Ir Closure Start Description Department Department Contact Closure Type
1 Apollo Dr Redstone Rd Selene Dr 07/24/25 02/13/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
Bonnie Brae St Conquest Dr Windsor Dr 07/07/25 07/21/25 Removing dirt along existing back of curb and Engineering Jesus Perez Lane Closure
removing existing large trees along the back of
2 curb in the same area.Contractor will also tie-in
new 16-inch watedine to existing 16-inch
waterline.
3 Brookside Dr(5700) Trailridge Dr At Intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
4 Sunnydala Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
Exported on June 27,2025 11:35:09 AM CDT
2 Street Closure Report: Current Closures smartsheet
ti t Description Department
Aileen St Panhandle St Broadway St 09/27/24 08/16/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 07/07/25 07/14/25 Construction of the new Engineering Robin Davis Full Closure
2 alignment of Bonnie Brae
connecting to Airport Road/FM
1515
3 Alice St Sunset St University or(US 380) 05/27/25 08/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
4 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
5 Ave A Collins St Eagle or 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Ave A Eagle or Highland St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
7 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure
8 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
9 Ave G Prairie St Lousie St 03/13/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
10 Bonnie Brae St Airport Rd(FM 1515) Walt Parker or(Main Stadium Dr) 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure
pavement replacement.
Bonnie Brae St S Willowwood St Parvin St 06/23/25 10/24/25 Installation of drainage Engineering Robin Davis Full Closure
infrastructure,embankment
11 work in advance of street
widening. (Access to Natl
Wholesale&residents only)
12 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
13 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
14 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
15 Congress St Ponder St Carroll Blvd 03/31/25 07/04/25 Utility construction Engineering Megan Davidson Rolling Closure
16 Congress St Ponder St Coit St 02/03/25 09/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
17 Cordell St Colt St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure
18 Crescent St Aileen St Malone St 05/21/25 07/21/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
19 Crescent St Carroll Blvd Bolivar St 01/24/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Crescent St Aileen St Malone St 06/16/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
21 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
22 elevation changes in the jobsite
it is the only way to get into the
site
23 Ector St Cordell St University or(US380) 06/30/25 07/30/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure
Manholes,pipe,paving
24 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
25 Emery St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
26 Fry St Oak St Hickory St 04/28/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
27 Fulton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
28 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure
Hilltop Rd at Country Club Road(FM 1830) 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure
Road will be reconstructed(new
29 drainage,road,etc.)and new
northbound right turn lane will
be added to Country Club Road
30 Hobson Ln Forrestridge or Country Club Rd 05/08/25 07/01/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure
construction on Hobson
Exported on June 27,2025 11:35:17 AM CDT
Streett Intersection From To Closure Start Closure End
Date Date Description Department Department Contact Closure Type
31 Huisache St Aspen or Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 07/11/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
32 Christal:Adding a turn Lane on
Masch Branch
33 Juno Ln Atlas or Stuart or 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
34 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
35 Margie St Ave A Ave B 11/01/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
36 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 07/12/25 Voids underground Other Sheldon Gatewood Full Closure
37 Mockingbird Ln Mingo Rd University or(U.S.380) 06/16/25 07/18/25 Bore work to install new Private Development Zabdiel Mote Lane Closure
sanitary sewer line.
38 Mounts Ave Congress St W Haynes St 03/21/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
39 Mulberry St Elm St Carroll Blvd 03/17/25 07/11/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
40 Mulberry St Welch St Bernard St 11/29/24 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
41 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson
pavement replacement.
42 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
43 Oak St Carroll Blvd Fry St 04/21/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
44 Oak St Welch St Ave C 04/28/25 07/11/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
45 Oak St E(109) Austin St at Intersection 05/19/25 07/04/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure
Intersection
46 Ocean or Atlantic or Nautical Ln 04/14/25 07/15/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
47 Pershing Dr Atlas or Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
48 Ponder Ave Oak St W Broadway St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
49 Ponder St Oak St Panhandle St 06/19/25 04/27/26 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
50 Prairie St Welch St Bernard St 03/13/25 07/25/25 Utility installations Engineering Megan Davidson Full Closure
51 Precision or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
52 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
53 waterline to provide water to the
new DISD elementary school
54 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/12/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
55 Robinwood Ln Live Oak Kayewood or 01/27/25 07/31/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
56 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
57 Selene or Neptune or Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure
58 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 07/18/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
59 Stuart Rd Hercules Ln Kings Row 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
60 Sun Valley Dr Stuart Rd Atlas or 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Full Closure
at Locust project
61 Sunset St University or W Anna St 01/20/25 08/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure
62 installed,staging area and line
install.Road closed to through
traffic
63 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 06/30/25 Sanitary sewer work Private Development Gavin Petner Lane Closure
64 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
65 Welch St Chestnut St Mulberry St 02/03/25 07/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on June 27,2025 11:35:17 AM CDT
Streett Intersection To Closure Start Closure End Description Department Department Contact Closure Type
Date Date
66 Welch St Eagle or Highland St 03/13/25 07/04/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
67 Welch St Highland St Hickory St 08/26/24 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
68 Welch St Eagle or Hickory St 06/03/24 10/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
69 Welch St Sycamore St Mulberry St 06/30/25 10/06/25 Full road reconstruction Engineering Megan Davidson Full Closure
70 Westway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
71 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Exported on June 27,2025 11:35:17 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Description Department Department Contact
Bell Ave I University Dr(Hwy 380) Texas St 05/12/25 06/03/25 Waterline tap and new Atmos Drainage Christopher Yanez Full Closure
installation Engineering Private
1 Development Public Works
Inspections Streets Traffic
TXDoT Water Wastewater
2 Bell Ave N(1000) Chappel Dr Texas St 05/12/25 06/03/25 Waterline tap and new Water Christopher Yanez Full Closure
installation
3 Bernard St Lindsey St Fannin St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
4 Camelot St Hercules Ln Stuart Rd 04/28/25 06/27/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
5 Collins St Ave A Bernard St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Correll Ln University or W Amherst or 06/02/25 06/12/25 Water Taps Public Works Inspections Alexander Cervantes Lane Closure
7 Granada Trail Granada Trail Seville Rd 06/16/25 06/27/25 installing sewer pipe Wastewater John,Cantu Lane Closure
8 Morse St Loop 288 Mayhill Rd 12/02/24 06/20/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
9 North Bell Ave US 380 Administration 06/12/25 06/13/25 Atmos Main Repair Atmos Sheldon Gatewood Lane Closure
10 Panhandle St Ector St Aileen St 09/27/24 05/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Parvin St @ Bonnie Brae St 06/09/25 06/11/25 Installation of storm drain Engineering Robin Davis Full Closure
11 infrastructure crossing Parvin-
(No access to Bonnie Brae from
Parvin)
12 Robson Ranch Rd Frontage Rd(SB) Briarwood Rd 06/20/25 06/24/25 Grading of new right turn lanes Private Development Public Gary Hatfield Lane Closure
Works Inspections Other
13 Tawakoni or(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure
14 Trinity Rd McKinney St Blagg Rd 05/05/25 06/06/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
15 Willowwood St Westwood Dr Leslie St 03/10/25 06/27/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install