2025/11/14 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Nov. 17th — 23rd
Closure Start
Street/Intersection To Date IMI Description Department Department Contact Closure Type
1 Audra Ln Lee Dr At Intersection 11/24/25 12/12/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure
2 Audra Ln Paisley St At Intersection 12/15/25 01/09/26 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure
3 Neptune Dr Redstone Rd Selene Dr 11/24/25 05/08/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure
4 Royal Acres Hercules Ln Sherman Dr 12/01/26 06/26/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure
Exported on November 14,2025 11:52:14 AM CST
2 Street Closure Report: Current Closures smartsheet
M& -8= 1hbm Description Department Department Contact Closure Type
17St
Panhandle St Crescent St 05/02/25 12/05/25 Utility installations and pavement replacement. Engineering Megan Davidson Full Closure
2Haynes St Congress St 08/11/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
3Redstone Rd Selene Dr 07/24/25 02/13/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
4Redstone Rd Selene Dr 09/29/25 03/28/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure
5 Audra Ln Lattimore St Rustling Oaks Dr 09/24/25 11/28/25 COD Water department to perform taps for developer. Private Development Zabdiel Mote Lane Closure
6 Audra Ln Rustling Oaks Dr Oak Tree Dr 09/24/25 11/28/25 COD Water Department to perform water taps for developer. Private Development Zabdiel Mota-Baldems Lane Closure
7 Audra Ln Mack PI At Intersection 11/10/25 11/28/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure
8 Audra Ln(EB) Audra Ln Oak Valley 10/01/25 11/28/25 COD Water department to perform water taps. Private Development Zabdiel Mote Lane Closure
9 Audra Ln(EB) Audra Ln Oak Valley 10/01/25 11/28/25 Utility Contractor to install drainage pipe across Audra Lane. Private Development Zabdiel Mota-Baldems Lane Closure
10 Audra Ln(WB) Audra Ln Oak Valley 10/01/25 11/28/25 COD Water Department to perform water taps. Private Development Zabdiel Mot. Lane Closure
11 Audra Ln(WB) Audra Ln Oak Valley 10/01/25 11/28/25 Utility Contractor to install drainage pipe across Audra Lane. Private Development Zabdiel Mota-Baldems Lane Closure
12 Ave A Maple St Underwood St 09/02/25 11/28/25 Mabak installing utilities Public Works Inspections Stephany Trammell Lane Closure
13 Bonnie Brae St Caril AL Lago University Dr(US 380) 09/19/25 12/12/25 Contractor will be installing storm drain lines,laterals,and curb inlets Engineering Jesus Perez Lane Closure
along Bonnie Brae.
14 Bonnie Brae St S Willowwood St Parvin St 09/08/25 12/19/25 Installation of drainage infrastructure,embankment work in advance of Engineering Robin Davis Full Closure
street widening.(Access to Natl Wholesale&residents only)
15 Buckingham Dr Hercules Ln Sherman Dr 11/17/25 07/03/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure
16 Carlton St Aileen St Malone St 07/23/25 11/30/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
17 Cordell St Fulton St Coil St 09/15/25 01/23/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
18 Denton St Hickory St Congress St 06/02/25 12/05/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure
19 Donna Rd Elm St End 11/17/25 03/27/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure
20 Eagle Dr Ave C Ave A 03/17/25 01/02/26 Using it or an entrance due to elevation changes in the jobsite it is the Public Works Inspections Collin Cole Lane Closure
only way to get into the site
21 Emery St Dead End Alice St 09/29/25 02/13/26 Full Road Reconstruction Engineering Megan Davidson Full Closure
Fulton St N Cordell St Emery St 09/29/25 02/13/26 Full Road Reconstruction Engineering Megan Davidson Full Closure
Hickory Creek Rd Riverpass Dr Country Club Rd(FM 1830) 03/13/23 12/31/26 Bridge Installation Engineering Tracy Beck Full Closure
2- Hobson Ln Forrestridge Dr Country Club Rd 10/30/25 11/30/25 Signage and striping on Hobson Lane. Public Works Inspections Gavin Petner Full Closure
25 Hobson Ln Forrestridge Dr Country Club Rd 10/30/25 12/15/25 replace failing concrete pavement and striping Private Development Gavin Petner Full Closure
26 Huntington Dr Sun Valley Dr Hercules Ln 10/20/25 03/31/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure
27 Juno Ln Atlas Dr Stuart Dr 04/09/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure
28 Kirby Dr(3805) Sisson(Dr San Felipe Dr 11/17/25 12/19/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
29 Lafti.ora St Mozingo St Audra Ln 09/24/25 11/28/25 Water taps to be performed by COD Water Department. Private Development Zabdiel Mote Rolling Closure
30 Margie St Ave A McCormick St 11/17/25 12/15/25 Installing sewer Public Works Inspections Stephany Trammell Full Closure
31 Mayhill Rd S 600ft North of Edwards Rd 400ft South of Edwards Rd 10/20/25 07/30/26 Waterline tap being installed on Mayhill Easment Public Works Inspections Collin Cole Rolling Closure
321 Mockingbird Ln Mingo Rd University Dr(U.S.380) 06/16/25 11/28/25 Bore work to install new sanitary sewer line. Private Development Zabdiel Mote Lane Closure
33 Mounts Ave Congress St W Haynes St 08/01/25 12/01/25 Utility installations and pavement replacement Engineering Megan Davidson Full Closure
3 Normal St Scripture St Oak St 08/18/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
35 Northridge St Hinkle Dr Bolivar St 04/16/25 04/20/26 Utilities and Pavement replacement Engineering Dante Hale Rolling Closure
36 Nottingham Dr Churchill Dr Devonshire Ct 10/20/25 11/26/25 Bridge Deck and Curb Repair Streets Roy San Miguel Lane Closure
Oak St Carroll Blvd Fry St 04/21/25 11/28/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
Oak St Welch St Ave C 04/28/25 11/28/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
3. Parkway St Denton St Carroll Blvd 10/20/25 04/21/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
40 Pershing Dr Atlas Dr Stuart Rd 05/08/25 12/15/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure
41 Ponder Ave Oak St W Panhandle St 06/02/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure
42 Prairie St Welch St Bernard St 11/05/25 03/06/26 Pavement replacement Engineering Scott Fettig Full Closure
43 Quail Creek Dr Berry Down Ln Stockbridge Rd 10/20/25 04/20/26 Waterline Tap being installed/Road patch Public Works Inspections Collin Cole Lane Closure
44 Redstone Rd Hercules Ln Neptune Dr 05/05/25 06/12/26 Utilities and Pavement replacement Engineering Dante Hale Full Closure
45 Scripture St Jagoe St Ponder St 03/04/25 03/31/26 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
46 Sheraton Rd Imperial Dr Sun Valley Dr 08/11/25 12/12/25 Utilities and Pavement replacement Engineering Dante Hale Full Closure
47 Stockbridge Dr Hudsonwood Dr Quail Creek Dr 10/20/25 04/20/26 Utilities being upsized Public Works Inspections Collin Cole Lane Closure
48 Sunnydale Ln Sun Valley Dr Kings Row 07/10/25 12/05/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
49 Sunset St Carroll Blvd Bolivar St 07/07/25 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Full Closure
50 Welch St Eagle Dr Mulberry St 05/31/24 12/31/25 Utility installations and pavement replacement. Engineering Scott Fettig Rolling Closure
51 Welch St Mulberry St Hickory St 10/01/25 01/09/26 Utility relocation and pavement replacement Engineering Megan Davidson Full Closure
Exported on November 14,2025 11:52:23 AM CST
3 Street Closure Report: Completed Closures smartsheet
Street/ • . •- . •-1 • Description Department Department • • •-
1 Alice St Sunset St University Dr(US 380) 05/27/25 11/14/25 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
2 Audra Ln Oak Tree St At Intersection 11/03/25 11/21/25 Sidewalk/ADA Repair Streets Roy San Miguel Lane Closure
3 Crater Lake Ln(2809) Como Lake Rd Herring Ct 10/13/25 11/14/25 Concrete Panel repair Streets Roy San Miguel Lane Closure
4 Dunlavy Rd(3800) Hillcroft Ave Bissonet Dr 10/20/25 11/21/25 Concrete Panel Repair Streets Roy San Miguel Lane Closure
5 Egan St Carroll Blvd Bolivar St 05/07/25 11/14/25 Utility installations and Engineering Megan Davidson Full Closure
pavement replacement.
6 Emery St Ector st Bonnie Brae St 10/27/25 11/14/25 Installing Pre cast sewer Private Development Public Ryan Donaldson Lane Closure
Manhole/drainage work Works Inspections
7 Fry St Oak St Hickory St 04/28/25 10/31/25 Mastec relocating gas lines Public Works Inspections Stephany Trammell Rolling Closure
8 Mills Rd Mayhill Rd Cunningham Rd 09/15/25 11/21/25 Water and Sewer installations Private Development Public Alexander Cervantes Full Closure
for Ryan HS project Works Inspections
Mulberry St Ave C Ave D 10/01/25 11/21/25 Water Dept/Tri Dal will be Private Development Public Ryan Donaldson Lane Closure
9 performing water taps/asphalt Works Inspections
repairs/sewer manhole
installation
10 Panhandle St(2525) East Park Blvd Bonnie Brae St 07/31/25 10/31/25 Paving driveway approaches/ Private Development Public Ryan Donaldson Lane Closure
sidewalks. Works Inspections
11 Ranchman Blvd(3617) Sundown Blvd @ Intersection 09/01/25 10/24/25 ADA and Sidewalk Repair Streets Roy San Miguel Lane Closure
12 Selene Dr Neptune Dr Stuart Rd 06/04/25 11/07/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Sun Valley Dr Buckingham Dr Sheraton Rd 10/20/25 11/14/25 Utility work and pavement Engineering Dante Hale Full Closure
Repair
14 Sunset St University Dr W Carroll Blvd 01/20/25 11/14/25 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Willowood St Bonnie Brae St 500ft East 09/29/25 11/23/25 Full Road Reconstruction Public Works Inspections Robin Davis Full Closure
16 Wind River Ln Widgeon Ln Meredith Ln 08/08/25 10/30/25 Emergency pond pumping per Private Development Gavin Petner Lane Closure
Watershed compliance order
17 Yellowstone PI Hercules Ln Juno Ln 06/30/25 10/24/25 Utilities and Pavement Engineering Dante Hale Full Closure
replacement
Exported on November 14,2025 11:52:35 AM CST