/25 Construction of the new Engineering Robin Davis Full Closure 2 alignment of Bonnie Brae connecting to Airport Road/FM 1515 3 Alice St Sunset St University or(US 380) 05/27/25 06/30/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 4 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 5 Ave A Collins St Eagle or 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 7 Ave B Fannin St Margie St 11/22/24 06/30/25 Pavement replacement Engineering Scott Fettig Full Closure 8 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 9 Ave G Prairie St Lousie St 03/13/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 10 Bonnie Brae St Airport Rd(FM 1515) Walt Parker or(Main Stadium Dr) 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure pavement replacement. Bonnie Brae St S Willowwood St Parvin St 06/23/25 10/24/25 Installation of drainage Engineering Robin Davis Full Closure infrastructure,embankment 11 work in advance of street widening. (Access to Natl Wholesale&residents only) 12 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 13 Camelot St Hercules Ln Stuart Rd 04/28/25 07/01/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 14 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 15 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 16 Congress St Ponder St Coit St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 17 Congress St Ponder St Carroll Blvd 03/31/25 07/04/25 Utility construction Engineering Megan Davidson Rolling Closure 18 Crescent St Carroll Blvd Bolivar St 01/24/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 19 Crescent St Aileen St Malone St 05/21/25 07/21/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 20 Crescent St Aileen St Malone St 06/16/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 21 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 22 elevation changes in the jobsite it is the only way to get into the site 23 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 24 Emery St Alice St Dead End(West of Fulton) 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 25 Fry St Oak St Hickory St 04/28/25 06/27/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 26 Fulton St Cordell St Emery St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 27 Granada Trail Granada Trail Seville Rd 06/16/25 06/27/25 installing sewer pipe Wastewater John,Cantu Lane Closure 28 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd at Country Club Road(FM 1830) 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 29 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 30 Hobson Ln Forrestridge or Country Club Rd 05/08/25 07/01/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure construction on Hobson Exported on June 20,2025 11:50:23 AM CDT Streett Intersection From To Closure Start Closure End Date Date Description Department Department Contact Closure Type 31 Huisache St Aspen Dr Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 07/11/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 32 Christal:Adding a turn Lane on Masch Branch 33 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 34 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 35 Margie St Ave A Ave B 11/01/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 36 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 07/12/25 Voids underground Other Sheldon Gatewood Full Closure 37 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 07/18/25 Bore work to install new Private Development Zabdiel Mote Lane Closure sanitary sewer line. 38 Morse St Loop 288 Mayhill Rd 12/02/24 06/27/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 39 Mounts Ave Congress St W Haynes St 03/21/25 06/27/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 40 Mulberry St Welch St Bernard St 11/29/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 41 Mulberry St Elm St Carroll Blvd 03/17/25 07/11/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 42 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson pavement replacement. 43 Northridge St Hinkle Dr Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 44 Oak St Carroll Blvd Fry St 04/21/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 45 Oak St Welch St Ave C 04/28/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 46 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 47 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 07/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 48 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 49 Ponder Ave Oak St W Broadway St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 50 Ponder St Oak St Panhandle St 06/19/25 04/27/26 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 51 Prairie St Welch St Bernard St 03/13/25 06/27/25 Utility installations Engineering Megan Davidson Full Closure 52 Precision Or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 53 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure replacement Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/11/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 54 waterline to provide water to the new DISD elementary school 55 Robinwood Ln Live Oak Kayewood Dr 01/27/25 06/30/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 56 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 57 Robson Ranch Rd Frontage Rd(SB) Briarwood Rd 06/20/25 06/24/25 Grading of new right turn lanes Private Development Public Gary Hatfield Lane Closure Works Inspections Other 58 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 59 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure 60 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 07/18/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 61 Stuart Rd Hercules Ln Kings Row 06/09/25 06/30/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 62 Sun Valley Dr Stuart Rd Atlas Dr 06/09/25 06/30/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Full Closure at Locust project 63 Sunset St University Dr W Anna St 01/20/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 64 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 65 installed,staging area and line install.Road closed to through traffic 66 Sa Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 O6/30/25 nitary sewer work Private Development Gavin Petner Lane Closure Exported on June 20,2025 11:50:23 AM CDT Fs-t.tl I-11t.lt. From To Closure Start Closure End Date Date Description Department Department Contact Closure Type 67 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 68 Welch St Eagle or Hickory St 06/03/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 69 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 70 Welch St Eagle Dr Highland St 03/13/25 07/04/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 71 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 72 Westway St Anna St Bolivar St 01/24/25 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 73 Willowwood St Westwood Dr Leslie St 03/10/25 06/27/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on June 20,2025 11:50:23 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Description Department Department Contact Bell Ave I University Dr(Hwy 380) Texas St 05/12/25 06/03/25 Waterline tap and new Atmos Drainage Christopher Yanez Full Closure installation Engineering Private 1 Development Public Works Inspections Streets Traffic TXDoT Water Wastewater 2 Bell Ave N(1000) Chappel Dr Texas St 05/12/25 06/03/25 Waterline tap and new Water Christopher Yanez Full Closure installation 3 Bernard St Lindsey St Fannin St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 4 Clear River Ln Montecito or Sweet Cloud Way 04/07/25 05/23/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 5 Collins St Ave A Bernard St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Correll Ln University or W Amherst or 06/02/25 06/12/25 Water Taps Public Works Inspections Alexander Cervantes Lane Closure Eastpark Blvd Linden or Crescent St 04/28/25 05/26/25 Jobsite needs to be able to Public Works Inspections Collin Cole Full Closure 7 access the buildings with cranes but cant do that from inside jobsite 8 Edor St Emery St University Dr 04/28/25 05/26/25 Sanitary Sewer Being installed Public Works Inspections Collin Cole Lane Closure in the Northbound lane 9 Nautical Ln Hickory Creek Rd Ocean or 04/28/25 05/27/25 Water and Storm line tie ins Private Development Gavin Petner Lane Closure 10 North Bell Ave US 380 Administration 06/12/25 06/13/25 Atmos Main Repair Atmos Sheldon Gatewood Lane Closure 11 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Parvin St @ Bonnie Brae St 06/09/25 06/11/25 Installation of storm drain Engineering Robin Davis Full Closure 12 infrastructure crossing Parvin- (No access to Bonnie Brae from Parvin) 13 Ryan Rd Creekside or Granada Trl 05/19/25 05/23/25 Sanitary Sewer improvement Public Works Inspections John Cantu Full Closure Wastewater 14 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Exported on June 20,2025 11:50:32 AM CDT