Loading...
2025/08/01 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Aug 4th - 10th Closure Start Street/Intersection From Date Description Department Department Contact Closure Type Bonnie Brae St S Willowwood St P—in St 09/08/25 12/19/25 Installation of drainage infrastructure, Engineering Robin Davis Full Closure 1 embankment work in advance of street widening.(Access to Natl Wholesale& residents only) 2 Scripture St Bonnie Brae St I-35 Service Rd 08/18/25 08/22/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure Exported on August 1,2025 11:50:05 AM CDT 2 Street Closure Report: Current Closures smartsheet a re End Description J Department Department Contact ��Il Aileen St Panhandle St Cordell St 09/27/24 08/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Airport Rd(FM 1515) 135 E Service Rd 135 W Service Rd 07/30/25 08/18/25 Paving work by both City and Engineering Robin Davis Full Closure TxDot contractors for the 35E, Bonnie Brae and Airport Road projects.(USE WESTERN BLVD) Alice St Sunset St University or(US 380) 05/27/25 10/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. Apollo or Redstone Rd Selene Dr 07/24/25 02/13/26 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 7 Ave G Prairie St Louise St 03/13/25 09/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Bonnie Brae St Conquest or North Lakes Park 07/07/25 08/08/25 Contractor will be demolishing Engineering Jesus Perez Full Closure the existing street intersection of Bonnie Brae and Riney Road. The Contractor will 8 construct the new concrete street intersection. Contractor has built a temporary concrete pavement detour to allow traffic to keep moving north and south. Bonnie Brae St S 135 E Walt Parker or 07/30/25 08/18/25 Paving work by both City and Robin Davis Full Closure 9 TxDot contractors for the 35E, Bonnie Brae and Airport Road projects. 10 Brookside or(5700) Trailridge or @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 11 Cactus Cir Yucca or (End of street)Cut de sac 04/28/25 09/02/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 12 Carlton St Aileen St Malone St 07/23/25 09/19/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 14 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure pavement replacement 15 Congress St W Malone St Bryan St 01/31/25 08/22/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 16 Cordell St Colt St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure 17 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 18 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 19 elevation changes in the jobsite it is the only way to get into the site 20 Ector St Cordell St University or(US380) 06/30/25 08/30/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure Manholes,pipe,paving 21 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 22 Fannin St S Ave B McCormick st 08/01/25 08/15/25 Utility work for PCM24-0012 Public Works Inspections Alexander Cervantes Lane Closure 23 Fry St Oak St Hickory St 04/28/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure Glenwood or Kayewood or Mistywood Ln 07/21/25 08/31/25 Drainage Cut across Glenwood Drainage Sheldon Gatewood Full Closure 24 to remove and install new Junction Box 25 Hercules Ln(East bound) Redstone Rd Stuart Rd 07/18/25 08/08/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 26 Hercules Ln(West bound) Redstone Rd Stuart Rd 07/21/25 08/08/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 27 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Exported on August 1,2025 11:50:23 AM CDT Streett Intersection From To Closure Start Closure End Description Department Date Date �Department Contact Closure Type Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 28 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 29 Hobson Ln Forrestridge or Country Club Rd 05/08/25 08/14/25 Utility work and turn lane Public Works Inspections Gavin Petner Full Closure construction on Hobson 30 Hobson Ln Forrestridge or Country Club Rd 07/29/25 08/30/25 Patching asphalt on existing Private Development Gavin Petner Full Closure road 31 Huisache St Aspen or Yucca or 04/09/25 09/05/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 08/11/25 Adding 2 Lanes EM/on Jim Public Works Inspections Kirk Winter Lane Closure 32 Christal:Adding a turn Lane on Masch Branch 33 Juno Ln Atlas or Stuart or 04/09/25 09/12/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 34 Kings Row Stuart Rd Valley View Rd 08/04/25 08/08/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 35 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 08/31/25 Voids underground Other Sheldon Gatewood Full Closure 36 Mockingbird Ln Mingo Rd University or(U.S.380) 06/16/25 08/15/25 Bore work to install new Private Development Zabdiel Mote Lane Closure sanitary sewer line. 37 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 38 Mulberry St Elm St Carroll Blvd 03/17/25 08/22/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 39 Mulberry St Welch St Bernard St 11/29/24 10/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 40 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson pavement replacement. 41 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 42 Oak St Carroll Blvd Fry St 04/21/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 43 Oak St Welch St Ave C 04/28/25 08/08/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 44 Oak St E(109) Austin St @ intersection 05/19/25 08/22/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 45 Ocean or Atlantic or Nautical Ln 04/14/25 08/14/25 Sanitary Sewer install Private Development Gavin Petner Full Closure 46 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 08/31/25 Paving driveway approaches/ Private Development Public Ryan Donaldson Lane Closure sidewalks. Works Inspections Parvin St Larkhall Ln Bonnie Brae St 07/21/25 09/05/25 Installation of Drainage Engineering Robin Davis Full Closure Infrastructure crossing Parvin 47 near Bonnie Brae. NO ACCESS TO BONNIE BRAE FROM PARVIN-Use Willowwood 48 Pershing or Atlas or Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 49 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 50 Precision or Airport Rd UNIT Library Annex 04/01/25 08/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 51 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure replacement Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/08/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 52 waterline to provide water to the new DISD elementary school 53 Robinwood Ln Emerson Ln Live Oak St 11/12/24 08/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 54 Robinwood Ln Live Oak St Kayewood or 01/27/25 08/31/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 55 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 56 Selene or Neptune or Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure 57 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 08/08/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 58 Sunnydale Ln Sun Valley or Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 59 Sunset St Carroll Blvd Bolivar St 07/07/25 08/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on August 1,2025 11:50:23 AM CDT Streett Intersection From To Closure Start Closure End Description Department Date Date Department Contact Closure Type 60 Sunset St University or W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 61 installed,staging area and line install.Road closed to through traffic 62 Unicorn Lake Blvd State School Rd Shoreline Dr 07/03/25 08/14/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure paving repair 63 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 64 Welch St Eagle or Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 65 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Exported on August 1,2025 11:50:23 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection V From Description Department Department Contact Airport Rd(FM 1515) 135 E Frontage Rd Airport/135W Frontage Rd 07/07/25 07/14/25 Construction of the new Engineering Robin Davis Full Closure 1 alignment of Bonnie Brae connecting to Airport Road/FM 1515 2 Ave A Eagle Dr Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 3 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure 4 Bonnie Brae St Airport Rd(FM 1515) Walt Parker Dr(Main Stadium 01/06/25 07/14/25 Utility installations and Engineering Robin Davis Full Closure Dr) pavement replacement. Bonnie Brae St Conquest or Windsor or 07/07/25 07/21/25 Removing dirt along existing Engineering Jesus Perez Lane Closure back of curb and removing existing large trees along the 5 back of curb in the same area. Contractor will also tie-in new 16-inch waterline to existing 16- inch waterline. 6 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 7 Eagle Dr Welch St @ intersection 07/17/25 07/17/25 Asphalt repair on intersection of Public Works Inspections Christopher Yanez Lane Closure Welch and Eagle or Streets Traffic Water 8 Frnye St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9lton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Mirada(1500) Manten Blvd Zilda Way 06/09/25 07/04/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 11 Prairie St Welch St Bernard St 03/13/25 07/25/25 Utility installations Engineering Megan Davidson Full Closure 12 Robson Rd 1-35W Orangewood Trail 07/18/25 07/21/25 Adding right turn lanes for Public Works Inspections Gary Hatfield Lane Closure Hunter's Ranch 13 Stuart Rd Hercules Ln Kings Row 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 14 Sun Valley or Stuart Rd Atlas or 06/09/25 07/25/25 Asphalt repairs for Landmark at Public Works Inspections Alexander Cervantes Full Closure Locust project 15 Westway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on August 1,2025 11:50:37 AM CDT