Loading...
2025/09/19 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sept 22nd - 28th Exported on September 19,2025 11:36:18 AM CDT 2 Street Closure Report: Current Closures smartsheet now- De..,Ipt,., Department Department Contact Closure Type 1 Alice St Sunset St University Dr(US 380) 05/27/25 10/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure 2 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure 3 Amarillo St Haynes St Congress St 08/11/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 4 Apollo Dr Redstone Rd Selene Dr 07/24/25 02/13/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 5 Audra Ln Lattimore St Rustling Oaks Dr 09/24/25 10/24/25 COD Water department to perform taps for developer. Private Development Zabdiel Mote Lane Closure 6 Audra Ln Rustling Oaks Dr Oak Tree Dr 09/24/25 10/24/25 COD Water Department to perform water taps for developer. Private Development Zabdiel Mot.-Balderas Lane Closure 7 Ave A Maple St Underwood St 09/02/25 09/30/25 Mabak installing utilities Public Works Inspections Stephany Trammell Lane Closure 8 Bonnie Brae St Caril AL Lago University Dr(US 380) 09/19/25 10/10/25 Contractor will be installing storm drain lines,laterals,and curb inlets Engineering Jesus Perez Lane Closure along Bonnie Brae. 9 Bonnie Brae St S Willowwood St P—in St 09/08/25 12/19/25 Installation of drainage infrastructure,embankment work in advance of Engineering Robin Davis Full Closure street widening.(Access to Natl Wholesale&residents only) 10 Cactus Cir Yucca Dr (End of street)Cul de sac 04/28/25 09/26/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure 11 Carlton St Aileen St Malone St 07/23/25 10/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 12 Congress St Ponder St Carroll Blvd 03/31/25 09/30/25 Utility installations and pavement replacement Engineering Megan Davidson Rolling Closure 13 Cordell St Fulton St Colt St 09/15/25 01/23/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 14 Crescent St W Aileen St Malone St 05/21/25 10/03/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure 15 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure 16 Eagle Dr Ave C Ave A 03/17/25 10/31/25 Using it or an entrance due to elevation changes in the jobsite it is the Public Works Inspections Collin Cole Lane Closure only way to get into the site 17 Ector St Cordell St University Dr(US380) 06/30/25 10/03/25 Sewer Line Being installed,Manholes,pipe,paving Public Works Inspections Collin Cole Full Closure 18 Egan St Carroll Blvd Bolivar St 05/07/25 10/17/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure 19 Fry St Oak St Hickory St 04/28/25 10/03/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 20 Hickory Creek Rd Riverpass Dr Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/30/25 Hilltop Road at Country Club Road will be reconstructed(new drainage, Engineering Tracy Beck Full Closure 21 road,etc.)and new northbound right turn lane will be added to Country Club Road 22 Hobson Ln Forrestridge Dr Country Club Rd 09/15/25 09/30/25 Striping new pavement on Hobson Private Development Gavin Petner Full Closure 23 Hobson Ln Forrestridge Dr Country Club Rd 09/15/25 10/01/25 Signage and striping on Hobson Lane. Public Works Inspections Gavin Petner Full Closure 24 Huisache St Aspen Dr Yucca Dr 04/09/25 09/26/25 Utilities and Pavement replacement Engineering Dante Hale Rolling Closure 25 Jim Christal Rd Masch Branch Rd @ Intersection 03/14/25 09/26/25 Adding 2 Lanes E1W on Jim Christal:Adding a turn Lane on Masch Public Works Inspections Kirk Winter Lane Closure Branch 26 Juno Ln Atlas Dr Stuart Dr 04/09/25 09/30/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure 27 Lattimore St Mozingo St Audra Ln 09/24/25 10/24/25 Water taps to be performed by COD Water Department. Private Development Zabdiel Mots Rolling Closure 28 Mills Rd Mayhill Rd Cunningham Rd 09/15/25 10/03/25 Water and Sewer installations for Ryan HS project Private Development Public Alexander Cervantes Full Closure Works Inspections 29 Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 09/26/25 Construction Activity Other Sheldon Gatewood Full Closure 30 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 09/26/25 Bore work to install new sanitary sewer line. Private Development Zabdiel Mota Lane Closure 31 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure 32 Mulberry St Welch St Bernard St 11/29/24 10/01/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure K Normal St Scripture St Oak St 08/18/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 34 Northridge St Hinkle Dr Bolivar St 04/16/25 04/20/26 Utilities and Pavement replacement Engineering Dante Hale Rolling Closure 35 Oak St Carroll Blvd Fry St 04/21/25 10/03/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 36 Oak St Welch St Ave C 04/28/25 10/03/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 37 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 09/30/25 Paving driveway approaches/sidewalks. Private Development Public Ryan Donaldson Lane Closure Works Inspections 3E Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure 39 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure 40 Ranchman Blvd(3617) Sundown Blvd @ Intersection 09/01/25 09/30/25 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 41 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure 42 Robinwood Ln Emerson Ln Live Oak St 11/12/24 09/26/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 43 Robinwood Ln Live Oak St Kayewood Dr 01/27/25 09/26/25 Road reconstruction(Milling and C/G Removal,Stabilization) Engineering Sheldon Gatewood Full Closure 44 Scripture St Bonnie Brae St 1-35 Service Rd 08/18/25 09/26/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure 45 Scripture St Jagoe St Ponder St 03/04/25 10/17/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 46 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 47 Sheraton Rd Imperial Dr @ Intersection 09/12/25 09/26/25 Utilities and Pavement replacement Dante Hale Full Closure 48 Sheraton Rd Imperial Dr Sun Valley Dr 08/11/25 12/12/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure 49 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 50 Sunset St University Dr W Camoll Blvd 01/20/25 10/16/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 51 Sunset St Carroll Blvd Bolivar St 07/07/25 10/17/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 52 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/01/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure 53 Welch S[ Eagle Dr Hickory St 05/31/24 10/15/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure Exported on September 19,2025 11:36:31 AM CDT Street/Intersection Closure End Description Department Contact Closure Type Date 54 Wind River Ln Widgeon Ln Meredith Ln 08/08/25 09/30/25 Emergency pond pumping per Watershed compliance order Private Development Gavin Petner Lane Closure 55 Yellowstone PI Hercules Ln Juno Ln 06/30/25 10/10/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure Exported on September 19,2025 11:36:31 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/ From • III • - . •-1 • DescriptionDepartmentDepartment • - •- 1 Aileen St Panhandle St Cordell St 09/27/24 09/05/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 2 Ave G Prairie St Louise St 03/13/25 09/01/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement Bonnie Brae St Conquest Dr North Lakes Park 07/07/25 08/21/25 Contractor will be demolishing Engineering Jesus Perez Full Closure the existing street intersection of Bonnie Brae and Riney Road. The Contractor will 3 construct the new concrete street intersection. Contractor has built a temporary concrete pavement detour to allow traffic to keep moving north and south. 4 Congress St W Malone St Bryan St 01/31/25 09/02/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement 5 Cordell St Coit St Fulton St 06/30/25 09/15/25 Full road reconstruction Engineering Megan Davidson Full Closure Glenwood Dr Kayewood Dr Mistywood Ln 07/21/25 08/31/25 Drainage Cut across Glenwood Drainage Sheldon Gatewood Full Closure 6 to remove and install new Junction Box 7 Hercules Ln(East bound) Redstone Rd Stuart Rd 07/18/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 8 Hercules Ln(West bound) Redstone Rd Stuart Rd 07/21/25 08/25/25 Offsite utility work for Landmark Public Works Inspections Alexander Cervantes Lane Closure at Locust project 9 Kings Row Sunnydale Ln @ Intersection 09/02/25 09/05/25 Utility Work and pavement Engineering Dante Hale Full Closure repairs 10 Longmeadow Ct West(cul de sac) Mack Dr. 08/18/25 08/22/25 Basefailure repairs Streets Roy San Miguel Full Closure 11 Mulberry St Elm St Carroll Blvd 03/17/25 08/22/25 Water/Wastewater connections Public Works Inspections Stephany Trammell Full Closure 12 Normal St Oak St Scripture St 05/08/25 08/29/25 Utility installations and Engineering Megan Davidson pavement replacement. 13 Oak St E(109) Austin St @ intersection 05/19/25 08/22/25 ADA/Sidewalk Work at Streets Roy San Miguel Lane Closure Intersection 14 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 09/18/25 Sanitary Sewer install/paving Private Development Gavin Petner Full Closure repair Parvin St Larkhall Ln Bonnie Brae St 07/21/25 09/05/25 Installation of Drainage Engineering Robin Davis Full Closure Infrastructure crossing Parvin 15 near Bonnie Brae. NO ACCESS TO BONNIE BRAE FROM PARVIN-Use Willowwood 16 Precision Dr Airport Rd UNIT Library Annex 04/01/25 08/28/25 Reconstruction Engineering Other Gio Pineiro Full Closure 17 Sheraton Rd Imperial Dr @ Intersection 09/02/25 09/05/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Trinity Rd S McKinney St E Mary Ln 06/09/25 09/19/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 18 installed,staging area and line install.Road closed to through traffic 19 Unicorn Lake Blvd State School Rd Shoreline Dr 07/03/25 09/18/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure paving repair Walt Parker Dr Bonnie Brae St Tennis/Soccer Complex parking 09/02/25 09/12/25 Paving Improvements on Walt Engineering Robin Davis Full Closure lot entrance Parker at the Bonnie Brae Intersection(NO ACCESS to 20 Walt Parker from Bonnie Brae- ACCESS WALT PARKER via NORTH TEXAS BLVD,then route behind Stadium parking lot back to Walt Parker.)) Exported on September 19,2025 11:36:50 AM CDT