2025/08/01 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Aug 4th - 10th
Closure Start
Street/Intersection From Date Description Department Department Contact Closure Type
Bonnie Brae St S Willowwood St P—in St 09/08/25 12/19/25 Installation of drainage infrastructure, Engineering Robin Davis Full Closure
1 embankment work in advance of street
widening.(Access to Natl Wholesale&
residents only)
2 Scripture St Bonnie Brae St I-35 Service Rd 08/18/25 08/22/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure
Exported on August 1,2025 11:50:05 AM CDT
2 Street Closure Report: Current Closures smartsheet
a re End Description J Department Department Contact ��Il
Aileen St Panhandle St Cordell St 09/27/24 08/16/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Airport Rd(FM 1515) 135 E Service Rd 135 W Service Rd 07/30/25 08/18/25 Paving work by both City and Engineering Robin Davis Full Closure
TxDot contractors for the 35E,
Bonnie Brae and Airport Road
projects.(USE WESTERN
BLVD)
Alice St Sunset St University or(US 380) 05/27/25 10/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
Apollo or Redstone Rd Selene Dr 07/24/25 02/13/26 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
7 Ave G Prairie St Louise St 03/13/25 09/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
Bonnie Brae St Conquest or North Lakes Park 07/07/25 08/08/25 Contractor will be demolishing Engineering Jesus Perez Full Closure
the existing street intersection
of Bonnie Brae and Riney
Road. The Contractor will
8 construct the new concrete
street intersection. Contractor
has built a temporary concrete
pavement detour to allow traffic
to keep moving north and south.
Bonnie Brae St S 135 E Walt Parker or 07/30/25 08/18/25 Paving work by both City and Robin Davis Full Closure
9 TxDot contractors for the 35E,
Bonnie Brae and Airport Road
projects.
10 Brookside or(5700) Trailridge or @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
11 Cactus Cir Yucca or (End of street)Cut de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
12 Carlton St Aileen St Malone St 07/23/25 09/19/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
14 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure
pavement replacement
15 Congress St W Malone St Bryan St 01/31/25 08/22/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
16 Cordell St Colt St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure
17 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
18 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
19 elevation changes in the jobsite
it is the only way to get into the
site
20 Ector St Cordell St University or(US380) 06/30/25 08/30/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure
Manholes,pipe,paving
21 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
22 Fannin St S Ave B McCormick st 08/01/25 08/15/25 Utility work for PCM24-0012 Public Works Inspections Alexander Cervantes Lane Closure
23 Fry St Oak St Hickory St 04/28/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
Glenwood or Kayewood or Mistywood Ln 07/21/25 08/31/25 Drainage Cut across Glenwood Drainage Sheldon Gatewood Full Closure
24 to remove and install new
Junction Box
25 Hercules Ln(East bound) Redstone Rd Stuart Rd 07/18/25 08/08/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
26 Hercules Ln(West bound) Redstone Rd Stuart Rd 07/21/25 08/08/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
27 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure
Exported on August 1,2025 11:50:23 AM CDT
Streett Intersection From To Closure Start Closure End Description Department
Date Date �Department Contact Closure Type
Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure
Road will be reconstructed(new
28 drainage,road,etc.)and new
northbound right turn lane will
be added to Country Club Road
29 Hobson Ln Forrestridge or Country Club Rd 05/08/25 08/14/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure
construction on Hobson
30 Hobson Ln Forrestridge or Country Club Rd 07/29/25 08/30/25 Patching asphalt on existing Private Development Gavin Petner Full Closure
road
31 Huisache St Aspen or Yucca or 04/09/25 09/05/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 08/11/25 Adding 2 Lanes EM/on Jim Public Works Inspections Kirk Winter Lane Closure
32 Christal:Adding a turn Lane on
Masch Branch
33 Juno Ln Atlas or Stuart or 04/09/25 09/12/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
34 Kings Row Stuart Rd Valley View Rd 08/04/25 08/08/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
35 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 08/31/25 Voids underground Other Sheldon Gatewood Full Closure
36 Mockingbird Ln Mingo Rd University or(U.S.380) 06/16/25 08/15/25 Bore work to install new Private Development Zabdiel Mote Lane Closure
sanitary sewer line.
37 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
38 Mulberry St Elm St Carroll Blvd 03/17/25 08/22/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
39 Mulberry St Welch St Bernard St 11/29/24 10/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
40 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson
pavement replacement.
41 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
42 Oak St Carroll Blvd Fry St 04/21/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
43 Oak St Welch St Ave C 04/28/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
44 Oak St E(109) Austin St @ intersection 05/19/25 08/22/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure
Intersection
45 Ocean or Atlantic or Nautical Ln 04/14/25 08/14/25 Sanitary Sewer install Private Development Gavin Petner Full Closure
46 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 08/31/25 Paving driveway approaches/ Private Development Public Ryan Donaldson Lane Closure
sidewalks. Works Inspections
Parvin St Larkhall Ln Bonnie Brae St 07/21/25 09/05/25 Installation of Drainage Engineering Robin Davis Full Closure
Infrastructure crossing Parvin
47 near Bonnie Brae. NO
ACCESS TO BONNIE BRAE
FROM PARVIN-Use
Willowwood
48 Pershing or Atlas or Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
49 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
50 Precision or Airport Rd UNIT Library Annex 04/01/25 08/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure
51 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/08/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
52 waterline to provide water to the
new DISD elementary school
53 Robinwood Ln Emerson Ln Live Oak St 11/12/24 08/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
54 Robinwood Ln Live Oak St Kayewood or 01/27/25 08/31/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
55 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
56 Selene or Neptune or Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure
57 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 08/08/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
58 Sunnydale Ln Sun Valley or Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
59 Sunset St Carroll Blvd Bolivar St 07/07/25 08/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on August 1,2025 11:50:23 AM CDT
Streett Intersection From To Closure Start Closure End Description Department
Date Date Department Contact Closure Type
60 Sunset St University or W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure
61 installed,staging area and line
install.Road closed to through
traffic
62 Unicorn Lake Blvd State School Rd Shoreline Dr 07/03/25 08/14/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure
paving repair
63 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
64 Welch St Eagle or Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
65 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Exported on August 1,2025 11:50:23 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection V From Description Department Department Contact
Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 07/07/25 07/14/25 Construction of the new Engineering Robin Davis Full Closure
1 alignment of Bonnie Brae
connecting to Airport Road/FM
1515
2 Ave A Eagle Dr Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
3 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure
4 Bonnie Brae St Airport Rd(FM 1515) Walt Parker Dr(Main Stadium 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure
Dr) pavement replacement.
Bonnie Brae St Conquest or Windsor or 07/07/25 07/21/25 Removing dirt along existing Engineering Jesus Perez Lane Closure
back of curb and removing
existing large trees along the
5 back of curb in the same area.
Contractor will also tie-in new
16-inch waterline to existing 16-
inch waterline.
6 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
7 Eagle Dr Welch St @ intersection 07/17/25 07/17/25 Asphalt repair on intersection of Public Works Inspections Christopher Yanez Lane Closure
Welch and Eagle or Streets Traffic Water
8 Frnye St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9lton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
11 Prairie St Welch St Bernard St 03/13/25 07/25/25 Utility installations Engineering Megan Davidson Full Closure
12 Robson Rd 1-35W Orangewood Trail 07/18/25 07/21/25 Adding right turn lanes for Public Works Inspections Gary Hatfield Lane Closure
Hunter's Ranch
13 Stuart Rd Hercules Ln Kings Row 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
14 Sun Valley or Stuart Rd Atlas or 06/09/25 07/25/25 Asphalt repairs for Landmark at Public Works Inspections Alexander Cervantes Full Closure
Locust project
15 Westway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on August 1,2025 11:50:37 AM CDT