2025/08/29 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Sept 1 st - 7th
Street/Intersection From D'....e Start �Description Department Department Contact Closure Type
ate
Bonnie Brae St S Willowwood St Parvin St 09/08/25 12/19/25 Installation of drainage infrastructure, Engineering Robin Davis Full Closure
1 embankment work in advance of street
widening.(Access to Natl Wholesale&
residents only)
Exported on August 29,2025 11:41:27 AM CDT
2 Street Closure Report: Current Closures smartsheet
�L� LMISUSLizaum . . Description Department Department Contact ��Il A
17AjIeen St Panhandle St Cordell St 09/27/24 09/05/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
2St Sunset St University or(US 380) 05/27/25 10/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
3 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
4 Amarillo St Haynes St Congress St 08/11/25 12/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Apollo or Redstone Rd Selene or 07/24/25 02/13/26 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Ave A Maple St Underwood St 09/02/25 09/30/25 Mabak installing utilities Public Works Inspections Stephany Trammell Lane Closure
7 Ave G Prairie St Louise St 03/13/25 09/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
8 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/26/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
9 Carlton St Aileen St Malone St 07/23/25 09/19/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure
pavement replacement
11 Congress St W Malone St Bryan St 01/31/25 09/02/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
12 Cordell St Colt St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure
13 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
14 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
Eagle or Ave C Ave A 03/17/25 10/31/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure
15 elevation changes in the jobsite
it is the only way to get into the
site
16 Ector St Cordell St University or(US380) 06/30/25 09/19/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure
Manholes,pipe,paving
17 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
18 Fry St Oak St Hickory St 04/28/25 09/19/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
Glenwood or Kayewood or Mistywood Ln 07/21/25 08/31/25 Drainage Cut across Glenwood Drainage Sheldon Gatewood Full Closure
19 to remove and install new
Junction Box
20 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure
Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure
Road will be reconstructed(new
21 drainage,road,etc.)and new
northbound right turn lane will
be added to Country Club Road
22 Hobson Ln Forrestridge or Country Club Rd 09/15/25 09/30/25 Striping new pavement on Private Development Gavin Petner Full Closure
Hobson
23 Hobson Ln Forrestridge Dr Country Club Rd 09/15/25 10/01/25 Signage and striping on Hobson Public Works Inspections Gavin Petner Full Closure
Lane.
24 Huisache St Aspen Dr Yucca or 04/09/25 09/05/25 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 09/05/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure
25 Christal:Adding a turn Lane on
Masch Branch
26 Juno Ln Atlas or Stuart or 04/09/25 09/12/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
27 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 09/26/25 Construction Activity Other Sheldon Gatewood Full Closure
28 Mockingbird Ln Mingo Rd University or(U.S.380) 06/16/25 09/05/25 Bore work to install new Private Development Zabdiel Mote Lane Closure
sanitary sewer line.
29 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement
30 Mulberry St Welch St Bernard St 11/29/24 10/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
31 Normal St Scripture St Oak St 08/18/25 12/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on August 29,2025 11:41:45 AM CDT
Streett Intersection To Closure Start Closure End Description Department Department Contact Closure Type
Date Date
32 Northridge St Hinkle Or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure
replacement
33 Oak St Carroll Blvd Fry St 04/21/25 09/19/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
34 Oak St Welch St Ave C 04/28/25 09/19/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
35 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 09/15/25 Sanitary Sewer install/paving Private Development Gavin Petner Full Closure
repair
36 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 09/30/25 Paving driveway approaches/ Private Development Public Ryan Donaldson Lane Closure
sidewalks. Works Inspections
Parvin St Larkhall Ln Bonnie Brae St 07/21/25 09/05/25 Installation of Drainage Engineering Robin Davis Full Closure
Infrastructure crossing Parvin
37 near Bonnie Brae. NO
ACCESS TO BONNIE BRAE
FROM PARVIN-Use
Willowwood
38 Pershing or Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
39 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
40 Ranchman Blvd(3617) Sundown Blvd @ Intersection 09/01/25 09/30/25 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
41 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
42 Robinwood Ln Emerson Ln Live Oak St 11/12/24 09/26/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
43 Robinwood Ln Live Oak St Kayewood Dr 01/27/25 09/26/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure
and C/G Removal,Stabilization)
44 Scripture St Bonnie Brae St 1-35 Service Rd 08/18/25 09/26/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure
45 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
46 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
47 Sheraton Rd Imperial Dr Sun Valley Dr 08/11/25 12/12/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
48 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
49 Sunset St University or W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
50 Sunset St Carroll Blvd Bolivar St 07/07/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Trinity Rd S McKinney St E Mary Ln 06/09/25 09/19/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure
51 installed,staging area and line
install.Road closed to through
traffic
52 Unicorn Lake Blvd State School Rd Shoreline Dr 07/03/25 12/30/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure
paving repair
53 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
Walt Parker or Bonnie Brae St Tennis/Soccer Complex parking lot 09/02/25 09/12/25 Paving Improvements on Walt Engineering Robin Davis Full Closure
entrance Parker at the Bonnie Brae
Intersection(NO ACCESS to
54 Walt Parker from Bonnie Brae-
ACCESS WALT PARKER via
NORTH TEXAS BLVD,then
route behind Stadium parking
lot back to Walt Parker.))
55 Welch St Eagle Or Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
56 Yellowstone PI Hercules Ln Juno Ln 06/30/25 10/10/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Exported on August 29,2025 11:41:45 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/ • . •- . •-1 • Description Department Department • • •-
Airport Rd(FM 1515) 135 E Service Rd 135 W Service Rd 07/30/25 08/18/25 Paving work by both City and Engineering Robin Davis Full Closure
TxDot contractors for the 35E,
1 Bonnie Brae and Airport Road
projects.(USE WESTERN
BLVD)
2 Ave A Eagle Dr Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
3 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure
4 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
Bonnie Brae St Conquest or North Lakes Park 07/07/25 08/21/25 Contractor will be demolishing Engineering Jesus Perez Full Closure
the existing street intersection
of Bonnie Brae and Riney
Road. The Contractor will
5 construct the new concrete
street intersection. Contractor
has built a temporary concrete
pavement detour to allow traffic
to keep moving north and south.
Bonnie Brae St S 135 E Walt Parker or 07/30/25 08/18/25 Paving work by both City and Robin Davis Full Closure
TxDot contractors for the 35E,
Bonnie Brae and Airport Road
projects.
7 Brookside Dr(5700) Trailridge Dr @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
8 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
9 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure
10 Emery St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
11 Fannin St S Ave B McCormick st 08/01/25 08/15/25 Utility work for PCM24-0012 Public Works Inspections Alexander Cervantes Lane Closure
12 Fulton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Hercules Ln(East bound) Redstone Rd Stuart Rd 07/18/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
14 Hercules Ln(West bound) Redstone Rd Stuart Rd 07/21/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure
at Locust project
15 Kings Row Stuart Rd Valley View Rd 08/12/25 08/13/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
16 Longmeadow Ct West(cul de sac) Mack Dr. 08/18/25 08/22/25 Basefailure repairs Streets Roy San Miguel Full Closure
17 Mulberry St Elm St Carroll Blvd 03/17/25 08/22/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure
18 Normal St Oak St Scripture St 05/08/25 08/29/25 Utility installations and Engineering Megan Davidson
pavement replacement.
19 Oak St E(109) Austin St @ intersection 05/19/25 08/22/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure
Intersection
20 Precision Dr Airport Rd UNT Library Annex 04/01/25 08/28/25 Reconstruction Engineering Other Gio Pineiro Full Closure
Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/08/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure
21 waterline to provide water to the
new DISD elementary school
22 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 08/08/25 Sidewalk Repair Streets Roy San Miguel Lane Closure
23 Westway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
24 Wind River Ln Widgeon Meredith 08/08/25 08/23/25 Emergency pond pumping per Private Development Gavin Petner Lane Closure
Watershed compliance order
Exported on August 29,2025 11:42:01 AM CDT