AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AMENDING THE SCHEDULE OF
ELECTRIC RATES BY ADOPTING ANAMENDED SCHEDULE TGS (GENERAL SERVICE
TIME OF USE RATE), AND PROVIDING FOR AN EFFECTIVE DATE
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I That the Schedule of Rates for electrical services,
as adopted by Ordinance No 90-168, is amended by amending the
provisions of Schedule TGS (General Service Time of Use Rate), a
copy of which is attached hereto in Exhibit "A" and incorporated by
reference herein
SECTION II That this ordinance shall become effective May 1,
1992
PASSED AND APPROVED this the~~ day of ~ , 1992
BOB ~ASTLEBERRY, MAYOR /
/
ATTEST
JENNIFER WALTERS, CITY SECRETARY
APPROVED AS TO LEGAL FORM
DEBRA A DRAYOVITCH, CITY ATTORNEY
EXHIBIT "A"
SCHEDULE TGS
GEN~P~AL SERVICE TIME OF USE (TGS)
[Effective ]
APPLICATION
Applicable to any commercial and industrial user for all
electrzc service suppl~ed at one point of delivery and measured
through one meter who has peak electrlcal loads during off peak
hours
Customers electing to utilize the TGS rate may change to this
rate only during the month of June and must remain on th~s rate for
a m~nimum of twelve (12) continuous billzng months
Not applicable to resale service in any event, nor to
temporary, standby or supplementary service except In conjunctIon
w~th applicable r~der
(1) Customer Facility Charge $25 00/30 days Single Phase
$30 00/30 days Three Phase
(2) On-Peak Demand Charge $12 50/KW of On-Peak Demand
(3) System Demand Charge $ 4 00/KW of System Demand
(4) Energy Charge $ 01/KWH
(5) Energy Cost Adjustment Per Schedule ECA
The minimum monthly bill shall be the sum of the Customer
Facility Charge, the On-Peak Demand Charge, and the System Demand
Charge, but not less than 70% of the maximum monthly total demand
charge~ for any month during the preceding months of May through
October
Secondary service available to con~nercial and industrial
customers
The City will supply single-phase service (or three-phase
service if available at the/point of delivery) at sixty (60) cycles
and atlany standard voltages available from the City's distribution
system through one standard transformation Where service of the
type desired by the customer is not already available at the point
of service, special contract arrangements between the City and the
customer may be required prior to Its bezng furnished
DETERMINATION OF ON-PEAK DEMAND
The On-Peak Demand shall be the maximum KW demand supplled
durlng the fifteen (15) mlnute period of maximum use during the on
peak hours as recorded by the City's demand meter and adjusted for
uower factor The minimum monthly bill for On Peak Demand shall be
one hundred percent (100%) of the maximum on-peak demand, similarly
determIned during the previous billing months of June through
September in the twelve (12) months ending with the current month
The on-Peak Demand will be billed every month
DETERMINATION OF SYSTEM DEMAND
The System Demand shall be the maximum KW demand supplied
during the fifteen (15) minute period of maxlmumuse as recorded by
the City's demand meter and adjusted for power factor, but not less
than one hundred percent (100%) of the maximum system demand
s!mllarly deterr~lned during the previous billing months of June
through September in the twelve (12) months ending with the current
month
POWER FACTOR PENALTY
The City reserves the right to determine the power factor of
the customer's installation served during the period of maximum
demand or by measurement of the average power factor for the
monthly billing period If the power factor is below ninety
percent (90%), on-peak and average demand for the demand for
hilling purposes will be determined by multiplying the unadjusted
hilling demand by ninety percent (90%) and dividing by the
determined power factor
DEFINITION OF ON-PEAK HOUWS
The City's on-peak hours, for the purpose of this rate
schedule, are designated as being from I 00 P M to 8 00 P M each
Monday through Friday, starting on June 1 and continuing through
September 30 each year The City,s on-peak hours may be changed
from time to ti~e and the customer will be notified twelve (12)
months prior to such changes becomzng effective
DEFINITION OF OFF-PEAK HOU~
The City's off-peak hours, for the purpose of this rate
schedule, shall be all hours not designated as on-peak hours
SUPPLEMENTAL DOWER RI~
Customers requesting standby or supplementary power shall be
allowed service under this rate schedule, however, the
determination of system demand shall be adjusted to read
The system memand shall ne t~e sum of the maxlmum KW ce~ra
supplied durlng the flfteen (15) minute period of maxlmum use as
recorded by the Clty's demand meter plus the KW nameplaze ratlrg~s)
of the customer's qenerator(s) in the event of the customer s
generator(s) Is/are off l~ne at t~e tlme of the establishment of
u~e maxlmum system demand, the KW nameplate rating cf
generator(s) unavallable for servlce shall be removed from the
determination of the system demand In no event shall the system
demand be less than seventy percent (70%) of the maximum system
demand s~m~larly determlned during the previous billing months of
June through September ~n the twelve (12) months ending with =he
current month
SPECIAL FACILITI~
Ail service which requires special facilities in order to meet
the c~stomer's service requirements shall be provided subject
special facilities rider
PROP~ATION OF UTILITY BILLS
(a) Billing for the Facility Charge shall be based on 12
billings annually using the followzng formula
Actual day ~n readin= period × Customer Charge 30
(b) Billing for demand shall be calculated on a 30-day-per-
month baszs and pro-rated for longer or shorter billing
periods using the following formula
Actual days in rea~n~ uer~d x KW Demand × Rate 30
ENERGY COST ADJUSTM~NT
A charge per KWH of energy taken for fuel cost calculated ~n
accordance with Schedule E C A
Bills are due when rendered, and become past due ~f not pa~d
w~thin fiftee~ (15) calendar days from date of issuance
TGSP. ATE ~