Loading...
1992-142AN ORDINANCE AUTHORIZING THE EXECUTION OF A CHANGE ORDER TO A CON- TRACT BETWEEN THE CITY OF DENTON AND APAC OF TEXAS INC. FOR A RE- DUCTION IN THE CONTRACT PRICE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on July 7, 1992, the city awarded a contract for Taxi- way and Apron Improvements in the amount for $731,091.50; and WHEREAS, the City Manager having recommended to the Council that a change order be authorized to amend such contract and said change order being in compliance with the requirements of Article 2368a, V.A.C.S.; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION I. That the change order reducing the amount of the contract between the City and Apac Texas Inc. in the amount of Eighty Three Thousand Nine Hundred Ninty Two & No/100 ($83,992.00), a copy of which is attached hereto, is hereby approved. SECTION II. That this ordinance shall become effective immediately upon it passage and ~pproval. PASSED AND APPROVED this day of , 1992. ATTEST: BOB CASTLEBE Y, JENNIFER WALTERS, CITY SECRETARY DEBRA A. DRAYOVITCH, CITY ATTORNEY AUG 28 '9~ 13:31 FREES£-NICHOLS PAGE.02 ~RO~BC'f: Runway Overlay & Taxiway Zmprovements OWMBR: City of Denton PRO~IOT ~0. N/A ~ON~LO'~,I Apes-Texas, Xno. ~R~0T MO. msmxsBnt Preese and ~ichois ~nc. ~HCT MO. D~ 92077 R~BMOBI P~ ~O. One (~) ~TB: August 27, ~gg2 The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents. Authorisation to proceed with ~heae changes must be approved by Field Order or Change Order in accorWAn~e with the Contrast DOcuments. Deletioml Delete stress absorbing membrane interlayer from project. Delete the Temporary Lighting from the project. Add minimum 5.5 oz. geotextX~e fabrio to rspXace stress absorbing membrane interlayer. Apply AC-20 asphaX~ aXong with geo~extiXe fabric. Contrac~oF*s woF~ hours shaXX be from 9:00 a.m. to 6:00 p.m. Tbs Contractor shall be provided approximately 2,5o0 linear feet of runway available for construction. Contractor shall complete work on ~e runway within 21 working days afte~ star~ing to work. Rs&sons for Xnst~uotions: To reduce ~e cons~o~Xon ~Xme between ~he spo~ repaXFs and ~he cons~Fuc~X0n o~ ~he oveFXay, a geo~ex~X~e vX~X be ~a~d down before ~e b~umXnous oveFXay, ~he ~empoFa~ LXgh~Xng vXL~ no~ be ~equX~ed s~noe ~he F~vay ~XXX be open ~o ~FaffX. each nXgh~. P~epaFed by ~EEBB ~ NX~OLI, By ~. Schuelein, P. I. Pro~ec= Engineer Filename: P~0L.P~ TOTAL PAGE.B~ ~ CHANGE ORDER PROJECT: Runway Overlay & Taxiway Impvmts. PROJECT NUMBER DTN92077 CONTRACTOR: Apac-Texas, Inc. ENGINEER: Freese and Nichols Inc. OWNER: City of Denton CHANGE ORDER NO.: One (1) DATE: August 27, 1992 Make the following additions, modifications or deletions to the work described in the Contract Documents: Add: New Item 5- 84,400 S.Y. of 5.5 oz. Geotextile @ $1.50 S.Y. $ 126,600.00 Delete: Item No. 5 84,400 S.Y. Stress Absorbing Membrane Interlayer @ $ 2.43 S.Y. ($ 205,092.00) Item No. 8 Temporary Lighting L. S. 8 ($ 5,500.00) NET CHANGE IN CONTRACT AMOUNT ($83,992.00) The compensation agreed upon in this Change Order is fuZZ, compZete and f~na[ payment for aZZ costs the Contractor may incur os a resuZt of or reZating to this change whether said costs are known, unknown, foreseen or unforseen at this t~me, incZuding without limltation, any cost for de~ay, extended overhead, r~ppZe or impact cost, or any other effect on changed or unchanged work as a result of this Change Order. Previous Contract Amount $ 731,091.50 Net Change in Contract Amount $ 83,992.00 Revised Contract Amount $ 647,099.50 Previous Contract Time 60 CALENDAR DAYS Previous Substantial Completion Date November 1, 1992 Previous Final Completion Date November 1, 1992 Net Change in Contract Time Revised contract time Revised Substantial Completion Date . Revised Final Completion Date Recommended by Approved by FREESE AND NICHOLS, INC. APAC- TEXAS, INC By ~.~ ~-Z~~ov~._ By u Date ~,~: ?' ~; "~ ~ IV~AB!N ~ Date Approved by 8/22/9:, PROPOSED CONTRACT MODIFICATION ~ROJECT: I~,.~A~ o~-~.~l~'f' ~.~'A~-c ]2~(~e-~w~'~<~ PROJECT NUMBER OWNER: ~ ~ CONTRACTOR: ~ P~~: ENGINEER: ~ ~ ~,~wo~. ~CM DESCRIPTION: ~mo~m PCM NO. NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, modifications or deletions to the Work described in the Contract Documents as shown in Attachment "A".. We request that you take the following action within 10 calendar days: ~ Notify us that you concur that this change does not require a change in Contract time or amount. A Field Order will be issued. ~ Submit a Price Proposal with detailed cost breakdown of labor, materials, equipment, all other cost related to this change and a revised schedule for performing the described change. D Proceed with the change. Payment will be made at the unit price bid. ~ Proceed with the change under the time and materials provisions of the Contract. kuthorization to proceed with changes must be approved by Field Order or Change Order in accordance with the Contract Documents. By: ~ ~,_, ~ ~ ~0~__ Date: ~-~-~ CONTRACTOR' ~RESPONSE: We respond to your request as follows: ~ We concur that this is'a no cos% or time change. Issue Field Order. ~ We submit the attached Price Proposal with detailed cost breakdown and revised schedule for performing the described change. G We are proceeding with the change at the unit price bid. ~ We are proceeding with the change under the time and materials provisions of the Contract. By:~ ....... ~ ~~ Date: ACTION TAKEN: ~A~.~C',H D Proposed ~ract, Modification rejected. Contractor is hereby notified D Field Order issued: No. 'Da~e: By: ~ Change Order issued: No. O~Cl% Date: ~-ZT~ By: 8/20/91 AUG 27 '9~ 09i31AM APAC-TEXAS IMC FORT WORTI~ FORT WORT~ SRAHCH '90[ S TEXAS ~TREET P,O, BOX leO7 DEHTOH~ 1E×~S : Fo~t Wor~h~ Tex~s 7~[01 P~ojee~ HtL~bet~ 3-A6-0067-07-~ Seq. Hb? De~e~iptio~ Q~an~i~y U/H ~l~ Ite~ Code OlOl ~ITU~%HOUB 8URF~C[ COUR~£ ll!AO,O00 TO~ ~8,000 311$EO. O0 0~04 p~U[H[HT HILl. IH6 eGS3,000 ~Y ~,500 0106 ~HOULD~R ORatING [,000 L~ 8~00,000 8800,00 0107 T[~PORARY ~AR~IH~ '. i,O00 LB ~500,000 010~ H[R~ICID[ ES.000 6~L 80,000 500,00 O~iO PDLY~[~ ~OD R~Pfl, TRE~TH~HT 60000,000 SY ~,350 14i000,00 Total Amount ~A70~9,50