Loading...
2025/10/17 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Oct. 20th - 26th Closure Start Streett Intersection To Date IMI Description Department Department Contact Closure Type 1 Audra Ln Oak Tree St At Intersection 11/03/25 11/21/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure 2 Audra Ln Mack PI Al Intersection 11/10/25 11/28/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure 3 Audra Ln Lee Dr At Intersection 11/24/25 12/12/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure 4 Audra Ln Paisley St Al Intersection 12/15/25 01/09/26 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure Exported on October 17,2025 11:57:05 AM CDT 2 Street Closure Report: Current Closures smartsheet now- De..,Ipt,., Department Department Contact Closure Type 1 Alice St Sunset St University Dr(US 380) 05/27/25 10/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure 2 Alice St Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure 3 Amarillo St Haynes St Congress St 08/11/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 4 Apollo Dr Redstone Rd Selene Dr 07/24/25 02/13/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 5 Apollo Dr Redstone Rd Selene Dr 09/29/25 03/28/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure 6 Audra Ln Lattimore St Rustling Oaks Dr 09/24/25 10/24/25 COD Water department to perform taps for developer. Private Development Zabdiel Mote Lane Closure 7 Audra Ln Rustling Oaks Dr Oak Tree Dr 09/24/25 10/24/25 COD Water Department to perform water taps for developer. Private Development Zabdiel Mota-Balderes Lane Closure 8 Audra Ln(EB) Audra Ln Oak Valley 10/01/25 10/31/25 COD Water department to perform water taps. Private Development Zabdiel Mot. Lane Closure 9 Audra Ln(EB) Audra Ln Oak Valley 10/01/25 10/31/25 Utility Contractor to install drainage pipe across Audra Lane. Private Development Zabdiel Mot.-Balderes Lane Closure 10 Audra Ln(WB) Audra Ln Oak Valley 10/01/25 10/31/25 COD Water Department to perform water taps. Private Development Zabdiel Mote Lane Closure 11 Audra Ln(WB) Audra Ln Oak Valley 10/01/25 10/31/25 Utility Contractor to install drainage pipe across Audra Lane. Private Development Zabdiel Mot.-Balderes Lane Closure 12 Ave A Maple St Underwood St 09/02/25 11/07/25 Mabak installing utilities Public Works Inspections Stephany Trammell Lane Closure 13 Bonnie Brae St Caril AL Lago University Dr(US 380) 09/19/25 11/10/25 Contractor will be installing storm drain lines,laterals,and curb inlets Engineering Jesus Perez Lane Closure along Bonnie Brae. 14 Bonnie Brae St S Willowwood St Parvin St 09/08/25 12/19/25 Installation of drainage infrastructure,embankment work in advance of Engineering Robin Davis Full Closure street widening.(Access to Natl Wholesale&residents only) 15 Carlton St Aileen St Malone St 07/23/25 10/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 16 Cordell St Fulton St Colt St 09/15/25 01/23/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 17 Crater Lake Ln(2809) Como Lake Rd Herting Ct 10/13/25 11/14/25 Concrete Panel repair Streets Roy San Miguel Lane Closure 18 Denton St Hickory St Congress St 06/02/25 11/05/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure 19 Dunlavy Rd(3800) Hillcroft Ave Bissonet Dr 10/20/25 11/21/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure 20 Eagle Dr Ave C Ave A 03/17/25 10/31/25 Using it or an entrance due to elevation changes in the jobsite it is the Public Works Inspections Collin Cole Lane Closure only way to get into the site 21 Egan St Carroll Blvd Bolivar St 05/07/25 11/14/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure 22 Emery St Dead End Alice St 09/29/25 02/13/26 Full Road Reconstruction Engineering Megan Davidson Full Closure 2: Fry St Oak St Hickory St 04/28/25 10/31/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 2- Fulton St N Cordell St Emery St 09/29/25 02/13/26 Full Road Reconstruction Engineering Megan Davidson Full Closure 25 Hickory Creek Rd Riverpass Dr Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure 26 Hobson Ln Forrestridge Dr Country Club Rd 10/30/25 11/30/25 Signage and striping on Hobson Lane. Public Works Inspections Gavin Petner Full Closure 27 Hobson Ln Forrestridge Dr Country Club Rd 10/30/25 12/15/25 replace failing concrete pavement and striping Private Development Gavin Petner Full Closure 28 Huntington Dr Sun Valley Dr Hercules Ln 10/20/25 03/31/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure 29 Juno Ln Atlas Dr Stuart Dr 04/09/25 10/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure 30 Lattimore St I Mozingo St Audra Ln 09/24/25 10/24/25 Water taps to be performed by COD Water Department. Private Development Zabdiel Mote Rolling Closure 31 Mayhill Rd S 600ft North of Edwards Rd 400f1 South of Edwards Rd 10/20/25 07/30/26 Waterline tap being installed on Mayhill Easment Public Works Inspections Collin Cole Rolling Closure 32 Mills Rd Mayhill Rd I Cunningham Rd 09/15/25 11/07/25 Water and Sewer installations for Ryan HS project Private Development Public Alexander Cervantes Full Closure Works Inspections 33 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 10/31/25 Bore work to install new sanitary sewer line. Private Development Zabdiel Mote Lane Closure 34 Mounts Ave Congress St W Haynes St 08/01/25 11/01/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure 35 Mulberry St Ave C Ave D 10/01/25 10/24/25 Water Dept/Tri Dal will be performing water taps/asphalt repairs/sewer Private Development Public Ryan Donaldson Lane Closure manhole installation Works Inspections Normal St Scripture St Oak St 08/18/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure Northridge St Hinkle Dr Bolivar St 04/16/25 04/20/26 Utilities and Pavement replacement Engineering Dante Hale Rolling Closure 3t Nottingham Dr Churchill Dr Devonshire Ct 10/20/25 11/07/25 Bridge Deck and Curb Repair Streets Roy San Miguel Lane Closure 39 Oak St Carroll Blvd Fry St 04/21/25 10/31/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 40 Oak St Welch St Ave C 04/28/25 10/31/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure 41 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 10/31/25 Paving driveway approaches/sidewalks. Private Development Public Ryan Donaldson Lane Closure Works Inspections 42 Parkway St Denton St Carroll Blvd 10/20/25 04/21/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 43 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure 44 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure 45 Quail Creek Dr Berry Down Ln Stockbridge Rd 10/20/25 04/20/26 Waterline Tap being installed/Road patch Public Works Inspections Collin Cole Lane Closure 46 Ranchman Blvd(3617) Sundown Blvd Q Intersection 09/01/25 10/24/25 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure 47 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure 48 Scripture St Jagoe St Ponder St 03/04/25 03/31/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 49 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/28/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 50 Sheraton Rd Imperial Dr Sun Valley Dr 08/11/25 12/12/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure 51 Stockbridge Dr Hudsonwood Dr Quail Creek Dr 10/20/25 04/20/26 Utilities being upsized Public Works Inspections Collin Cole Lane Closure 52 Sun Valley Dr Buckingham Dr Sheraton Rd 10/20/25 11/11/25 Utility work and pavement Repair Engineering Dante Hale Full Closure 53 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 54 Sunset St University Dr W Carroll Blvd 01/20/25 10/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure Exported on October 17,2025 11:57:24 AM CDT Closure Start Closure End Streetl Intersection From To Date Date Description Department Department Contact 55 Sunset St Carroll Blvd Bolivar St 07/07/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure 56 Welch St Eagle Dr Mulberry St 05/31/24 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure 57 Welch St Mulberry St Hickory St 10/01/25 01/09/26 Utility relocation and pavement replacement Engineering Megan Davidson Full Closure 58 Willowood St Bonnie Brae St 500tt East 09/29/25 11/23/25 Full Road Reconstruction Public Works Inspections Robin Davis Full Closure 59 Wind River Ln Widgeon Ln Meredith Ln 08/08/25 10/30/25 Emergency pond pumping per Watershed compliance order Private Development Gavin Petner Lane Closure 60 Yellowstone PI Hercules Ln Juno Ln 06/30/25 10/24/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure Exported on October 17,2025 11:57:24 AM CDT 3 Street Closure Report: Completed Closures smartsheet Er— __ • . •- . •-1 • Description Department Department • • •- 1 Cactus Cir Yucca Dr (End of street)Cul de sac 04/28/25 10/10/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 2 Congress St Ponder St Carroll Blvd 03/31/25 10/10/25 Utility installations and Engineering Megan Davidson Rolling Closure pavement replacement Crescent St W Aileen St Malone St 05/21/25 10/02/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. Ector St Cordell St University Dr(US380) 06/30/25 10/03/25 Sewer Line Being installed, Public Works Inspections Collin Cole Full Closure Manholes,pipe,paving Hilltop Rd Country Club Road(FM 1830) @ intersection 05/27/25 09/22/25 Hilltop Road at Country Club Engineering Tracy Beck Full Closure Road will be reconstructed(new 5 drainage,road,etc.)and new northbound right turn lane will be added to Country Club Road 6 Huisache St Aspen Dr Yucca Dr 04/09/25 10/03/25 Utilities and Pavement Engineering Dante Hale Rolling Closure replacement Jim Christal Rd Masch Branch Rd @ Intersection 03/14/25 10/10/25 Adding 2 Lanes E/W on Jim Public Works Inspections Kirk Winter Lane Closure 7 Christal:Transition Traffic on Southside of Jim Christal. 8 Kings Row Stuart Rd Valley View Rd 10/11/25 10/11/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement 9_ Mistywood Ln Robinwood Ln Glenwood Ln 04/28/25 09/26/25 Construction Activity Other Sheldon Gatewood Full Closure 10 Mulberry St Welch St Bernard St 11/29/24 10/01/25 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 11 Ocean Dr Atlantic Dr Nautical Ln 04/14/25 09/18/25 Sanitary Sewer install/paving Private Development Gavin Petner Full Closure repair 12 Robinwood Ln Emerson Ln Live Oak St 11/12/24 09/26/25 Full Road Reconstruction Engineering Sheldon Gatewood Full Closure 13 Robinwood Ln Live Oak St Kayewood Dr 01/27/25 09/26/25 Road reconstruction(Milling Engineering Sheldon Gatewood Full Closure and C/G Removal,Stabilization) 14 Scripture St Bonnie Brae St 1-35 Service Rd 08/18/25 10/03/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure 15 Sheraton Rd Imperial Dr @ Intersection 09/12/25 09/26/25 Utilities and Pavement Engineering Dante Hale Full Closure replacement Trinity Rd S McKinney St E Mary Ln 06/09/25 09/19/25 Force Main Waterline being Public Works Inspections Collin Cole Full Closure 16 installed,staging area and line install.Road closed to through traffic 17 Unicorn Lake Blvd State School Rd Shoreline Dr 07/03/25 09/18/25 Sanitary sewer connection and Private Development Gavin Petner Lane Closure paving repair 18 Union Cir(in entirety) Chestnut St Prairie St 05/12/25 10/02/25 Utility installations and Engineering Megan Davidson Full Closure pavement replacement. Exported on October 17,2025 11:57:47 AM CDT