Loading...
2025/08/29 - Street Closure Report-rev2 1 Street Closure Report: Upcoming Closures smartsheet SCR Sept 1 st - 7th Street/Intersection From D'....e Start �Description Department Department Contact Closure Type ate Bonnie Brae St S Willowwood St Parvin St 09/08/25 12/19/25 Installation of drainage infrastructure, Engineering Robin Davis Full Closure 1 embankment work in advance of street widening.(Access to Natl Wholesale& residents only) Exported on August 29,2025 2:45:04 PM CDT 2 Street Closure Report: Current Closures smartsheet �L� LMISUSLizaum . . Description Department Department Contact ��Il A 17AjIeen St Panhandle St Cordell St 09/27/24 09/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2St Sunset St University or(US 380) 05/27/25 10/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 3 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 4 Amarillo St Haynes St Congress St 08/11/25 12/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Apollo or Redstone Rd Selene or 07/24/25 02/13/26 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 6 Ave A Maple St Underwood St 09/02/25 09/30/25 Mabak installing utilities Public Works Inspections Stephany Trammell Lane Closure 7 Ave G Prairie St Louise St 03/13/25 09/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 8 Cactus Cir Yucca or (End of street)Cul de sac 04/28/25 09/26/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 9 Carlton St Aileen St Malone St 07/23/25 09/19/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and Engineering Megan Davidson Rolling Closure pavement replacement 11 Congress St W Malone St Bryan St 01/31/25 09/02/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 12 Cordell St Colt St Fulton St 06/30/25 09/26/25 Full road reconstruction Engineering Megan Davidson Full Closure 13 Crescent St W Aileen St Malone St 05/21/25 09/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 14 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Eagle or Ave C Ave A 03/17/25 10/31/25 Using it or an entrance due to Public Works Inspections Collin Cole Lane Closure 15 elevation changes in the jobsite it is the only way to get into the site 16 Ector St Cordell St University or(US380) 06/30/25 09/19/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure Manholes,pipe,paving 17 Egan St Carroll Blvd Bolivar St 05/07/25 09/10/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 18 Fry St Oak St Hickory St 04/28/25 09/19/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure Glenwood or Kayewood or Mistywood Ln 07/21/25 08/31/25 Drainage Cut across Glenwood Drainage Sheldon Gatewood Full Closure 19 to remove and install new Junction Box 20 Hickory Creek Rd Riverpass or Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 21 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 22 Hobson Ln Forrestridge or Country Club Rd 09/15/25 09/30/25 Striping new pavement on Private Development Gavin Petner Full Closure Hobson 23 Hobson Ln Forrestridge Dr Country Club Rd 09/15/25 10/01/25 Signage and striping on Hobson Public Works Inspections Gavin Petner Full Closure Lane. 24 Huisache St Aspen Dr Yucca or 04/09/25 09/26/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/07/25 09/05/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 25 Christal:Adding a turn Lane on Masch Branch 26 Juno Ln Atlas or Stuart or 04/09/25 09/12/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 27 Kings Row Sunnydale Ln @ Intersection 09/02/25 09/05/25 Utility Work and pavement Engineering Dante Hale repairs 28 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 09/26/25 Construction Activity Other Sheldon Gatewood Full Closure 29 Mockingbird Ln Mingo Rd University or(U.S.380) 06/16/25 09/05/25 Bore work to install new Private Development Zabdiel Mote Lane Closure sanitary sewer line. 30 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 31 Mulberry St Welch St Bernard St 11/29/24 10/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on August 29,2025 2:45:19 PM CDT Streett Intersection From To Closure Start Closure End Description Department Department Contact Closure Type Date Date 1 32 Normal St Scripture St Oak St 08/18/25 12/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 33 Northridge St Hinkle or Bolivar St 04/16/25 04/20/26 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement 34 Oak St Carroll Blvd Fry St 04/21/25 09/19/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 35 Oak St Welch St Ave C 04/28/25 09/19/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 36 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 09/15/25 Sanitary Sewer install/paving Private Development Gavin Petner Full Closure repair 37 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 09/30/25 Paving driveway approaches/ Private Development Public Ryan Donaldson Lane Closure sidewalks. Works Inspections Parvin St Larkhall Ln Bonnie Brae St 07/21/25 09/05/25 Installation of Drainage Engineering Robin Davis Full Closure Infrastructure crossing Parvin 38 near Bonnie Brae. NO ACCESS TO BONNIE BRAE FROM PARVIN-Use Willowwood 39 Pershing Dr Atlas or Stuart Rd 05/08/25 12/15/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 40 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 41 Ranchman Blvd(3617) Sundown Blvd @ Intersection 09/01/25 09/30/25 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 42 Redstone Rd Hercules Ln Neptune or 05/05/25 06/12/26 Utilities and Pavement Engineering Dante Hale Full Closure replacement 43 Robinwood Ln Emerson Ln Live Oak St 11/12/24 09/26/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 44 Robinwood Ln Live Oak St Kayewood Dr 01/27/25 09/26/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 45 Scripture St Bonnie Brae St 1-35 Service Rd 08/18/25 09/26/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure 46 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 47 Selene Dr Neptune or Stuart Rd 06/04/25 11/28/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 48 Sheraton Rd Imperial Dr Sun Valley Dr 08/11/25 12/12/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 49 Sheraton Rd Imperial or @ Intersection 09/02/25 09/05/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 50 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 51 Sunset St University Dr W Carroll Blvd 01/20/25 10/16/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 52 Sunset St Carroll Blvd Bolivar St 07/07/25 10/17/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Trinity Rd S McKinney St E Mary Ln 06/09/25 09/19/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 53 installed,staging area and line install.Road closed to through traffic 54 Unicorn Lake Blvd State School Rd Shoreline Or 07/03/25 12/30/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure paving repair 55 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. Walt Parker Dr Bonnie Brae St Tennis/Soccer Complex parking lot 09/02/25 09/12/25 Paving Improvements on Walt Engineering Robin Davis Full Closure entrance Parker at the Bonnie Brae Intersection(NO ACCESS to 56 Walt Parker from Bonnie Brae- ACCESS WALT PARKER via NORTH TEXAS BLVD,then route behind Stadium parking lot back to Walt Parker.)) 57 Welch St Eagle or Hickory St 05/31/24 10/15/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 58 Wind River Ln Widgeon Ln Meredith Ln 08/08/25 09/30/25 Emergency pond pumping per Private Development Gavin Petner Lane Closure Watershed compliance order 59 Yellowstone PI Hercules Ln Juno Ln 06/30/25 10/10/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Exported on August 29,2025 2:45:19 PM CDT 3 Street Closure Report: Completed Closures smartsheet Street/ • . •- . •-1 • Description Department Department • • •- Airport Rd(FM 1515) 135 E Service Rd 135 W Service Rd 07/30/25 08/18/25 Paving work by both City and Engineering Robin Davis Full Closure TxDot contractors for the 35E, 1 Bonnie Brae and Airport Road projects.(USE WESTERN BLVD) 2 Ave A Eagle Dr Highland St 02/03/25 07/31/25 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 3 Ave B Fannin St Margie St 11/22/24 07/31/25 Pavement replacement Engineering Scott Fettig Full Closure 4 Ave D Chestnut St Mulberry St 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. Bonnie Brae St Conquest or North Lakes Park 07/07/25 08/21/25 Contractor will be demolishing Engineering Jesus Perez Full Closure the existing street intersection of Bonnie Brae and Riney Road. The Contractor will 5 construct the new concrete street intersection. Contractor has built a temporary concrete pavement detour to allow traffic to keep moving north and south. Bonnie Brae St S 135 E Walt Parker or 07/30/25 08/18/25 Paving work by both City and Robin Davis Full Closure TxDot contractors for the 35E, Bonnie Brae and Airport Road projects. 7 Brookside Dr(5700) Trailridge Dr @ intersection 07/21/25 08/15/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 8 Chestnut St Ave C Ave D 05/12/25 08/15/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. 9 Clover Ln Robinwood Ln Glenwood Ln 11/12/24 07/31/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 10 Emery St Alice St Dead End(West of Fulton) 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Fannin St S Ave B McCormick st 08/01/25 08/15/25 Utility work for PCM24-0012 Public Works Inspections Alexander Cervantes Lane Closure 12 Fulton St Cordell St Emery St 02/03/25 08/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Hercules Ln(East bound) Redstone Rd Stuart Rd 07/18/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 14 Hercules Ln(West bound) Redstone Rd Stuart Rd 07/21/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 15 Kings Row Stuart Rd Valley View Rd 08/12/25 08/13/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 16 Longmeadow Ct West(cul de sac) Mack Dr. 08/18/25 08/22/25 Basefailure repairs Streets Roy San Miguel Full Closure 17 Mulberry St Elm St Carroll Blvd 03/17/25 08/22/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 18 Normal St Oak St Scripture St 05/08/25 08/29/25 Utility installations and Engineering Megan Davidson pavement replacement. 19 Oak St E(109) Austin St @ intersection 05/19/25 08/22/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 20 Precision Dr Airport Rd UNT Library Annex 04/01/25 08/28/25 Reconstruction Engineering Other Gio Pineiro Full Closure Riney Rd Bonnie Brae St Hardaway Rd 03/08/25 08/08/25 Contractor to install 12-inch Engineering Jesus Perez Full Closure 21 waterline to provide water to the new DISD elementary school 22 Seven Oaks Ln(7912) Clear River Ln @ Intersection 06/23/25 08/08/25 Sidewalk Repair Streets Roy San Miguel Lane Closure 23 Westway St Anna St Bolivar St 01/24/25 07/31/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on August 29,2025 2:45:32 PM CDT