Loading...
Oversize City Participation Wastewater - Sagebrook Phase I CORWIN ENGINEERING,INC. 200 W.Belmont,Suite E Allen,Texas 75013 972-396-1200 Fax: 972-396-4987 CITY OVERSIZE WASTEWATER PARTICIPATION Project: Sagebrook Phase I Date: 12/4/2020 Location: Denton Client: Sagebrook Denton,LP. WASTEWATER IMPROVEMENTS PROVIDED ITEM DESCRIPTION QUANTITY UNIT COST/UNIT TOTAL COST 15"Sewer 3,521 L.F. $50.00 $176,050.00 15"Sewer Bore 100 L.F. $550.00 $55,000.00 5'Manhole 8 L.F. $11,000.00 $88,000.00 TOTAL COSTS $319,050.00 WASTEWATER IMPROVEMENTS REQUIRED 10"Sewer 3,521 1 L.F. 1 $35.00 1 $123,235.00 10"Sewer Bore 100 1 L.F. $450.00 $45,000.00 4'Manhole 8 1 EA. 1 $4,500.00 $36,000.00 TOTAL COSTS $204,235.00 CITY PARTICIPATION-WASTEWATER $114,815.00