2025/07/11 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR July 14th - 20th
Street/Intersection From To Closure Start Descriptio Department Department Contact Closure Type
Date IMI
1 Apollo Dr Redstone Rd Selene Dr 07/24/25 1211,16 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
2 Brookside Dr(5700) Trailridge Dr @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
Exported on July 11,2025 12:22:38 PM CDT
2 Street Closure Report: Current Closures smartsheet
Description Department Department Contact
Aileen St Panhandle St Cordell St 09/27/24 08/16/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 07/07/25 07/14/25 Construction of the new Engineering Robin Davis Full Closure
2 alignment of Bonnie Brae
connecting to Airport Road/FM
1515
3 Alice St Sunset St University or(US 380) 05/27/25 08/01/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
4 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
5 Ave A Eagle or Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
6 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure
7 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
8 Ave G Prairie St Louise St 03/13/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
9 Bonnie Brae St Airport Rd(FM 1515) Wait Parker or(Main Stadium Dr) 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure
pavement replacement.
Bonnie Brae St Conquest Dr Windsor or 07/07/25 07/21/25 Removing dirt along existing Engineering Jesus Perez Lane Closure
back of curb and removing
existing large trees along the
10 back of curb in the same area.
Contractor will also lie-in new
16-inch waterline to existing 16-
inch waterline.
Bonnie Brae St Conquest Dr North Lakes Park 07/07/25 08/08/25 Contractor will be demolishing Engineering Jesus Perez Full Closure
the existing street intersection
of Bonnie Brae and Riney
Road. The Contractor will
11 construct the new concrete
street intersection. Contractor
has built a temporary concrete
pavement detour to allow traffic
to keep moving north and south.
Bonnie Brae St S Willowwood St Parvin St 06/23/25 10/24/25 Installation of drainage Engineering Robin Davis Full Closure
infrastructure,embankment
12 work in advance of street
widening. (Access to Natl
Wholesale&residents only)
13 Cactus Cir Yucca or (End of street)Cut de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
14 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
15 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
16 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure
pavement replacement
17 Congress St W Malone St Bryan St 01/31/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
18 Cordell St Coit St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure
19 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
20 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
21 Eagle or Welch St @ intersection 07/17/25 07/17/25 Asphalt repair on intersection of Public Works Inspections Christopher Yanez Lane Closure
Welch and Eagle or Streets Traffic Water
Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
22 elevation changes in the jobsite
it is the only way to get into the
site
23 Ector St Cordell St University or(US380) 06/30/25 07/30/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure
Manholes,pipe,paving
24 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
25 Emery St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
26 Fry St Oak St Hickory St 04/28/25 07/25/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
Exported on July 11,2025 12:22:52 PM CDT
Streett Intersection From To Closure Start Closure End Description Department
Date Date Department Contact Closure Type
27 Fulton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
28 Hickory Creek Rd Riverpass Dr Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure
Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure
Road will be reconstructed(new
29 drainage,road,etc.)and new
northbound right turn lane will
be added to Country Club Road
30 Hobson Ln Forrestridge Dr Country Club Rd 05/08/25 07/25/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure
construction on Hobson
31 Huisache St Aspen Dr Yucca Dr 04/09/25 08/08/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 08/11/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
32 Christal:Adding a turn Lane on
Masch Branch
33 Juno Ln Atlas Dr Stuart Dr 04/09/25 08/08/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
34 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 07/31/25 Voids underground Other Sheldon Gatewood Full Closure
35 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 07/18/25 Bore work to install new Private Development Zabdiel Mote Lane Closure
sanitary sewer line.
36 Mounts Ave Congress St W Haynes St 03/21/25 07/25/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
37 Mulberry St Welch St Bernard St 11/29/24 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
38 Mulberry St Elm St Carroll Blvd 03/17/25 08/01/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
39 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson
pavement replacement.
40 Northridge St Hinkle Or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
41 Oak St Carroll Blvd Fry St 04/21/25 07/25/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
42 Oak St Welch St Ave C 04/28/25 07/25/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
43 Oak St E(109) Austin St @ intersection 05/19/25 08/01/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure
Intersection
44 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 07/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
45 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
46 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
47 Prairie St Welch St Bernard St 03/13/25 07/25/25 Utility installations Engineering Megan Davidson Full Closure
48 Precision Or Airport Rd LINT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
49 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
50 waterline to provide water to the
new DISD elementary school
51 Robinwood Ln Emerson Ln Live Oak St 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
52 Robinwood Ln Live Oak Kayewood Dr 01/27/25 07/31/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
53 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
54 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure
55 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 07/18/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
56 Stuart Rd Hercules Ln Kings Row 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
57 Sun Valley or Stuart Rd Atlas Dr 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Full Closure
at Locust project
58 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
59 Sunset St Carroll Blvd Bolivar St 07/07/25 08/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
60 Sunset St University Dr W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on July 11,2025 12:22:52 PM CDT
Streett Intersection To Closure Start Closure End —FDep.,tment Contact Closure Type
Date Date Description Department
Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure
61 installed,staging area and line
install.Road closed to through
traffic
62 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
63 Welch St Eagle Dr Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
64 Weslway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
65 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Exported on July 11,2025 12:22:52 PM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Description Department Department Contact Closure Type
1 Ave A Collins St Eagle Dr 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2 Bernard St Lindsey St Fannin St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
8 Camelot St Hercules Ln Stuart Rd 04/28/25 06/27/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
4 Collins St Ave A Bernard St 08/26/24 06/20/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Cornell Ln University Dr W Amherst Dr 06/02/25 06/12/25 Water Taps Public Works Inspections Alexander Cervantes Lane Closure
6 Granada Trail Granada Trail Seville Rd 06/16/25 06/27/25 installing sewer pipe Wastewater John,Cantu Lane Closure
7 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
8 Margie St Ave A Ave B 11/01/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Morse St Loop 288 Mayhill Rd 12/02/24 06/20/25 Water Line Replacement and Public Works Inspections Kristine Stewart Lane Closure
Road Reconstruction Streets Water
10 North Bell Ave US 380 Administration 06/12/25 06/13/25 Atmos Main Repair Atmos Sheldon Gatewood Lane Closure
Parvin St @ Bonnie Brae St 06/09/25 06/11/25 Installation of storm drain Engineering Robin Davis Full Closure
11 infrastructure crossing Parvin-
(No access to Bonnie Brae from
Parvin)
12 Robson Ranch Rd Frontage Rd(SB) Briarwood Rd 06/20/25 06/24/25 Grading of new right turn lanes Private Development Public Gary Hatfield Lane Closure
Works Inspections Other
13 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure
14 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 06/30/25 Sanitary sewer work Private Development Gavin Petner Lane Closure
15 Willowwood St Westwood Dr Leslie St 03/10/25 06/27/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure
storm sewer install
Exported on July 11,2025 12:23:06 PM CDT