2025/08/15 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet DRAFT SCR Aug 18th - 24th Street/Intersection From Closure Start Description Department Department Contact Closure Type Bonnie Brae St S Willowwood St Parvin St 09/08/25 12111121 Installation of drainage infrastructure, Engineering Robin Davis Full Closure 1 embankment work in advance of street widening.(Access to Natl Wholesale& residents only) 2 Ranchman Blvd(3617) Sundown Blvd @ Intersection 09/01/25 09/30/25 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure Exported on August 15,2025 11:58:25 AM CDT 2 Street Closure Report: Current Closures smartsheet a re End Description J Department Department Contact ��Il Aileen St Panhandle St Cordell St 09/27/24 09/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Airport Rd(FM 1515) 135 E Service Rd 135 W Service Rd 07/30/25 08/18/25 Paving work by both City and Engineering Robin Davis Full Closure TxDot contractors for the 35E, Bonnie Brae and Airport Road projects.(USE WESTERN BLVD) Alice St Sunset St University or(US 380) 05/27/25 10/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 4 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 5 Amarillo St Haynes St Congress St 08/11/25 12/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Apollo or Redstone Rd Selene or 07/24/25 02/13/26 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 7 Ave G Prairie St Louise St 03/13/25 09/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Bonnie Brae St Conquest or North Lakes Park 07/07/25 09/08/25 Contractor will be demolishing Engineering Jesus Perez Full Closure the existing street intersection of Bonnie Brae and Riney Road. The Contractor will 8 construct the new concrete street intersection. Contractor has built a temporary concrete pavement detour to allow traffic to keep moving north and south. Bonnie Brae St S 135 E Walt Parker or 07/30/25 08/18/25 Paving work by both City and Robin Davis Full Closure 9 TxDot contractors for the 35E, Bonnie Brae and Airport Road projects. 10 Cactus Cir Yucca or (End of street)Cut de sac 04/28/25 09/26/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 11 Carlton St Aileen St Malone St 07/23/25 09/19/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 12 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure pavement replacement 13 Congress St W Malone St Bryan St 01/31/25 08/22/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 1 14 Cordell St Colt St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure 15 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 16 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Eagle or Ave C Ave A 03/17/25 08/29/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 17 elevation changes in the jobsite it is the only way to get into the site 18 Ector St Cordell St University Dr(US380) 06/30/25 08/30/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure Manholes,pipe,paving 19 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 20 Fry St Oak St Hickory St 04/28/25 08/29/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure Glenwood or Kayewood Dr Mistywood Ln 07/21/25 08/31/25 Drainage Cut across Glenwood Drainage Sheldon Gatewood Full Closure 21 to remove and install new Junction Box 22 Hercules Ln(East bound) Redstone Rd Stuart Rd 07/18/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 23 Hercules Ln(West bound) Redstone Rd Stuart Rd 07/21/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 24 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 25 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 26 Hobson Ln Forrestridge or Country Club Rd 07/29/25 08/30/25 Patching asphalt on existing Private Development Gavin Petner Full Closure road Exported on August 15,2025 11:59:22 AM CDT Streett Intersection From To Closure Start Closure End Department Department Contact Date Date Description I Closure Type 27 Hobson Ln Forrestridge Dr Country Club Rd 09/15/25 10/01/25 Signage and striping on Hobson Public Works Inspections Gavin Petner Full Closure Lane. 28 Huisache St Aspen Dr Yucca Dr 04/09/25 09/05/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 08/22/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 29 Christal:Adding a turn Lane on Masch Branch 30 Juno Ln Atlas Dr Stuart Dr 04/09/25 09/12/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 31 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 08/31/25 Voids underground Other Sheldon Gatewood Full Closure 32 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 09/05/25 Bore work to install new Private Development Zabdiel Mota Lane Closure sanitary sewer line. 33 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 34 Mulberry St Elm St Carroll Blvd 03/17/25 08/22/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 35 Mulberry St Welch St Bernard St 11/29/24 10/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 36 Normal St Oak St Scripture St 05/08/25 09/05/25 Utility installations and Engineering Megan Davidson pavement replacement. 37 Normal St Scripture St Oak St 08/18/25 12/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 38 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 39 Oak St Carroll Blvd Fry St 04/21/25 08/29/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 40 Oak St Welch St Ave C 04/28/25 08/29/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 41 Oak St E(109) Austin St @ intersection 05/19/25 08/22/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 42 Ocean or Atlantic or Nautical Ln 04/14/25 08/30/25 Sanitary Sewer install/paving Private Development Gavin Petner Full Closure repair 43 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 08/31/25 Paving driveway approaches/ Private Development Public Ryan Donaldson Lane Closure sidewalks. Works Inspections Parvin St Larkhall Ln Bonnie Brae St 07/21/25 09/05/25 Installation of Drainage Engineering Robin Davis Full Closure Infrastructure crossing Parvin 44 near Bonnie Brae. NO ACCESS TO BONNIE BRAE FROM PARVIN-Use Willowwood 45 Pershing Dr Atlas or Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 46 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 47 Precision or Airport Rd LINT Library Annex 04/01/25 08/31/25 Reconstruction Engineering Other Gio Pineiro Full Closure 48 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure replacement 49 Robinwood Ln Emerson Ln Live Oak St 11/12/24 08/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 50 Robinwood Ln Live Oak St Kayewood or 01/27/25 08/31/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 51 Scripture St Bonnie Brae St 1-35 Service Rd 08/18/25 08/22/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure 52 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 53 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Engineering Scott Fettig Full Closure 54 Sheraton Rd Imperial or Sun Valley or 08/11/25 12/12/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 55 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 56 Sunset St Carroll Blvd Bolivar St 07/07/25 0S/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 57 Sunset St University or W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Trinity Rd S McKinney St E Mary Ln 06/09/25 08/29/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 58 installed,staging area and line install.Road closed to through traffic 59 Unicorn Lake Blvd State School Rd Shoreline Dr 07/03/25 12/30/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure paving repair Exported on August 15,2025 11:59:22 AM CDT Fs-t.t,I-11t.lt. From To Closure Start Closure End Department Date Date Description Department Contact Closure Type 60 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 61 Welch St Eagle Dr Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 62 Wind river Lane Widgeon Meredith 08/08/25 08/23/25 Emergency pond pumping per Private Development Gavin Petner Lane Closure Watershed compliance order 63 Yellowstone PI Hercules Ln Juno Ln 06/30/25 09/01/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Exported on August 15,2025 11:59:22 AM CDT 3 Street Closure Report: Completed Closures smartsheet or— __ • M �- .. -• • Description Department Department • • •- 1 Ave A Eagle or Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 2 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure 3 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. Bonnie Brae St Conquest or Windsor Dr 07/07/25 07/21/25 Removing dirt along existing Engineering Jesus Perez Lane Closure back of curb and removing existing large trees along the 4 back of curb in the same area. Contractor will also tie-in new 16-inch waterline to existing is- inch waterline. 5 Brookside Dr(5700) Trailridge Dr @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 6 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 7 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 8 Eagle Dr Welch St @ intersection 07/17/25 07/17/25 Asphalt repair on intersection of Public Works Inspections Christopher Yanez Lane Closure Welch and Eagle Dr Streets Traffic Water 9 Emery St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Fannin St S Ave B McCormick st 08/01/25 08/15/25 Utility work for PCM24-0012 Public Works Inspections Alexander Cervantes Lane Closure 11 Fulton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 12 Kings Row Stuart Rd Valley View Rd 08/12/25 08/13/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 13 Prairie St Welch St Bernard St 03/13/25 07/25/25 Utility installations Engineering Megan Davidson Full Closure Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/08/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 14 waterline to provide water to the new DISD elementary school 15 Robson Rd I-35W Orangewood Trail 07/18/25 07/21/25 Adding right turn lanes for Public Works Inspections Gary Hatfield Lane Closure Hunter's Ranch 16 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 08/08/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 17 Stuart Rd Hercules Ln Kings Row 06/09/25 07/18/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 18 Sun Valley Dr Stuart Rd Atlas Dr 06/09/25 07/25/25 Asphalt repairs for Landmark at Public Works Inspections Alexander Cervantes Full Closure Locust project 19 Westway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on August 15,2025 12:01:33 PM CDT