2025/07/25 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR July 28th - Aug 3rd Street/Intersection From Closure Start Date Description Department Department Contact Closure Type Bonnie Brae St S Willowwood St Parvin St 09/08/25 12111121 Installation of drainage infrastructure, Engineering Robin Davis Full Closure 1 embankment work in advance of street widening.(Access to Natl Wholesale& residents only) 2 Kings Row Stuart Rd Valley View Rd 08/04/25 08/08/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure 3 Scripture St Bonnie Brae St 1-35 Service Rd 08/18/25 08/22/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure Exported on July 25,2025 12:11:43 PM CDT 2 Street Closure Report: Current Closures smartsheet a re End Description J Department Department Contact ��Il Aileen St Panhandle St Cordell St 09/27/24 08/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Airport Road/FM 1515 135 E Service Rd 135 W Service Rd 07/30/25 08/18/25 Paving work by both City and Engineering Robin Davis Full Closure TxDot contractors for the 35E, 2 Bonnie Brae and Airport Road projects.(USE WESTERN BLVD) 3 Alice St Sunset St University or(US 380) 05/27/25 08/01/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 4 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 5 Apollo Dr Redstone Rd Selene Dr 07/24/25 02/13/26 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Ave A Eagle or Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 7 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure 8 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 9 Ave G Prairie St Louise St 03/13/25 09/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Bonnie Brae St Conquest Dr North Lakes Park 07/07/25 08/08/25 Contractor will be demolishing Engineering Jesus Perez Full Closure the existing street intersection of Bonnie Brae and Riney Road. The Contractor will 10 construct the new concrete street intersection. Contractor has built a temporary concrete pavement detour to allow traffic to keep moving north and south. Bonnie Brae St S 135 E Walt Parker or 07/30/25 08/18/25 Paving work by both City and Robin Davis Full Closure 11 TxDot contractors for the 35E, Bonnie Brae and Airport Road projects. 12 Brookside or(5700) Trailridge or @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 13 Cactus Cir Yucca or (End of street)Cut de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 14 Carlton St Aileen St Malone St 07/23/25 09/19/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 15 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 16 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 17 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure pavement replacement 18 Congress St W Malone St Bryan St 01/31/25 08/22/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 19 Cordell St Coit St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure 20 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 21 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 22 elevation changes in the jobsite it is the only way to get into the site 23 Ector St Cordell St University or(US380) 06/30/25 08/30/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure Manholes,pipe,paving 24 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 25 Emery St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Fry St Oak St Hickory St 04/28/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 27 Fulton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Glenwood or Kayewood or Mistywood Ln 07/21/25 08/31/25 Drainage Cut across Glenwood Drainage Sheldon Gatewood Full Closure 28 to remove and install new Junction Box Exported on July 25,2025 12:11:50 PM CDT Fs-tleett ti.11 From To Closure Start Closure End Date Date Description Department Department Contact Closure Type 29 Hercules Ln(East bound) Redstone Rd Stuart Rd 07/18/25 07/31/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 30 Hercules Ln(West bound) Redstone Rd Stuart Rd 07/21/25 08/02/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 31 Hickory Creek Rd Riverpass Dr Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering I Tracy Beck Full Closure Road will be reconstructed(new 32 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 33 Huisache St Aspen or Yucca Dr 04/09/25 09/05/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 08/11/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 34 Christal:Adding a turn Lane on Masch Branch 35 Juno Ln Atlas Dr Stuart Dr 04/09/25 09/12/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 36 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 08/31/25 Voids underground Other Sheldon Gatewood Full Closure 37 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 08/01/25 Bore work to install new Private Development Zabdiel Mote Lane Closure sanitary sewer line. 38 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 39 Mulberry St Welch St Bernard St 11/29/24 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 40 Mulberry St Elm St Carroll Blvd 03/17/25 08/01/25 WaterM/astewater connections Public Works Inspections Stephany Trammell Full Closure 41 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson pavement replacement. 42 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 43 Oak St Carroll Blvd Fry St 04/21/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 44 Oak St Welch St Ave C 04/28/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 45 Oak St E(109) Austin St @ intersection 05/19/25 08/01/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 46 Ocean or Atlantic Dr Nautical Ln 04/14/25 07/30/25 Sanitary Sewer install Private Development Gavin Petner Full Closure Parvin St Larkhall Ln Bonnie Brae St 07/21/25 09/05/25 Installation of Drainage Engineering Robin Davis Full Closure Infrastructure crossing Parvin 47 near Bonnie Brae. NO ACCESS TO BONNIE BRAE FROM PARVIN-Use Willowwood 48 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 49 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 50 Precision or Airport Rd UNIT Library Annex 04/01/25 07/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 51 Redstone Rd Hercules Ln Neptune Or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure replacement Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/01/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 52 waterline to provide water to the new DISD elementary school 53 Robinwood Ln Emerson Ln Live Oak St 11/12/24 08/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 54 Robinwood Ln Live Oak St Kayewood or 01/27/25 08/31/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 55 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 56 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure 57 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 08/08/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 58 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 59 Sunset St Carroll Blvd Bolivar St 07/07/25 08/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 60 Sunset St University Dr W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on July 25,2025 12:11:50 PM CDT Streett Intersection To Closure Start Closure End —[Dep.rtment Contact Closure Type Date Date Description Department Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 61 installed,staging area and line install.Road closed to through traffic 62 Unicorn Lake Blvd State School Rd Shoreline Dr 07/03/25 07/30/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure paving repair 63 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 64 Welch St Eagle or Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 65 Westway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 66 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Exported on July 25,2025 12:11:50 PM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection V From Description Department Department Contact Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 07/07/25 07/14/25 Construction of the new Engineering Robin Davis Full Closure 1 alignment of Bonnie Brae connecting to Airport Road/FM 1515 2 Ave A Collins St Eagle Dr 10/08/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 3 Bonnie Brae St Airport Rd(FM 1515) Walt Parker Dr(Main Stadium 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure Dr) pavement replacement. Bonnie Brae St Conquest Dr Windsor Dr 07/07/25 07/21/25 Removing dirt along existing Engineering Jesus Perez Lane Closure back of curb and removing existing 4 back of cub trees along in a the me are a. Contractor will also tie-in new 16-inch waterline to existing 16- inch waterline. 5 Camelot St Hercules Ln Stuart Rd 04/28/25 06/27/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 6 Eagle Dr Welch St @ intersection 07/17/25 07/17/25 Asphalt repair on intersection of Public Works Inspections Christopher Yanez Lane Closure Welch and Eagle or Streets Traffic Water 7 Granada Trail Granada Trail Seville Rd 06/16/25 06/27/25 installing sewer pipe Wastewater John,Cantu Lane Closure 8 Hobson Ln Forrestridge or Country Club Rd 05/08/25 07/25/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure construction on Hobson 9 La Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 10 Margie St Ave A Ave B 11/01/24 06/30/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Prairie St Welch St Bernard St 03/13/25 07/25/25 Utility installations Engineering Megan Davidson Full Closure 12 Robson Rd 1-35W Orangewood Trail 07/18/25 07/21/25 Adding right turn lanes for Public Works Inspections Gary Hatfield Lane Closure Hunter's Ranch 13 Stuart Rd Hercules Ln Kings Row 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 14 Sun Valley Dr Stuart Rd Atlas or 06/09/25 07/25/25 Asphalt repairs for Landmark at Public Works Inspections Alexander Cervantes Full Closure Locust project 15 Tawakoni Dr(5908) Amistad Ln at Intersection 05/19/25 06/27/25 ADA Ramp Repair Streets Roy San Miguel Lane Closure 16 Unicorn Lake Blvd State School Rd Wind River Ln 03/25/25 06/30/25 Sanitary sewer work Private Development Gavin Petner Lane Closure 17 Willowwood St Westwood or Leslie St 03/10/25 06/27/25 Sanitary sewer,water and Private Development Gavin Petner Lane Closure storm sewer install Exported on July 25,2025 12:11:56 PM CDT