Loading...
1993-0662517L/1589 NO. .3 -do AN ORDINANCE AUTHORIZING THE EXECUTION OF A CHANGE ORDER TO A CONTRACT BETWEEN THE CITY OF DENTON AND GRACON CONSTRUCTION ; PROVIDING FOR AN INCREASE IN THE CONTRACT PRICE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on JULY 21, 1992 , the City awarded a contract for the construction of certain improvements to PECAN CREEK WASTEWATER TREATMENT PLANT IMPROVEMENTS in the amount o 8,647.000.00 ; an WHEREAS, the City Manager having recommended to the Council that a change order be authorized to amend such contract with respect to the scope and price and said change order being in compliance with the requirements of Chapter 252 of the Local Government Code; NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF DENTON: SECTION I. That the change order to the contract between the City and ON CONSTRUCTION , a copy of which is attached ereto, n the amount o ONE OUSAND ONE HUNDRED , EIGHTY SEVEN AND no/100------------------ O ars 71,187.00 , Is hereby approved an t e expenditure of funds therefor is hereby authorized. SECTION II. That this ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the p-11144J day of 1993. BOB CASTLEBERRY, ATTEST: A"ROVE]Y AS TO LEGAL FORM : DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY BY: A/~ " C ~j CHANGE ORDER [CO] PAGE 1 OF 3 Project: Pecan Creek WWTP Improvements Proiect Numbers Owner: City of Denton. Texas Owner: U-102 (City) Engineer: Alan Plummer and Associates In Engineer: 457-0425(APAI) Contractor: Gracon Construction Company Contractor:9203 Change Order No: 05 Date: _ 03/30/93 The compensation agreed upon in this Change Order is a full, complete and final payment for all costs the Contractor incurs as a result of or relating to this change, whether said costs are known, unknown, foreseen or unforeseen at this time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of this change. CHANGE ORDER WORK TO BE PERFORMED Proposed Contract Modification 1. Reference CMR 46: Time Extension/Days Amount $ This CNm charges the City for applying Concrete Gunite to slopes of the Diurnal Equalization Basin 0 $61,237.00 2. Reference CMR 43: TOTAL This Cam charges the City for applying Hydromulch to slopes of the Storm Water Equalization Basin 0 $9,950.00 0 $71,187.00 Exhibit I CHANGE ORDER [CO] Original Contract Amount (Gracon Construction Co.) Net Increase or Decrease in Contract Amounts: PAGE 2 OF 3 $ 8,647,000 Previous Change Order No. 1 6,125.00> Previous Change Order No. 2 9,640.97> Previous Change Order No. 3 $ 2,982.00 Previous Change Order No. 4 4,950.83> This Change Order No. 5 $71.187.00 Total of Change Orders $53,452.20 Revised Contract Amount $8,700,452.20 Net Change in Contract Time 0 Calendar Days Revised Contract Completion Time 730 Calendar Days Percent Change Order per Original Contract Amount 0.62V ATTACHED: CM 46, 43 Distribution: 457-0425 D.22 457-0420 D.22 Gracon Construction: Joe Graves Ron Janson City of Denton: Dave Ham Purchasing Finance R. E. Nelson Lee Allison CHANGE ORDER [CO] 3 ?age of 3 Recommended by Consulting Engineer: ay ~LA~ 2~l for Alga lumo:er and As/OCiates, Inc. Date : 3-T~►,_ 4 3 " Approved by Contractor By Si f aeon Construction In 6. Date: 331 A3 Approved by Manager of Construction projects: Sy 67, ca~~P44-j for Citg of Denton, Texas Approved by purchasing Agent for city of Denton, Texas Approved by Director of Water Engineering and Operations Sy or Ciy of Denton, Texas ($0 - $5,000) Approved nceautive Director of Utilities By ($a,00i - for City of Denton, Texas $14,999) Approved by city Council SY , City manager for City of Denton, Texas ($15,000 and above) .up DATE: APRIL 27, 1993 CITY COUNCIL REPORT TO: Mayor and Members of the City Council FROM: Lloyd V. Harrell, City Manager SUBJECT: CHANGE ORDER #5 - GRACON CONSTRUCTION RECOMMENDATION: We recommend that change order #5 be approved in the amount of $71,187.00 to Gracon Construction Co. for the Wastewater Treatment Plant Improvements contract. SUMMARY: This change order is for (1) $61,237.00 to "Gunite" stabilize the side slopes of the Diurnal Equalization Basin and (2) $9,950.00 to "Hydromulch" stabilize the side slopes of the Storm Water Equalization Basin (Total $71,187.00). The Equalization basin is of earthen construction and is composed of two chambers; one for Diurnal (midnight to midnight) flow fluctuation and one to accommodate inflow during storm events. The side slopes of the Diurnal Equalization basin and the Storm Water Equalization Basin were designed with concrete slope stabilization. The final Engineer's Estimate (Alan Plummer and Associates) for this project indicated this concrete stabilization for these two Equalization Basins would be costly and would exceed our budget for this project of $11,000,000. The concrete stabilization therefore was deleted. However, the low bid for this contract by Gracon Construction Company came in at $8,647,000. With the construction of these Equalization Basins almost finished, the side slopes have experienced considerable erosion after the heavy rains. Continued erosion of soil into the bottom of these Basins will cause a serious operational and maintenance problem when soil gets into the pipes, pumps and other wastewater treatment equipment. Alan Plummer and Associates has recommended concrete "Gunite" side slope protection for the Diurnal Equalization Basin and "Hydromulching" grass protection for the Storm Water Equalization Basin to solve this problem. BACKGROUND: Executed change order recommendation documents, contractors modification request, Gracon proposal, Gracon letter date 3-19-93; excerpt minutes for PUB meeting of 4-5-93. DEPARTMENTS OR GROUPS AFFECTED: Citizens of Denton, Denton , and Gracon CITY COUNCIL REPORT APRIL 27, 1993 PAGE 2 OF 2 FISCAL IMPACT Alan Plummer and Associates Engineer's Estimate Original Contract Amount (Gracon Construction Co.) Net Increase or Decrease in Contract Amounts: Previous Change Order No. 1 6,125.00> Previous Change Order No. 2 9,640.97> Previous Change Order No. 3 $ 21982.00 Previous Change Order No. 4 4,950.83> This Cha nge Ord er No. 5 $71 ,187.00 Total of Change Orders Revised Contract Amount Net Change in Contract Time Revived Contract Completion Time % of all Change Orders per Original Contract $11,000,000 $ 8,647,000 $53,452.20 $8,7001452.20 0 Calendar Days 730 Calendar Days 0.62% peccttffully submitted: Lloyd V . Harrell City Manager Approved: Name: Tom D. Shaw, C. P.M. Title: Purchasing Agent agenda.361 2CN'YAC'CR'z uC0lr`A'iCN - E'^L , E., LLi CWNE.R C17Y OF OE.NTCN I 040 s` Nn ?RCZC' ' ?CAN C,RZEEX w TP IMPROVEMENTS 1 OWNER U102 CONTRACTOR JRACCN CCNSTRUC710N INC. 1CCNTRACTOR 9203 ENGUN M ALAN PLUMNIS ANO ASSOCIATES INC. ENGINEER 457-0425 RESIDENT REPRESENTATIVE CLE T E MARTIN nua Mm 14 3 1 NOTIFICATION BY CONTRACTOR: WE ARE PROPWNO TO MAKE THE CHANGE TD THE CONTRACT OFSCRNBBD IN THE ATTACHED MATI,RW.S AND REM= THAT Your ME THe F=wM ACTION: ❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANCE DOHS NOT REQUIRE A CHANCE !N CONTRACT TIME OR AMOUNT AND ISSUE A I= ORDER. ISSUE A CHANGE ORDER FOR PER1~'CRMING THE DESCRIBED CHANGE, CHANGE IN CONTRACT AMOUNT AND TIME ARE INDICATED IN ATTACHED OLTAIU ED COST BREAKDOWN AND REVISED SCHEDULE. C ISSUE A CHANCE ORDER FOR THE OESCRIBED CHANCE MATH PAYMENT AT THE UNIT PRICE MO. r BY: CMTRAC"OR M. PROCEED MTN THE OW= UNDER THE TIME AND MATMALS THE CONIRACr. OATS E'NGIN'E RESPONSE: W RESPOND TO YOUR REQUEST AS ~vLLoft Q WE CONCUR THAT THIS IS A NO CAST at TIME CHAW& SEE ATTACHED 1=1ELID ORDER FOUR PROPOSAL IS RECCMMVJM TO THE OW ML SEE ATTACHED CSIANGE ORDER Q PROC£EJ' MATH THE CHANCE AT THE UNIT PRICE BID. SEE ATTACHFA CHANC;< ORDER Cf P WITH AN "Illlt THE 71ME AND MATERIALS PROMMINS O► TM CONTRACT. BY: OATS 3 3/ 9 3 ACTION TAKEN: ❑ PROPOSED CONTRACT MODIFICATION RE.EM CONTRACTOR NOTIFIED NOT TO PROCEED. Brt DATE: CI mw ORDER ISSUED: No. OATE n MANGE ORDER ISSUED: NO. DATE 3 gT; 6/°M- '4~" toe Te Gt~y47'X. envr~ec~.~Ite,7,a , dam/ .yam MFG S-L oe /Z pp ~P X6 : P F hitM y5~.o~IZs o.i~ ~57~py2U D,/~ 2142228542 APAI/DENTON;tt 2 DENT aY:Xerox Telecooier 7020 3-11-93 12:15 NQv oy; xerox w ecopler 'l Ulu 3- o-8a 10;49 + 517 284 2837-6 2142225542;4 3 March S. 1993 Rubel's Landscape Services Specifications for establishing of vegetation at Pecan Creek Waste Treatment Plant, 1100 Mayhill Road, Denton, Texas. 1. HYDROMULCHING: A. Seed - It is proposed that a seed mixture of 2 to 4 pounds of annual rye grass and 2 pounds of unhulled bermuda grass be applied per 1.000 square feet of area. B. Mulch - Cellulose fiber mulch will be applied at the rate of 50 pounds per 1,000 square feet. C. Fertilizer - A 16-20-0 or 13-13-13 analysis fertilizer will be applied at the rate of 20 pounds per LOD square feet. D. Tackifier - A sufficient quantity of tackifier will be used to hold hy- dromulch mixture in place until turf establishment, with a minimum of one pound per 1,000 square feet. 2. WATERING: Watering will be the responsibility of Rubel 's Landscape Services. A tem- porary irrigation stem, using aluminum irrigation pipe, will be set up. Rubel 's will instasyll and operate the irrigation systes. until a uniform stand of grass is established. Mater will be obtained from two existing fire hy- drants located on the site. Water will be furnished by others, 3. MAINTENANCE: 4. GUARANTEE: After grass growth has started, all areas or parts of areas which fait to show a uniform stand of grass for any reason whatsoever shall be reseeded as necessary. CONTRACTOR'S MODIFICATION REQUEST [CMR] OWNER CITY OF DENTON PROJECT NO, PROJECT PECAN CREEK WWTP IMPROVEMENTS OWNER 0102 CONTRACTOR GRACON- CONSTRUC71ON INC. CONTRACTOR 9203 ENGINEER ALAN PLUMMER AND ASSOCIATES. INC. ENGINEER 457-0425 RESIDENT REPRESENTATIVE CLETE MARTIN CMR NO. q (,n j NOTIFICATION BY CONTRACTOR: &u WE ARE PROPOSING TO MAKE THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOYNNG ACTION: ❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT TIME OR AMOUNT AND ISSUE A FIELD ORDER. ISSUE A CHANGE ORDER FOR PERFORMING THE DESCRIBED CHANGE CHANGE IN CONTRACT AMOUNT AND TIME ARE INDICATED IN ATTACHED DETAILED COST BREAKDOWN AND REVISED SCHEDULE ❑ ISSUE A CHANGE ORDER FOR THE DESK CHAN'- WITH PAYMENT AT THE UNIT PRIG: BID. 13 BY: DATE /Z~-- ENGINEER'S RESPONSE: WE RESPOND TO YOUR REQUEST AS FOLLOYYS: ❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE SEE ATTACHED FIELD ORDER. _'~'WR PROPOSAL IS RECOMMENDED TO THE OWNER. SEE ATTACHED CHANGE ORDER. PROCEED MATH THE CHANGE AT THE UNIT PRICE BET. SEE ATTACHED CHANGE ORDER. ❑ PR ='M CH UNDER THE TIME AND MATERIALS PROVISIONS OF 2 7, BY: DATE: 3 3 ACTION TAKEN: ❑ PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED. BY: DATE FIELD ORDER ISSUED: NO. DATE BY: ~ l CHANCE ORDER ISSUED: NO. DATE 3 3/ g3 BY. `~C, : ~57~`~Z S J ~ 8 YS7-~yZo i~. TRACTOR TO PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS CONTRACT. ' ' 1, 1 v= 9 zm' " MAILING ADDRESS: P.O. BOX 850756, MESQUITE, TEXAS 75185-0756, PHONE: (214) 222-8533 _ Fax: (214) 222-8542 March 11, 1993 Alan Plummer & Associates, Inc. 210 West Sixth Street, Suite 400 Fort Worth, Texas 76102-4803 Attn: Clete Martin Re Pecan Creek Wastewater Treatment Plant - Denton, Texas Dear Clete: We propose to place a gunite slope protection on the slopes of the diruanal basin as per the following specifications: 3000 psi gunite - 3" thick 6-6-10-10 wire mesh 1-3/8" rebar in anchor trench @ top broom finish Our proposed cost per sq. ft. is $2.09. The total area on the slopes is 29,300 sq. ft. - This price is goad for any quantity from 20,000 to 3,000 sq. ft. Very truly yours, GRACON C STRU By R. Janson RLJ/ss ION, INC. STREET ADDRESS: 4343 LASATER. MESQUITE, TEXAS 75181 Alan Flu.er and ASSO( tes, ISC. ENVIRG'•HENTAL CIVIL ENGINEERS 457-0420 March 19, 1993 Mr. Robert E. Nelson, P.E. Executive Director Denton Municipal Utilities 215 East McKinney Street Denton, Texas 76201 RE: Pecan Creek Wastewater Treatment Plant Improvements Equalization Basin Slope Protection Dear Mr. Nelson: James L. Altstaetter, P.E. John H. Cook, P.E. Peggy W. Glass. . Alan H. Plummer. Jr Richard H. Smith, P E. As you are aware, Gracon Construction Company is proceeding ahead of schedule with construction of improvements to the City's Pecan Creek Wastewater Treatment Plant. Construction of both the Diurnal and Storm Water Holding Basins is now nearing completion. With the recent rains, we have observed substantial erosion of the Diurnal Basin slopes resulting in a considerable amount of silt being deposited in the basin effluent channel. This could eventually result in blockage of the effluent line to the return pumps if left unchecked We recommend that the slopes of the diurnal basin be protected to eliminate the erosion by guniting the side slopes of the basin. Gracon has quoted a price of approximately $65,000 to perform this additional work, if the work is approved prior to installing the air diffusers in the bottom of the basin. After the air diffusers are installed, the price would increase significantly because all work would have to be done from the top of the basin. Initially, we had included concrete paving of the diurnal basin slopes as part of the construction project. However, after our final opinion of p.obable construction cost indicated that the project might exceed the project budget, and the prc jected cost for the concrete slope protection was approximately $200,000, the slope protection was deleted from the project. We feel the pneumatically applied concrete, gunite, is a cost-effective alternative to provide the slope protection necessary and recommend that the City authorize Gracon to proceed with this additional work. ESNIBIT II 210 Wet. Sixth Street 0 Sutte 400 • Fort Worth, Texas 76102.4803 • (817) 3324085 • Metro (817) 429-9567 • FAX: (817) 338-4626 Mr. Robert E. Nelson, P.E. Page 2 March 19, 1993 If you have any questions concerning this matter or require any additional information, please let me know. Sincerely, ALAN PLUMMER AND ASSOCIATES, INC. / "/'g- A. Lee Head, III, P.E. Enclosure ALH:mds cc: Mr. C. David Ham, City of Denton, Texas Mr. Lee Allison, Director of Engineering, City of Denton, Texas Mr. Howard Martin, Director of Environmental Operations, City of Denton, Texas Mr. Clete Martin, Alan Plummer and Associates, Inc., Fort Worth, Texas EXCERPT FROM PUBLIC UTILITIES BOARD MINUTES April 5, 1993 The following item was considered: 5. CONSIDER CHANGE ORDER NO. 5 IN THE AMOUNT OF $71,187.00 TO GRACON CONSTRUCTION CO. FOR THE WASTEWATER TREATMENT PLANT IMPROVEMENTS CONTRACT. Ham reviewed this item. After extensive discussion, Laney made a motion to approve Item #1 as presented. Second by Giese. All ayes, no nays, motion carried. pub excerpt 2/03/93