Loading...
2025/07/11 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR July 14th - 20th Street/Intersection From To Closure Start Descriptio Department Department Contact Closure Type Date IMI 1 Apollo Dr Redstone Rd Selene Dr 07/24/25 1211,16 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 2 Brookside Dr(5700) Trailridge Dr @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure Exported on July 11,2025 12:22:38 PM CDT 2 Street Closure Report: Current Closures smartsheet Description Department Department Contact Aileen St Panhandle St Cordell St 09/27/24 08/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 07/07/25 07/14/25 Construction of the new Engineering Robin Davis Full Closure 2 alignment of Bonnie Brae connecting to Airport Road/FM 1515 3 Alice St Sunset St University or(US 380) 05/27/25 08/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 4 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 5 Ave A Eagle or Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 6 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure 7 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 8 Ave G Prairie St Louise St 03/13/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 9 Bonnie Brae St Airport Rd(FM 1515) Wait Parker or(Main Stadium Dr) 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure pavement replacement. Bonnie Brae St Conquest Dr Windsor or 07/07/25 07/21/25 Removing dirt along existing Engineering Jesus Perez Lane Closure back of curb and removing existing large trees along the 10 back of curb in the same area. Contractor will also lie-in new 16-inch waterline to existing 16- inch waterline. Bonnie Brae St Conquest Dr North Lakes Park 07/07/25 08/08/25 Contractor will be demolishing Engineering Jesus Perez Full Closure the existing street intersection of Bonnie Brae and Riney Road. The Contractor will 11 construct the new concrete street intersection. Contractor has built a temporary concrete pavement detour to allow traffic to keep moving north and south. Bonnie Brae St S Willowwood St Parvin St 06/23/25 10/24/25 Installation of drainage Engineering Robin Davis Full Closure infrastructure,embankment 12 work in advance of street widening. (Access to Natl Wholesale&residents only) 13 Cactus Cir Yucca or (End of street)Cut de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 14 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 15 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 16 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure pavement replacement 17 Congress St W Malone St Bryan St 01/31/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 18 Cordell St Coit St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure 19 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 20 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 21 Eagle or Welch St @ intersection 07/17/25 07/17/25 Asphalt repair on intersection of Public Works Inspections Christopher Yanez Lane Closure Welch and Eagle or Streets Traffic Water Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 22 elevation changes in the jobsite it is the only way to get into the site 23 Ector St Cordell St University or(US380) 06/30/25 07/30/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure Manholes,pipe,paving 24 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 25 Emery St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Fry St Oak St Hickory St 04/28/25 07/25/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure Exported on July 11,2025 12:22:52 PM CDT Streett Intersection From To Closure Start Closure End Description Department Date Date Department Contact Closure Type 27 Fulton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 28 Hickory Creek Rd Riverpass Dr Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 29 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 30 Hobson Ln Forrestridge Dr Country Club Rd 05/08/25 07/25/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure construction on Hobson 31 Huisache St Aspen Dr Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 08/11/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 32 Christal:Adding a turn Lane on Masch Branch 33 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 34 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 07/31/25 Voids underground Other Sheldon Gatewood Full Closure 35 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 07/18/25 Bore work to install new Private Development Zabdiel Mote Lane Closure sanitary sewer line. 36 Mounts Ave Congress St W Haynes St 03/21/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 37 Mulberry St Welch St Bernard St 11/29/24 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 38 Mulberry St Elm St Carroll Blvd 03/17/25 08/01/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 39 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson pavement replacement. 40 Northridge St Hinkle Or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 41 Oak St Carroll Blvd Fry St 04/21/25 07/25/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 42 Oak St Welch St Ave C 04/28/25 07/25/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 43 Oak St E(109) Austin St @ intersection 05/19/25 08/01/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 44 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 07/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 45 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 46 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 47 Prairie St Welch St Bernard St 03/13/25 07/25/25 Utility installations Engineering Megan Davidson Full Closure 48 Precision Or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 49 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure replacement Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 50 waterline to provide water to the new DISD elementary school 51 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 52 Robinwood Ln Live Oak Kayewood Dr 01/27/25 07/31/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 53 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 54 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure 55 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 07/18/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 56 Stuart Rd Hercules Ln Kings Row 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 57 Sun Valley or Stuart Rd Atlas Dr 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Full Closure at Locust project 58 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 59 Sunset St Carroll Blvd Bolivar St 07/07/25 08/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 60 Sunset St University Dr W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on July 11,2025 12:22:52 PM CDT Streett Intersection To Closure Start Closure End —FDep.,tment Contact Closure Type Date Date Description Department Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 61 installed,staging area and line install.Road closed to through traffic 62 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 63 Welch St Eagle Dr Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 64 Weslway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 65 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Exported on July 11,2025 12:22:52 PM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Description Department Department Contact Closure Type 1 Ave A Collins St Eagle Dr 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Bernard St Lindsey St Fannin St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 8 Camelot St Hercules Ln Stuart Rd 04/28/25 06/27/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 4 Collins St Ave A Bernard St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Cornell Ln University Dr W Amherst Dr 06/02/25 06/12/25 Water Taps Public Works Inspections Alexander Cervantes Lane Closure 6 Granada Trail Granada Trail Seville Rd 06/16/25 06/27/25 installing sewer pipe Wastewater John,Cantu Lane Closure 7 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 8 Margie St Ave A Ave B 11/01/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Morse St Loop 288 Mayhill Rd 12/02/24 06/20/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure Road Reconstruction Streets Water 10 North Bell Ave US 380 Administration 06/12/25 06/13/25 Atmos Main Repair Atmos Sheldon Gatewood Lane Closure Parvin St @ Bonnie Brae St 06/09/25 06/11/25 Installation of storm drain Engineering Robin Davis Full Closure 11 infrastructure crossing Parvin- (No access to Bonnie Brae from Parvin) 12 Robson Ranch Rd Frontage Rd(SB) Briarwood Rd 06/20/25 06/24/25 Grading of new right turn lanes Private Development Public Gary Hatfield Lane Closure Works Inspections Other 13 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure 14 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 06/30/25 Sanitary sewer work Private Development Gavin Petner Lane Closure 15 Willowwood St Westwood Dr Leslie St 03/10/25 06/27/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on July 11,2025 12:23:06 PM CDT